Office Address

400 N Ashley Dr #2600, Tampa, FL 33602

Contact Number

813-389-7871

Email Address

contact@keentelengineering.com

Category: Uncategorized Archive

Recognized by

How Many NERC Standards Are There?

How Many NERC Standards Are There?

In today's interconnected power grid, maintaining reliability is essential to prevent outages and ensure continuous service. The North American Electric…
Read More
an electric grid

Ensuring Grid Reliability: How NERC O&P 693 Compliance Services Benefit the Energy Sector

Reliability is crucial in the constantly evolving energy sector. Power companies have a significant role to play in maintaining a…
Read More
Battery Storage Projects

Revolutionizing the Grid Exploring Energy Storage System Technologies and their Utility-Scale Projects

The global energy landscape is rapidly evolving, with a growing emphasis on renewable energy sources such as solar and wind…
Read More
Substation Design in Electrical Power System

Substation Design in Electrical Power System

The design of a substation is a critical component of the power distribution in electrical system. The primary goal of…
Read More
Designing and Engineering a Large-Scale Power Plant Involves Several Steps

Designing and Engineering a Large-Scale Power Plant Involves Several Steps

Designing and engineering a large-scale power plant involves several steps. Here is an overview of some of the main steps…
Read More
How Can Synchrophasor Technology Be Utilized for Monitoring and Controlling Power System Stability

How Can Synchrophasor Technology Be Utilized for Monitoring and Controlling Power System Stability?

Synchrophasor technology is a powerful tool for monitoring and controlling power system  stability.
Read More
Designing and Engineering a Large-Scale Power Plant Involves Several Steps

The Protection and Control of Utility-Scale Generation and Transformers Are Critical

The protection and control of utility-scale generation and transformers are critical to ensure the safety  and reliability of the power…
Read More
How Many NERC Standards Are There?

Essential Steps for Commissioning Circuit Breakers

Commissioning tests play a crucial role in ensuring the proper functioning and reliability of  circuit breakers.
Read More

Symmetrical Components Is a Powerful Technique Used in Electrical Engineering

Symmetrical components is a powerful technique used in electrical engineering to analyze and  understand unbalanced conditions in three-phase power systems.
Read More