Category: Case Study Archive
Dive into Keentel Engineering’s Case Studies library to discover in-depth project overviews across a wide spectrum…
PJM Dynamic Modeling & Interconnection Case Studies
At Keentel Engineering, our proven dynamic modeling and interconnection expertise has supported utility-scale solar, battery energy storage systems (BESS), hybrid…
Read MorePSCAD Power System Studies: Four Real-World Case Studies
PSCAD (Power Systems Computer Aided Design) is the industry standard for high-fidelity electromagnetic transient (EMT) and dynamic studies. At Keentel…
Read MoreSubstation Engineering Case Studies: Design, Protection & System Studies
Below are four flagship projects where Keentel Engineering delivered end-to-end substation design (primary, secondary) and comprehensive power system studies to…
Read MorePoint-of-Interconnection (POI) Support Case Studies
Connecting large-scale generation and storage projects to regional transmission grids demands deep expertise, seamless ISO coordination, and bullet-proof engineering deliverables.…
Read More