MEP Engineering Services
From HVAC and electrical systems to plumbing and fire protection, Keentel delivers integrated MEP engineering solutions across the U.S.—tailored for industrial, warehouse, and commercial facilities.
Our expertise extends from new construction and retrofits to BIM-driven coordination, sustainable system design, and full regulatory compliance across all disciplines.

Why Choose Keentel for MEP Engineering Services
At Keentel Engineering, we bring 30+ years of cross-discipline expertise to every MEP engineering project—whether it's a high-load industrial facility, a climate-controlled warehouse, or a complex commercial retrofit. Our team understands the nuances of building systems and delivers fully integrated mechanical, electrical, and plumbing solutions that prioritize reliability, cost-efficiency, and long-term performance.
Multidisciplinary Delivery
In-house experts across HVAC, electrical, and plumbing ensure cohesive designs that reduce coordination delays and costly field changes.
BIM-Driven Coordination
Our Revit-based workflows and clash detection modeling improve constructability, reduce RFIs, and align MEP systems with architectural and structural elements.
Code-Compliant, Future-Ready Systems
We design every system to meet ASHRAE, NEC, NFPA, IPC, and IECC standards—supporting inspection approval, operational safety, and energy performance goals.
Cost-Effective MEP Design Services
We optimize systems not just for performance but also for budget, lifecycle efficiency, and maintenance simplicity.
Client-First Process
From concept through commissioning, our team communicates transparently, resolves technical risks early, and tailors every solution to your facility’s unique needs.
Let's Discuss How to Optimize Your Next Project
Submit
We will get back to you as soon as possible.
Please try again later.
Integrated MEP Engineering Services for Complex Facility Projects
Keentel Engineering offers full-scope MEP engineering services for industrial, warehouse, and commercial facilities across the United States. Our multidisciplinary team delivers integrated mechanical, electrical, and plumbing system design tailored for energy efficiency, regulatory compliance, and long-term reliability. Whether you’re planning a new facility or upgrading aging infrastructure, our solutions are designed to reduce operating costs, meet ASHRAE, NEC, and IPC codes, and support sustainable operations.
We specialize in cost-effective MEP design services backed by intelligent modeling, BIM coordination, and real-time collaboration with architects and contractors. From HVAC optimization and electrical system design to storm drainage, gas piping, and fire protection engineering, Keentel ensures each system performs efficiently and functions cohesively within your overall project goals.
Our MEP services integrate seamlessly with broader engineering scopes such as Substation Design, Power System Studies, Owner’s Engineer Support, and grid-tied energy projects including Utility-Scale Solar Farm Engineering. We also provide guidance aligned with NERC Compliance where applicable.
POI Interconnection Engineering Support

Our skilled and knowledgeable engineering team has a rich history in designing, developing and commissioning various substation and interconnection engineering support projects.
MEP BIM Modeling
- 3D modeling of mechanical, electrical, and plumbing (MEP) systems using Revit
- Coordinated MEP layouts integrated with architectural and structural models
- Clash detection and resolution using Navisworks to prevent field conflicts
- Supports modular construction, prefabrication, and faster design validation
- Enables delivery of cost-effective MEP design services for warehouse and industrial facilities
Mechanical Design Services
- HVAC system modeling including ductwork, air terminals, and equipment
- Load calculations and equipment sizing integrated with simulation tools
- Hydronic piping and VRF system layout coordinated with BIM elements
- Optimized for energy-efficient mechanical design and ASHRAE compliance
Electrical Design Services
- Power distribution layouts: panels, feeders, receptacles, grounding
- Lighting system design with photometric analysis for code-compliant illumination
- Fire alarm, low voltage, and emergency power system layouts
- Conduit and cable tray routing modeled to avoid architectural conflicts
- Enhances coordination with substation or power system studies where needed
POI Interconnection Engineering Support

