Office Address

400 N Ashley Dr #2600, Tampa, FL 33602

Contact Number

813-389-7871

Email Address

contact@keentelengineering.com

EHV, HV. MV Power System Studies

We are your go-to company for power system studies, including design and commissioning. Our team of engineering experts leverage their skills, knowledge and resources to provide you with outstanding engineering solutions.

Schedule A Call

Why Choose Us

At Keentel Engineering, we take pride in being the go-to engineering firm for power and utility system planning, design, control, and analysis. Some of the many attributes of our company that set us apart are:

Client-Focused Work Approach

27 Years of Experience

Attention-to-Detail

Quality with Innovation

Generation

Generation

From renewable to nuclear, the world's power generation plants rely on Keentel Engineering.

  • Grid Interconnection Studies
  • Renewable Penetration Studies
  • Design & Analyze Solar & Wind Farms
  • Validation & Compliance Reports
  • Dynamic Parameter Tuning
  • Generation Protection
  • Power Train, Aux & Safety Systems
  • Unit Commitment & Dispatch
  • Microgrid Modeling, Design & Control
  • Generation Management System
  • Operator Training Simulator
  • Generation Management System
  • Centralized Relay Asset Management
  • Plant Accounting & Settlement System
Distribution

Distribution

Modeling, planning, and operation of state-city-wide power distribution networks.

  • Planning & Optimization Studies
  • Intelligent GIS & Logical Diagrams
  • Substation & Feeder Diagrams
  • Equipment Warehouse & Sizing
  • Reliability Assessment & Indices
  • Substation & Feeder Automation
  • Smart Grid Management & Optimization
  • Advanced Fault Detection & Location
  • Automated Fault Analysis System
  • Automated Outage Restoration
  • Demand Response & Load Shedding
  • Integrated DMS & OMS Solution
  • Centralized Relay Asset Management
  • Dispatcher Training Simulator
Transmission

Transmission

Integrated grid modeling, planning, protection, and energy management solutions.

  • Multi-Area Network Planning & Simulation
  • Grid Code Compliance & Evaluation
  • Grid Interconnection Studies
  • HVDC Link & FACTS Models
  • Overhead Line Distance Protection
  • Line Constants & Coupling
  • Outage Assessment
  • Sensitivity Analysis
  • Electromagnetic Transients
  • Substation Grounding Design & Analysis
  • Security Constrained Optimization
  • Energy Management System
  • Centralized Relay Asset Management
  • Automated Fault Analysis System
Transportation

Transportation

AC & DC electrical system analysis for railways, marine, and aerospace.

  • Rail Traction System Solution for analysis and operation of HV & LV railway power and signaling systems
  • Marine, Offshore & Shipbuilding Design, operate and maintain ship, platform, and port power systems safely, while improving critical uptime
  • Airports & Aerospace Model, simulate, analyze, and operate airport & aerospace unified AC & DC power systems
Industrial

Industrial

Intelligent solutions for oil & gas, mining & metals, and manufacturing plants.

  • ‘What If’ Studies with Multiple Results of Load Flow, Faults & Arc Flash Studies and more
  • Validate before Operate
  • System Loss Reduction & Reactive Compensation Studies
  • Equipment Capacity Sizing
  • Acceleration Studies with Adjustable Drives
  • Protective Device Auto Evaluation
  • Harmonic Evaluation & Limit Compliance
  • Fast Load Shedding & Bus Transfer
  • Predictive Analysis, Control & Automation
  • Power Management System
  • Electrical Control & Monitoring System
  • Centralized Relay Asset Management
  • Operator Training Simulator
  • Situational Intelligence & Operator
Commercial

Commercial

Design, analysis, and protection of low-voltage installations.

  • Dedicated Data Center Dashboards
  • Dedicated Facility Dashboards
  • Electrical Safety System Evaluation
  • Redundancy Adequacy Assessment
  • UPS Design, Monitoring & Control
  • Failure Mode & Effects Analysis
  • Rule-Based Design per Industry Guidelines
  • Panel Board Schedules
  • Cable Sizing & Thermal Analysis
  • System / Zone Protection & Selectivity
  • Power Quality Analysis & Mitigation
  • Situational Intelligence & Operator Awareness
  • Interface with Revit & BIM Software

Experience a Reliable, Steady, and Well-Maintained Electrical Power System

Both commercial and industrial facilities require a stable and well-maintained electrical power system for seamless and smooth operations. Even the smallest of faults or electrical failures can have devastating consequences on your business like:

  • Extensive and costly downtime
  • Damage to critical equipment and inventory
  • The expense of repairing damaged electrical equipment

It is important to understand numerous points in an electrical power system where failures and faults can occur. Therefore, to increase the facility’s reliability while protecting your equipment and business operations, you need to ensure you have a well-maintained system.

