At Keentel Engineering, we deliver precision-driven, high-fidelity power system modeling services using the industry’s leading software tools—PSCAD, PSSE v35, and ETAP. Our licensed engineers and NERC compliance specialists support utility-scale renewable energy projects, industrial facilities, substations, and grid interconnections across North America.

Whether you need advanced system design, regulatory compliance validation, or dynamic modeling support, Keentel Engineering ensures your models meet the highest technical and reliability standards.


PSCAD Modeling Services: Advanced EMT Simulations

PSCAD (Power Systems Computer Aided Design) is the gold standard for electromagnetic transient (EMT) studies, allowing precise analysis of fast-switching events, control system behaviors, and inverter-based resource (IBR) dynamics.

Our PSCAD Expertise Covers:

  • EMT modeling of inverter-based resources (IBRs) — wind, solar, BESS
  • Fault-Induced Delayed Voltage Recovery (FIDVR) studies
  • Sub-Synchronous Resonance (SSR) and Sub-Synchronous Control Interaction (SSCI) analysis
  • Lightning impulse and switching surge studies
  • GIC (Geomagnetically Induced Current) analysis
  • Harmonics, switching transients, and converter control system modeling
  • Protection coordination under transient fault conditions

Ideal for

Projects requiring IEEE 2800 compliance, CAISO and ERCOT dynamic performance validation, and complex transient simulations.


PSSE v35 Modeling Services: Steady-State and Dynamic Grid Studies

PSSE v35 (Power System Simulator for Engineering) by PTI/Siemens is the industry standard for large-scale power flow, dynamic simulation, and stability analysis required by ISOs and utilities.

Our PSSE Services Include

  • Load flow, contingency, and short-circuit analysis
  • Voltage and transient stability studies
  • Dynamic modeling of synchronous and inverter-based generation
  • PRC-024 and PRC-019 compliance studies
  • MOD-032 model submission and MOD-033 validation
  • Time Step Simulation (with TSAT integration) for complex IBR modeling

Ideal for

Utility interconnections, renewable integrations, and NERC-compliant dynamic studies.


ETAP Modeling Services: Industrial and Commercial System Analysis

ETAP (Electrical Transient Analyzer Program) is a highly intuitive, graphical-based platform for industrial and facility-level power system modeling.

Our ETAP Expertise Covers

  • Load flow, short-circuit, and arc flash analysis (IEEE 1584)
  • Motor starting and transient stability simulations
  • Protective device coordination and TCC curve plotting
  • Underground cable modeling and ground grid design
  • Harmonic analysis and filter design

Ideal for

Industrial facilities, hospitals, data centers, and commercial power systems.


PSCAD vs PSSE vs ETAP: Which Platform Is Right for Your Project?

Feature / Study TypePSCADPSSE v35ETAP
Electromagnetic Transients (EMT)Industry-leading❌ Not supported⚠️ Limited capability
Load Flow & Contingency Analysis⚠️ LimitedBest-in-classStandard feature
Dynamic & Transient StabilityEMT-basedRMS-basedRMS-based
IBR Modeling & Ride-Through (IEEE 2800)High-resolution controlRMS + TSAT optionSimplified control models
Short Circuit (IEC/ANSI)Not primary useBuilt-inAdvanced module
Protection Coordinationwith transientsPRC-related studiesGraphical & TCC plots
Arc Flash Analysis❌ Not supported❌ Not supportedFull support (IEEE 1584)
Cable & Ground Grid ModelingManual via scriptingExternal tools neededNative support
Utility Interconnection Studieswith detailISO-compliantMostly for industrial/commercial
User InterfaceTechnical scripting-basedModerateGraphical & intuitive

Why Choose Keentel Engineering for Modeling Services?

At Keentel Engineering, we combine software mastery with deep system-level understanding. Our engineers are licensed across multiple states, including Florida, California, and New York, and have over 30 years of combined experience in:

🔹Renewable energy project interconnections
🔹Utility-scale power system modeling
🔹NERC compliance studies
🔹Industrial power system design and safety


Ready to Model Your Power System with Confidence?

Whether it’s a utility-scale renewable plant, substation expansion, or industrial facility, Keentel Engineering delivers trusted, compliant, and high-performance models—built right the first time.

📧 Email: contact@keentelengineering.com
📞 Call: (813) 389-7871
🌐 Or Request a Free Quote Here

About the Author: Sonny Patel P.E. EC

IEEE Senior Member

In 1995, Sandip (Sonny) R. Patel earned his Electrical Engineering degree from the University of Illinois, specializing in Electrical Engineering . But degrees don’t build legacies—action does. For three decades, he’s been shaping the future of engineering, not just as a licensed Professional Engineer across multiple states (Florida, California, New York, West Virginia, and Minnesota), but as a doer. A builder. A leader. Not just an engineer. A Licensed Electrical Contractor in Florida with an Unlimited EC license. Not just an executive. The founder and CEO of KEENTEL LLC—where expertise meets execution. Three decades. Multiple states. Endless impact.