Our skilled and knowledgeable engineering team has a rich history in designing, developing and commissioning various substation and interconnection engineering support projects.
Plumbing and Fire Protection Design
- Domestic water, sanitary, and vent piping modeled for efficiency and maintainability
- Storm drainage and natural gas piping systems integrated into overall MEP layout
- Fire sprinkler systems modeled per NFPA standards (wet, dry, standpipe)
- Designed to meet plumbing code compliance across jurisdictions
Construction Documentation
- Generation of fully detailed construction documents from Revit models
- Floor plans, sections, elevations, and 2D/3D detail drawings
- Sheet set management, legend standardization, and annotation compliance
- Improves construction coordination and inspection readiness
Quantity Takeoffs and Cost Estimation
- Automated takeoffs for ducts, pipes, fixtures, and equipment from live models
- Schedule extraction linked to estimation software for budgeting accuracy
- Helps owners evaluate cost-effective MEP design decisions early
- Useful in both warehouse retrofits and new industrial builds
MEP Coordination Services
- Clash detection, interference checks, and constructability reviews across trades
- Coordination with architectural, structural, and civil disciplines
- Supports mep engineering services for industrial and prefabricated construction
- Reduces RFIs, design conflicts, and rework during installation
POI Interconnection Engineering Support

Our skilled and knowledgeable engineering team has a rich history in designing, developing and commissioning various substation and interconnection engineering support projects.
As-Built and Record Drawings
- Incorporation of redlines and field revisions into as-built Revit models
- Turnover-ready packages delivered in digital format with accurate data
- Facilitates digital twin setup for long-term facility management and automation
Revit Family Creation
- Custom MEP Revit families developed for equipment, fixtures, and specialty devices
- Parametric content creation tailored to manufacturer specifications
- Enables smart scheduling, sizing, and coordination across disciplines
Energy Modeling and Sustainability Analysis
- Integration with Autodesk Insight for energy simulation and HVAC efficiency
- LEED documentation support including baseline modeling and credits
- Energy-efficient mechanical design for green building compliance
- Reduces long-term energy usage and improves project sustainability profile

MEP Engineering Services for Industrial, Warehouse, Commercial & Residential Facilities
At Keentel Engineering, we provide full-scope MEP engineering services to the unique demands of industrial, warehouse, commercial, and residential projects across the United States. Whether you're
building a new facility,
expanding operations, or upgrading aging infrastructure, our mechanical, electrical, and plumbing teams deliver fully integrated designs that balance performance, safety, and sustainability.
We specialize in mep engineering services for industrial environments with high-load electrical needs, warehouse systems that require climate control and cost-efficiency, and commercial buildings where smart lighting, fire protection, and code compliance are critical. Every solution is engineered for long-term value, smooth inspections, and regulatory alignment with NEC, ASHRAE, IPC, and NFPA standards.
Mechanical Engineering Services
For Industrial, Warehouse & Commercial Facilities
At Keentel Engineering, we deliver high-performance mechanical engineering services for industrial, warehouse, and commercial clients across the United States. Our engineers design and optimize mechanical systems that support energy efficiency, code compliance, and long-term operational resilience—making us a reliable partner for new builds, retrofits, or major infrastructure upgrades.
We align every system with cost-effective MEP design principles, reducing energy consumption, maintenance needs, and project delays. Whether you're developing a clean manufacturing facility, retrofitting warehouse HVAC systems, or scaling commercial energy operations, Keentel delivers tailored mechanical engineering solutions designed to exceed ASHRAE and IECC standards.
Also explore our Power System Studies to support integrated energy modeling and system analysis.
Our Mechanical Engineering Capabilities Include
POI Interconnection Engineering Support

Our skilled and knowledgeable engineering team has a rich history in designing, developing and commissioning various substation and interconnection engineering support projects.

HVAC System Design
We specialize in HVAC system design for temperature control, air quality, and long-term energy savings. From ductwork layout to system sizing and VRF integration, we engineer HVAC solutions that reduce operating costs and improve environmental conditions.

Plumbing Systems Engineering
Our mechanical team provides full-scope plumbing design—from sanitary drainage to stormwater and natural gas systems. Designs prioritize low-maintenance plumbing, conservation, and compliance with IPC codes.

