Explore the Blog Posts of Keentel Engineering.
At Keentel Engineering stay updated with the latest industry news and developments through our blog.
Schedule A CallWhy Choose Us
At Keentel Engineering, we take pride in being the go-to engineering firm for power and utility system planning, design, control, and analysis. Some of the many attributes of our company that set us apart are:
Client-Focused Work Approach
Our team works cohesively on every project and with every client. We first develop a solid understanding of your project goals, requirements, and needs. From concept to commissioning, we assist you in every step.
27 Years of Experience
Attention-to-Detail
We work on every project with laser focus and attention to detail. This enables our team to deliver desired results with complete satisfaction.
Quality with Innovation
At Keentel Engineering, we have established our stellar market reputation on quality, work ethics, and innovation.
Our Blog Articles
Stay updated with the latest industry news and developments through our blog.
What Do PRC-002-5 and PRC-028-1 Mean for Generator Owners & Transmission Owners?
Difference Between OSHA, NEC, NFPA, and NERC Compliance in Electrical Engineering
PJM Dynamic Modeling & Interconnection Case Studies
NERC PRC-029-1 Compliance for Inverter-Based Resources
ERCOT NERC Compliance Services: Ensuring Grid Reliability Through Expert Compliance Management
Accurate Load Forecasting for Behind-the-Meter DERs: The Future of Smart Energy Management
Optimizing MV Switchgear Design for Cost, Safety & Compliance
Substation Earthing Design – Protecting Infrastructure and Lives
Commissioning MV & LV Electrical Systems: Keentel Engineering’s Expert Approach
Let’s Connect
Fill in the form below with the relevant information, and we’ll connect with you ASAP to discuss your project requirements.
Learn More