Category: Utility Interconnection Archive
Read about interconnection studies, POI engineering, and compliance strategies for utility-scale power projects.
White Paper: Enhancing Power System Design & Analysis with PSCAD & Keentel Engineering
Executive Summary Power system design has evolved significantly with the advent of high-resolution PSCAD simulation tools like PSCAD™. As a…
Read MoreSPP 2025 ITP Assessment: Enhancing Transmission Planning for a Resilient Energy Future
Keentel Engineering continues its commitment to energy reliability and innovation by aligning with the latest industry developments. The 2025 Integrated…
Read MoreAccurate Load Forecasting for Behind-the-Meter DERs: The Future of Smart Energy Management
As the global energy landscape rapidly transforms, Behind-the-Meter (BTM) Distributed Energy Resources (DERs)—including rooftop solar PV, battery energy storage systems…
Read MorePoint-of-Interconnection (POI) Support Case Studies
Connecting large-scale generation and storage projects to regional transmission grids demands deep expertise, seamless ISO coordination, and bullet-proof engineering deliverables.…
Read MorePJM Manual 14G Interconnection Services By Keental Engineering
Power seamless PJM Manual 14G interconnections with Keentel Engineering PJM’s Eastern Interconnection sets the gold-standard for grid reliability and market…
Read MoreEngineering Responsibilities of IBR Generator Owners under IEEE Std 2800™-2022
As inverter-based resources (IBRs)—such as solar, wind, and battery energy storage systems (BESS)—play a pivotal role in the modern grid,…
Read MoreOptimizing Grid Interconnection Compliance with PJM Dynamic Modeling Standards
In today’s rapidly evolving energy landscape, achieving PJM dynamic modeling compliance is critical for the successful interconnection of renewable energy…
Read MoreThe Grid at a Crossroads: Understanding the Risks of Large Load Interconnections in the Western U.S.
As the Western U.S. experiences a rapid evolution in energy demand, a silent but significant transformation is taking shape—driven by…
Read MoreUnderstanding the PJM Regional Transmission Planning Process (RTEP): A Guide by Keentel Engineering
At Keentel Engineering, we stay ahead of evolving regulatory frameworks to deliver exceptional power system engineering services. One of the…
Read More