Explore the Blog Posts of Keentel Engineering.
At Keentel Engineering stay updated with the latest industry news and developments through our blog.
Schedule A CallWhy Choose Us
At Keentel Engineering, we take pride in being the go-to engineering firm for power and utility system planning, design, control, and analysis. Some of the many attributes of our company that set us apart are:
Client-Focused Work Approach
Our team works cohesively on every project and with every client. We first develop a solid understanding of your project goals, requirements, and needs. From concept to commissioning, we assist you in every step.
27 Years of Experience
Attention-to-Detail
We work on every project with laser focus and attention to detail. This enables our team to deliver desired results with complete satisfaction.
Quality with Innovation
At Keentel Engineering, we have established our stellar market reputation on quality, work ethics, and innovation.
Our Blog Articles
Stay updated with the latest industry news and developments through our blog.
Navigating OSHA 269 TOV Requirements: Engineering Analysis & Mitigation
NERC Alert: Ensuring Reliability in Inverter-Based Resource (IBR) Model Quality
White Paper: Gas Insulated Substations (GIS) – Enhancing Power Network Reliability and Efficiency
Digital Substation Design and Automation with IEC 61850
Guide to Substation Design and Engineering – Keentel Engineering
Advanced Power System Protection: Relay Modeling, Simulation, and Integration for Modern Grid Reliability
Navigating the IBR Transformation: Our Perspective on NERC’s IBR Activities
Optimized O&M for PV Power Plants in All Climates: Keentel Engineering Leads with Global Best Practices
Generating Unit Winter Weather Readiness: Ensuring Resilience Through Cold Fronts
Let’s Connect
Fill in the form below with the relevant information, and we’ll connect with you ASAP to discuss your project requirements.
Learn More