Category: IEE Compliance Archive
Explore our expert posts on IEE Compliance—covering safe electrical design, regulatory standards, and best practices to meet…
Navigating OSHA 269 TOV Requirements: Engineering Analysis & Mitigation
Meet OSHA 269 TOV rules with Keentel’s PSCAD-based analysis. Reduce MADs, align arc flash, and ensure safety compliance. Book your…
Read MoreWhite Paper: Implementing 2023 NEC Part 2 Code Changes
Executive Summary The 2023 NEC introduced transformative updates in Part 2, focusing primarily on wiring methods (Chapter 3) and equipment…
Read MoreDifference Between OSHA, NEC, NFPA, and NERC Compliance in Electrical Engineering
In the complex world of electrical engineering, ensuring regulatory compliance is just as critical as technical design and system performance.…
Read MoreDistribution vs Sub-Transmission vs Bulk Electric System: An Interconnection Guide
At Keentel Engineering, we track every update to U.S. interconnection policy so clean-energy projects can connect quickly and safely—whether they…
Read MoreIEEE Std 2800-2022 Compliance for Inverter-Based Resources: A Practical Guide for GOs
Transforming Grid Compliance with IBRs – A Keentel Engineering Perspective The rise of inverter-based resources (IBRs)—including solar, wind, and battery…
Read More