Category: NERC Standards Archive

Recognized by

Protect Your Transformers from GIC Damage — Partner with Keentel Today

GIC Mitigation and Transformer Thermal Assessment Services by Keentel Engineering

Introduction: Understanding GIC Risk in Modern Power Systems Geomagnetic disturbances (GMDs) caused by solar activity can induce quasi-dc currents in…
Read More
GIC mitigation transformer thermal assessment geomagnetically-induced currents NERC TPL-007-1 compliance transformer GIC analysis thermal hotspot in transformers GIC modeling services power grid geomagnetic disturbance

PJM Manual 14G and Generation Interconnection Services by Keentel Engineering

Empowering the Grid with Expert Interconnection Solutions As PJM continues to lead grid reliability and market efficiency in the Eastern…
Read More
NERC Compliance Service – Empowering Grid Reliability with FERC Order 901 & Latest NERC Standards

Navigating TPL-008-1: A Strategic Transmission Planning Guide for Extreme Temperatures

Introduction: Why TPL-008-1 Matters As extreme weather events become more frequent and intense, the need for robust transmission planning grows.…
Read More
NERC Alert: Ensuring Reliability in Inverter-Based Resource (IBR) Model Quality
NERC Alert: Ensuring Reliability in Inverter-Based Resource (IBR) Model Quality

NERC Alert: Ensuring Reliability in Inverter-Based Resource (IBR) Model Quality

Learn how to respond to NERC’s IBR model alert. Discover key steps for PSPD, EMT validation, deadlines, and Keentel’s role…
Read More
Advanced Power System Protection: Relay Modeling, Simulation, and Integration for Modern Grid Reliability
Advanced Power System Protection: Relay Modeling, Simulation, and Integration for Modern Grid Reliability

Advanced Power System Protection: Relay Modeling, Simulation, and Integration for Modern Grid Reliability

Discover how Keentel Engineering uses advanced PSCAD relay modeling and simulations to ensure modern power system protection, fault handling, and…
Read More
Navigating the IBR Transformation: Our Perspective on NERC's IBR Activities
Navigating the IBR Transformation: Our Perspective on NERC's IBR Activities

Navigating the IBR Transformation: Our Perspective on NERC’s IBR Activities

Explore Keentel Engineering’s in-depth take on NERC’s IBR transformation guide, disturbance reports, compliance standards, and integration strategies to ensure bulk…
Read More
Generating Unit Winter Weather Readiness: Ensuring Resilience Through Cold Fronts
Generating Unit Winter Weather Readiness: Ensuring Resilience Through Cold Fronts

Generating Unit Winter Weather Readiness: Ensuring Resilience Through Cold Fronts

As extreme winter events become more frequent and severe, the reliability of generating units during cold weather is no longer…
Read More
Navigating OSHA 269 Transient Overvoltage (TOV) Requirements: Engineering Analysis and Mitigation Strategies
Navigating OSHA 269 Transient Overvoltage (TOV) Requirements: Engineering Analysis and Mitigation Strategies

Navigating OSHA 269 Transient Overvoltage (TOV) Requirements: Engineering Analysis and Mitigation Strategies

The Occupational Safety and Health Administration’s (OSHA) updated 29 CFR §1910.269 regulations on transient overvoltage (TOV) have brought significant changes…
Read More
NERC Compliance Service – Empowering Grid Reliability with FERC Order 901 & Latest NERC Standards
NERC Compliance Service – Empowering Grid Reliability with FERC Order 901 & Latest NERC Standards

NERC Compliance Service – Empowering Grid Reliability with FERC Order 901 & Latest NERC Standards

Overview: Why NERC Compliance Matters In the ever-evolving landscape of power system management, maintaining compliance with NERC (North American Electric…
Read More