This is where our power system studies can help. Our expert and certified engineers can perform an in-depth electrical diagnostic study, providing your team with the best solutions to maintain your system.
At Keentel Engineering, we specialize in:

  • Arc Flash Studies
  • Load Flow and Reactive Power Studies
  • Protective Device Coordination
  • Grounding Studies
  • Transient and Harmonics Studies

Power System Studies—Experience the Keentel Engineering Difference

Keentel Engineering performs power system analysis across all project phases—from early concept through engineering to the operational phase of installation. Our detailing and accuracy of the models help you achieve the best results.

Our engineers know and understand how important power system studies are for your business. Therefore, we accurately perform all calculations and simulations to verify the electrical system, including system components, to withstand expected stress and protect it against the potential risk of failures and faults.

At Keentel Engineering, our goal is to have an efficient, safe, and reliable power system for your facility under both normal and abnormal conditions so that you continue to experience operational efficiencies without any limitations.

Top Benefits of Power System Studies by Keentel Engineering Team

There are multiple ways your business can benefit from power system studies. Some of them include the following:

  • Collecting technical information about the system under faulty or normal conditions
  • Opportunities to lower energy cost and demand
  • Reports for highlighting problematic areas
  • Quality information on how and where your system’s energy is being utilized
  • Protective device rating reassurance
  • Ways to avoid damage and faults
  • Knowledge of the effects of transients and harmonics

The outcome of our comprehensive power system study is to provide you with information that will help you make informed decisions about your electrical distribution system.

Contact us today for more information about power system studies or technical assistance. We are here to help.

FAQ for EHV, HV, MV Power System Studies

Our Blog

Stay updated with the latest industry news and developments through our blog.

Comprehensive Power System Study Solutions by Keentel Engineering
Comprehensive Power System Study Solutions by Keentel Engineering

Comprehensive Power System Study Solutions by Keentel Engineering

Overview Keentel Engineering offers a full suite of power system studies using advanced simulation tools like ETAP, serving utilities, renewable…
Read More
White Paper: Implementing 2023 NEC Part 2 Code Changes
White Paper: Implementing 2023 NEC Part 2 Code Changes

White Paper: Implementing 2023 NEC Part 2 Code Changes

Executive Summary The 2023 NEC introduced transformative updates in Part 2, focusing primarily on wiring methods (Chapter 3) and equipment…
Read More
White Paper: Enhancing Power System Design & Analysis with PSCAD & Keentel Engineering
White Paper: Enhancing Power System Design & Analysis with PSCAD & Keentel Engineering

White Paper: Enhancing Power System Design & Analysis with PSCAD & Keentel Engineering

Executive Summary Power system design has evolved significantly with the advent of high-resolution PSCAD simulation tools like PSCAD™. As a…
Read More
SPP 2025 ITP Assessment: Enhancing Transmission Planning for a Resilient Energy Future
SPP 2025 ITP Assessment: Enhancing Transmission Planning for a Resilient Energy Future

SPP 2025 ITP Assessment: Enhancing Transmission Planning for a Resilient Energy Future

Keentel Engineering continues its commitment to energy reliability and innovation by aligning with the latest industry developments. The 2025 Integrated…
Read More
Keentel Engineering Insights: NERC Identifies New Grid Vulnerabilities – May 2025 Newsletter
Keentel Engineering Insights: NERC Identifies New Grid Vulnerabilities – May 2025 Newsletter

Keentel Engineering Insights: NERC Identifies New Grid Vulnerabilities – May 2025 Newsletter

By: Keentel Communications TeamNewsletter: May 2025 NERC Issues Critical Grid Vulnerability Alert in Latest Canadian Transmission Assessment Keentel Engineering is…
Read More
NERC Compliance Service – Empowering Grid Reliability with FERC Order 901 & Latest NERC Standards
NERC Compliance Service – Empowering Grid Reliability with FERC Order 901 & Latest NERC Standards

NERC Compliance Service – Empowering Grid Reliability with FERC Order 901 & Latest NERC Standards

Overview: Why NERC Compliance Matters In the ever-evolving landscape of power system management, maintaining compliance with NERC (North American Electric…
Read More