Keentel’s Grid IQ

Stay updated with the latest industry news and developments through our blog.

A person in a white lab coat using a pipette to transfer liquid into a clear glass vial in a laboratory setting.
A black and white close-up shows a human eye, focusing intensely on the iris with distinct, radial patterns.
An aerial view of a white, heart-shaped island surrounded by a calm, turquoise ocean.
A golden-brown, crispy fried chicken breast fillet sandwich on a toasted bun with pickles and sauce.

Keentel Engineering Newsletters

Keentel Engineering – Newsletters | Smart Carousel (Clean Scroll)

Keentel Engineering Newsletter Carousel

Blog and Updates

NERC large load registration guide showing data center grid reliability and computational load compl
By SANDIP R PATEL September 9, 2026
Learn how NERC computational load registration impacts data centers, CLO standards, ride-through requirements, modeling, and grid reliability compliance.
NEC 2026 load calculation guide showing Article 120 rules, 2 VA changes, EV charging and service siz
By SANDIP R PATEL September 7, 2026
Learn NEC 2026 load calculations, Article 120 changes, the 2 VA rule, EV charging requirements, service sizing, and dwelling calculation methods.
NEC calculations guide showing conduit fill, voltage drop, ampacity, motor circuits and transformer
By SANDIP R PATEL September 7, 2026
Learn five essential NEC calculations covering conduit fill, voltage drop, ampacity, motor circuits, and transformer protection with engineering examples.
CAISO IBR model review showing inverter-based resource validation and PRC-029-1 ride-through complia
By SANDIP R PATEL September 7, 2026
Learn how CAISO reviews IBR models using PSLF validation, PRC-029-1 ride-through requirements, WECC models, and inverter resource compliance testing.
Protective earthing and system grounding during earth faults
By SANDIP R PATEL September 7, 2026
Understand system earthing and protective earthing, neutral grounding methods, effective grounding, ground grids, and insulation coordination for power systems
NERC MOD-032-1 CAISO generator data modeling and WECC compliance requirements
By SANDIP R PATEL September 6, 2026
Learn how NERC MOD-032-1 applies across CAISO, SCE, PG&E, VEA and SDG&E, including generator data, PSLF models, EMT requirements and WECC submissions.
PJM PSCAD model submission requirements for EMT model development
By SANDIP R PATEL September 6, 2026
Learn PJM PSCAD model requirements for inverter-based resources, EMT testing, PSS/E benchmarking, ride-through studies, and compliance submissions
Data center power plant turbine sizing and unit configuration comparison.
By SANDIP R PATEL September 6, 2026
Learn why data center power plants use multiple smaller gas turbines, covering 624 MW capacity, redundancy, grid connection, system strength, and engineering.
Station battery sizing design for substation DC auxiliary power system
By SANDIP R PATEL September 5, 2026
Understand ERCOT BESS interconnection requirements, including model packages, EMT studies, ride-through compliance, telemetry, and real-time co-optimization.
Transmission line sag formula comparison showing conductor sag calculations.
By SANDIP R PATEL September 5, 2026
Explore AI data center cooling design, liquid cooling, thermal storage, electrical loads, power quality, and grid reliability for 100 MW campuses.
Transmission line sag calculation showing conductor curve, tension, and catenary engineering analysi
By SANDIP R PATEL September 5, 2026
Understand transmission line sag calculation, sag-tension analysis, conductor tension, catenary modelling, software design, and clearance engineering.
NERC registered entity requirements for inverter-based resource projects.
By SANDIP R PATEL September 5, 2026
Understand NERC IBR registration requirements, Category 2 obligations, compliance programmes, modelling, verification, ride-through, and owner responsibilities.
Show More