Category: Uncategorized Archive
Catch up on assorted technical posts and updates from Keentel Engineering. Sorted into uncategorized content.
NYISO Transmission Expansion & Interconnection (TEI) Services
The NYISO Transmission Expansion & Interconnection (TEI) process is the mandatory gateway for connecting new generation resources, transmission lines, and…
Read MoreHow Many NERC Standards Are There?
In today's interconnected power grid, maintaining reliability is essential to prevent outages and ensure continuous service. The North American Electric…
Read MoreEnsuring Grid Reliability: How NERC O&P 693 Compliance Services Benefit the Energy Sector
Reliability is crucial in the constantly evolving energy sector. Power companies have a significant role to play in maintaining a…
Read MoreRevolutionizing the Grid Exploring Energy Storage System Technologies and their Utility-Scale Projects
The global energy landscape is rapidly evolving, with a growing emphasis on renewable energy sources such as solar and wind…
Read MoreSubstation Design in Electrical Power System
The design of a substation is a critical component of the power distribution in electrical system. The primary goal of…
Read MoreDesigning and Engineering a Large-Scale Power Plant Involves Several Steps
Designing and engineering a large-scale power plant involves several steps. Here is an overview of some of the main steps…
Read MoreHow Can Synchrophasor Technology Be Utilized for Monitoring and Controlling Power System Stability?
Synchrophasor technology is a powerful tool for monitoring and controlling power system stability.
Read MoreThe Protection and Control of Utility-Scale Generation and Transformers Are Critical
The protection and control of utility-scale generation and transformers are critical to ensure the safety and reliability of the power…
Read MoreEssential Steps for Commissioning Circuit Breakers
Commissioning tests play a crucial role in ensuring the proper functioning and reliability of circuit breakers.
Read More