Mechanical Systems Analysis & Optimization
We use advanced software tools to simulate and assess mechanical performance. These insights allow us to recommend data-driven system improvements that boost efficiency, reduce energy loss, and extend asset life.
POI Interconnection Engineering Support

Our skilled and knowledgeable engineering team has a rich history in designing, developing and commissioning various substation and interconnection engineering support projects.

Energy-Efficient Mechanical Design
Our systems incorporate renewable energy, green building practices, and energy modeling tools to meet LEED and sustainability goals.

Regulatory Code Compliance
Every mechanical design follows the latest ASHRAE, IECC, and local mechanical codes. We proactively ensure approval readiness for inspections and permitting.

Quality Assurance & Safety
From design review to commissioning, Keentel applies rigorous QA/QC protocols across each project phase. Our designs aren’t just efficient—they’re engineered to last.
Electrical Engineering Services
Power-Focused, Future-Ready Solutions
At Keentel Engineering, our electrical engineering team delivers scalable, code-compliant electrical systems for industrial, commercial, and warehouse facilities across the U.S. Whether it’s a new construction project, a facility upgrade, or system expansion, our engineers help future-proof your infrastructure with designs that emphasize safety, resilience, and energy efficiency.
We specialize in full-lifecycle power systems engineering services—from low-voltage design and lighting to mission-critical backup power and load management. Our experts align every solution with NEC and NFPA codes, ensuring reliable operations and minimal downtime.
Explore our Substation Design Services for medium- and high-voltage interconnection solutions. Need integrated energy performance? Check out Power System Studies to assess and optimize your entire electrical infrastructure.
Our Electrical Engineering Expertise Includes
POI Interconnection Engineering Support

Our skilled and knowledgeable engineering team has a rich history in designing, developing and commissioning various substation and interconnection engineering support projects.

Electrical System Design
We provide comprehensive electrical system design for new facilities, retrofits, and automation projects. Our engineers develop smart-ready, load-optimized systems engineered to meet today’s and tomorrow’s electrical demands—whether for data centers, warehouses, or manufacturing.

Power Distribution Solutions
From main switchgear to branch circuit panels, our power distribution systems ensure safe and reliable energy delivery. We design with flexibility in mind—supporting future scalability and redundancy where needed.

Lighting Systems & Smart Controls
We integrate high-efficiency LED lighting, motion sensors, and smart controls to reduce consumption and improve visual comfort. Our designs account for photometric analysis and space usage, ensuring lighting systems are both code-compliant and energy-efficient.

Electrical Code Compliance
Keentel’s electrical designs follow all relevant national and local codes—including NEC, NFPA, and state-specific energy regulations. We assist clients in passing inspections smoothly while minimizing rework.
POI Interconnection Engineering Support

Our skilled and knowledgeable engineering team has a rich history in designing, developing and commissioning various substation and interconnection engineering support projects.

Emergency Power & Backup Systems
Our team designs robust backup solutions featuring generators, UPS systems, and ATS panels to ensure operational continuity during grid failures or storm events.

Energy Efficiency Engineering
We embed load management, smart metering, and energy usage tracking into every design, helping clients reduce operational costs and qualify for rebates or LEED credits.

Electrical System Analysis & Optimization
Through detailed audits, we identify issues like voltage drops, overloaded circuits, or harmonic distortion. Based on the findings, we provide targeted recommendations for enhanced reliability and system longevity.

Security Systems Integration
Keentel also engineers integrated security systems, including CCTV, access control, and fire alarm systems—all seamlessly embedded into your electrical infrastructure for centralized control and monitoring.
Plumbing Engineering Services
Sustainable, Code-Compliant Solutions
At Keentel Engineering, we deliver comprehensive plumbing engineering services for industrial, commercial, and specialized facilities across the U.S. Our plumbing engineers design efficient, scalable, and code-compliant systems that promote water conservation, fire safety, and long-term infrastructure resilience.
Whether you're launching a new development or modernizing aging plumbing infrastructure, our expertise ensures your systems meet all national plumbing codes, function reliably under load, and integrate seamlessly with broader MEP engineering and energy systems.
Our Plumbing Engineering Expertise Includes
POI Interconnection Engineering Support

Our skilled and knowledgeable engineering team has a rich history in designing, developing and commissioning various substation and interconnection engineering support projects.

