Contact Us — Keentel Engineering
Start a Conversation

Let's Discuss How to Optimize Your Next Project

Tell us what you are building and where it stands. We will tell you candidly what engineering it needs — and what it does not.

Tell Us About Your Project

1 business day reply

First name, email and what you're interested in are all we need to get moving — everything else, including drawings or an RFP, is optional.

Sending this doesn't create a contract or an engineer–client relationship — it just starts the conversation.
Rather not fill out a form? Email us directly Call (813) 389-7871

Contact Details

Locations

Head Office

400 N Ashley Dr, STE #2600
Tampa, FL 33602

(813) 389-7871

Austin Office

5900 Balcones Drive, STE 100
Austin, TX 78731

(512) 591-0752

Sacramento Office

1401 21st St, Ste R
Sacramento, CA 95811

(916) 913-4524

Baltimore Office

306 W Redwood St, STE 200
Baltimore, MD 21201

(410) 225-2181
Schedule a call ››

Fifteen minutes with an engineer, not a sales team. Free, and you leave it knowing what the scope should be.

What happens next

  • 1
    Within one business day

    We acknowledge it

    A reply from the engineer who will handle it, flagging anything we need before we can scope the work.

  • 2
    Usually the same week

    A short scoping call

    Thirty minutes, free — including if the answer is that you need less work than you asked for.

  • 3
    Typically two business days

    The proposal

    Named deliverables, stated assumptions, the schedule and the fee. No open-ended scope.

The Keentel Engineering team
Take it away with you

Download a Service Flyer

Every service line has a standalone document covering scope, standards, deliverables and the current regulatory landscape. No form, no email required — take what is useful.

Start here

Keentel Engineering Company Profile

Eleven service lines, three specialist engineering groups, project experience, delivery process and registrations — the whole firm in one document, updated for 2026.

Download the profile ›
Interconnection & Site Intelligence
01

Interconnection & Site Intelligence

Site and market screening, interconnection cost screening, large-load headroom analysis, and queue due diligence for generation and large-load projects.

EHV, HV & MV Power System Studies
02

EHV, HV & MV Power System Studies

Load flow, short circuit, arc flash, coordination, stability, EMT, harmonics, grounding and insulation coordination — 4 kV through 765 kV.

Substation Design Services
03

Substation Design Services

Complete physical and electrical packages from 4.16 kV collector stations to 500 kV switchyards, in air-insulated and gas-insulated configurations.

POI Interconnection Engineering Support
04

POI Interconnection Engineering Support

Every ISO and RTO process side by side, what triggers an EMT study in each, model quality gates, and where projects lose time in the queue.

Nuclear Power Plant Services
05

Nuclear Power Plant Services

Offsite power and switchyard interface, degraded voltage analysis, balance-of-plant electrical, and support for uprates, restarts and new build.

Transmission Line Design Services
06

Transmission Line Design Services

Route and corridor studies, conductor and ampacity, sag and tension, structures and foundations, NESC clearances, and reconductoring or uprating.

Owner's Engineer Services
07

Owner's Engineer Services

Independent technical representation — design review, procurement, EPC oversight, factory and field testing, commissioning and due diligence.

NERC O&P 693 Compliance Services
08

NERC O&P 693 Compliance Services

Applicability and gap analysis, PRC / FAC / MOD / VAR remediation engineering, RSAW evidence packages, mock audits and mitigation plans.

Utility-Scale Renewable Energy Engineering
09

Utility-Scale Renewable Energy Engineering

Solar, wind, BESS and hybrid plants — collector design, inverter and transformer sizing, plant controller and SCADA, and IEEE 2800 compliance.

Protection & Control Engineering
10

Protection & Control Engineering

Scheme design, relay settings and coordination, IEC 61850 and SCADA integration, remedial action schemes, and the PRC evidence behind them.

Data Center Power Engineering
11

Data Center Power Engineering

Large load interconnection, dynamic modeling and ride-through, campus substation and MV distribution, and the flexibility options that move your date.

Keentel Engineering team
12

Tailored Engineering Support

Not sure which service you need? Tell our engineering team about your project for guidance on scope, deliverables and the right next steps.