Plumbing System Design
We provide complete plumbing system designs that ensure balanced water pressure, optimal flow rates, and effective drainage—tailored to the size, function, and occupancy of each facility.

Water Conservation & Sustainable Design
Our designs emphasize low-impact development with low-flow fixtures, greywater reuse systems, and water-efficient layouts. These strategies help clients lower utility costs and contribute to green building certifications like LEED.

Sanitary & Drainage Systems
We engineer sanitary, stormwater, and vent systems that are code-compliant, hydraulically balanced, and durable. Our goal: eliminate backups, minimize maintenance, and support public health.

Fire Protection Systems
From wet and dry sprinkler systems to standpipes and fire pumps, our plumbing engineers design and coordinate NFPA-compliant fire protection systems to meet insurance, life safety, and jurisdictional requirements.
POI Interconnection Engineering Support

Our skilled and knowledgeable engineering team has a rich history in designing, developing and commissioning various substation and interconnection engineering support projects.

Gas Piping Systems
We provide robust gas piping design for labs, kitchens, and industrial use cases—ensuring pressure control, code compliance, and long-term performance with leak prevention at the forefront.

Plumbing System Analysis & Upgrades
Our team conducts diagnostics on existing plumbing infrastructure to identify leaks, inefficiencies, or aging materials. We offer cost-effective upgrades designed to extend system life and reduce future maintenance.

Plumbing Code Compliance
We maintain expertise in IPC, UPC, and local plumbing codes, making sure every project passes inspection without delays. Keentel ensures builders and owners meet water safety, pressure, and sanitary regulations from the start.

Quality Assurance & Safety Standards
Every Keentel plumbing project is guided by detailed QA/QC checklists—covering materials, layout accuracy, pressure testing, and documentation—to deliver lasting performance and peace of mind.
Seamless MEPF System Integration for Complex Projects
Our MEP engineering approach extends beyond standard systems—offering fire protection system design, smart building automation, and ongoing system consulting. We ensure that every aspect of your mechanical, electrical, plumbing, and fire (MEPF) infrastructure works in harmony, reducing risk, improving efficiency, and supporting long-term asset performance.
At Keentel Engineering, we provide fully integrated MEP engineering services across the United States. Whether you're upgrading an industrial warehouse or developing a commercial facility from the ground up, our team designs every component—from HVAC systems and emergency electrical power to storm drainage and gas piping—to meet evolving codes, reduce energy costs, and future-proof your infrastructure.
We also specialize in MEP engineering services for warehouse and industrial environments, with expertise in regulatory compliance, energy modeling, and digital twin documentation. Learn more about our multidisciplinary capabilities at
KeentelEngineering.com
Ready to start planning?
Schedule a Consultation with our engineers today.
FAQ for MEP (Mechanical, Electrical, and Plumbing) Engineering Services
1. What is MEP engineering?
MEP engineering refers to the integrated design and management of the Mechanical, Electrical, and Plumbing systems within a building or infrastructure project. MEP engineers ensure that all mechanical, electrical, and plumbing systems are efficiently and safely designed, installed, and maintained. These systems are crucial for the comfort, safety, and functionality of buildings and facilities.
- Mechanical Systems: Include heating, ventilation, and air conditioning (HVAC), fire protection, and other climate control systems.
- Electrical Systems: Encompass power distribution, lighting, communication systems, and energy management.
- Plumbing Systems: Cover water supply, drainage, waste management, and stormwater systems.
2. What MEP engineering services do you offer?
We offer a wide range of MEP engineering services, including:
- System Design & Engineering: Comprehensive design of mechanical, electrical, and plumbing systems tailored to project specifications and local regulations.
- Energy Modeling & Efficiency Analysis: Ensuring energy-efficient systems that reduce operational costs and environmental impact.
- HVAC Design & Optimization: Designing and optimizing heating, ventilation, and air conditioning systems for comfort and energy efficiency.
- Electrical Distribution & Lighting Design: Designing power distribution networks, lighting systems, and backup power solutions.
- Plumbing & Drainage Systems: Designing water supply, drainage, and waste management systems to ensure proper function and compliance with local codes.
- Fire Protection & Life Safety Systems: Designing systems for fire detection, alarms, suppression, and emergency lighting to ensure safety.
- Sustainability Consulting: Implementing sustainable practices in system design, such as energy-efficient HVAC, water-saving plumbing, and renewable energy solutions.
- Construction Administration & Support: Providing oversight during construction to ensure systems are installed according to design specifications and local codes.
- Maintenance & Post-Construction Services: Offering ongoing maintenance support to ensure MEP systems operate efficiently and effectively throughout their lifecycle.
3. Why is MEP engineering important for construction projects?
MEP engineering is critical for ensuring that a building or facility operates efficiently, safely, and comfortably. Proper MEP design helps:
- Ensure Comfort: HVAC and plumbing systems are essential for maintaining a comfortable indoor environment.
- Optimize Energy Use: Energy-efficient designs minimize operational costs, reduce environmental impact, and ensure compliance with energy regulations.
- Enhance Safety: Fire protection, life safety, and electrical systems safeguard the building and its occupants.
- Compliance: MEP engineers ensure that systems comply with local building codes, standards, and regulations, avoiding costly penalties and delays.
- Sustainability: MEP systems are key to incorporating sustainable building practices, such as energy-efficient lighting and low-flow water systems.
4. What types of projects require MEP engineering services?
MEP engineering services are needed for a wide range of projects, including:
- Commercial Buildings: Offices, retail spaces, hotels, and shopping malls.
- Residential Buildings: Apartments, condominiums, and single-family homes.
- Industrial Facilities: Manufacturing plants, warehouses, and processing facilities.
- Healthcare Facilities: Hospitals, clinics, and medical centers.
- Educational Institutions: Schools, universities, and research labs.
- Public Infrastructure Projects: Airports, government buildings, and transportation hubs.
- Data Centers: Design and installation of specialized MEP systems to support computing and communication infrastructure.
5. How do you approach the design of MEP systems for a project?
Our approach to MEP system design includes several key steps:
- Initial Assessment & Planning: We begin by understanding the project’s requirements, including the building’s size, purpose, and specific needs for each MEP system.
- Conceptual Design: Developing an initial design concept for mechanical, electrical, and plumbing systems that meets the project’s functional, budgetary, and regulatory requirements.
- Detailed Design & Analysis: After approval of the concept, we perform detailed engineering calculations and analysis for each system. This includes HVAC load calculations, electrical load analysis, plumbing fixture counts, and energy efficiency evaluations.
- Coordination with Other Disciplines: MEP systems are coordinated with architectural and structural designs to ensure seamless integration within the building’s overall layout.
- Sustainability Focus: We implement energy-efficient technologies, sustainable materials, and renewable energy solutions whenever possible.
- Code Compliance: Ensuring all designs comply with local building codes, industry standards, and regulations, including safety and environmental requirements.
- Construction Administration: We provide oversight during construction, ensuring the systems are installed according to plan, conduct inspections, and address any issues that arise.
6. What is the role of HVAC in MEP systems?
The HVAC system (Heating, Ventilation, and Air Conditioning) is a vital component of MEP systems. Its role includes:
- Heating & Cooling: Providing heating and cooling solutions to maintain comfortable indoor temperatures in all seasons.
- Ventilation: Ensuring proper air circulation and fresh air intake to maintain indoor air quality and reduce the risk of airborne diseases.
- Humidity Control: Maintaining optimal humidity levels for comfort, health, and protection of building materials.
- Energy Efficiency: HVAC systems can account for a significant portion of a building’s energy consumption. Efficient design and technology choices help reduce energy use and operational costs.
7. How do you ensure energy efficiency in MEP designs?
We integrate energy-efficient solutions into MEP designs by:
- Optimizing HVAC Systems: Using energy-efficient heating, cooling, and ventilation systems, such as variable air volume (VAV) systems and energy recovery ventilators (ERVs).
- Energy-Efficient Lighting: Designing lighting systems that utilize LEDs, daylight harvesting, and occupancy sensors to minimize energy consumption.
- Building Energy Modeling: Conducting simulations and modeling to predict energy use and optimize system performance before installation.
- Water Efficiency: Implementing low-flow plumbing fixtures, water-saving appliances, and rainwater harvesting systems to reduce water consumption.
- Renewable Energy Integration: Incorporating renewable energy systems, such as solar panels or geothermal heating, to supplement the building’s energy needs.
8. How do you ensure compliance with building codes and regulations?
We ensure compliance with building codes and regulations by:
- Staying Updated: Continuously monitoring changes to local, state, and national building codes, energy standards, and industry best practices.
- Code Review: Conducting thorough reviews of the relevant codes for mechanical, electrical, and plumbing systems to ensure that designs meet all safety, environmental, and performance standards.
- Collaboration: Coordinating with architects, structural engineers, and other project stakeholders to ensure that the overall design complies with all regulations.
- Documentation & Permitting: Preparing the necessary documentation for permits, inspections, and approvals, ensuring the project is legally compliant.
9. How do you approach sustainability in MEP designs?
We incorporate sustainability into our MEP designs by focusing on:
- Energy Efficiency: Designing systems that reduce energy consumption, such as high-efficiency HVAC systems, LED lighting, and energy-efficient electrical distribution systems.
- Water Conservation: Implementing low-flow fixtures, efficient plumbing layouts, and water-saving appliances to reduce water consumption and improve sustainability.
- Renewable Energy Solutions: Integrating solar, wind, or geothermal systems to reduce the building’s dependence on non-renewable energy sources.
- Green Building Certifications: Ensuring that designs meet the requirements for green building certifications such as LEED, WELL, or BREEAM.
10. Do you provide ongoing support after MEP systems are installed?
Yes, we provide ongoing support for MEP systems, including:
- System Monitoring: Offering remote monitoring and maintenance services to ensure systems operate efficiently and address any issues proactively.
- Maintenance Plans: Developing and implementing preventive maintenance programs to extend the life of MEP systems and avoid costly repairs.
- Troubleshooting & Upgrades: Providing troubleshooting support, as well as recommendations for upgrades or system optimizations to improve performance or meet evolving needs.
11. How much do MEP engineering services cost?
The cost of MEP engineering services varies depending on the size and complexity of the project. Factors that influence cost include the scope of design, the systems involved (HVAC, electrical, plumbing), sustainability goals, and regulatory requirements. We provide customized solutions based on your needs and budget, and we work with you to achieve the most cost-effective approach without compromising quality.
12. What are the benefits of MEP engineering services in commercial buildings?
MEP engineering helps improve energy efficiency, safety, and comfort in commercial buildings by designing integrated mechanical, electrical, and plumbing systems that meet modern building codes and reduce long-term operating costs.
13. How much do MEP design services cost for a warehouse or industrial facility?
MEP design service costs vary based on project size, complexity, and system requirements. For warehouses and industrial buildings, pricing typically ranges from $1.50 to $3.00 per square foot. Contact us for a detailed quote.
14. What is included in a full-scope MEP engineering service?
A full-scope MEP service includes HVAC design, electrical power and lighting systems, plumbing and drainage plans, fire protection, BIM modeling, code compliance checks, quantity takeoffs, and construction documentation.
15. Do I need MEP engineering for renovations or just new construction?
Yes, MEP engineering is essential for both new construction and renovations. Upgrading or retrofitting MEP systems ensures energy code compliance, safety, and optimal performance in modernized facilities.
16.What software is used for MEP design and modeling?
Commonly used software includes Autodesk Revit for BIM modeling, Navisworks for clash detection, AutoCAD MEP, and energy simulation tools like Autodesk Insight for sustainability analysis.
17.How long does it take to complete MEP engineering plans?
Typical MEP engineering designs can take 2–6 weeks depending on project size, coordination needs, and permitting timelines. Fast-track delivery is available for urgent commercial and industrial projects.