Office Address

400 N Ashley Dr #2600, Tampa, FL 33602

Contact Number

813-389-7871

Email Address

contact@keentelengineering.com

Explore the Blog Posts of Keentel Engineering.

At Keentel Engineering stay updated with the latest industry news and developments through our blog.

Schedule A Call

Why Choose Us

At Keentel Engineering, we take pride in being the go-to engineering firm for power and utility system planning, design, control, and analysis. Some of the many attributes of our company that set us apart are:

Client-Focused Work Approach

Our team works cohesively on every project and with every client. We first develop a solid understanding of your project goals, requirements, and needs. From concept to commissioning, we assist you in every step.

27 Years of Experience

We have over two decades of experience in design and interconnection. Rest assured, we have the knowledge, understanding, and expertise to handle and execute all types of projects with sheer perfection and superior workmanship.

Attention-to-Detail

We work on every project with laser focus and attention to detail. This enables our team to deliver desired results with complete satisfaction.

Quality with Innovation

At Keentel Engineering, we have established our stellar market reputation on quality, work ethics, and innovation.

Our Blog Articles

Stay updated with the latest industry news and developments through our blog.

PSCAD Power System Studies: Four Real-World Case Studies

PSCAD Power System Studies: Four Real-World Case Studies

PSCAD (Power Systems Computer Aided Design) is the industry standard for high-fidelity electromagnetic transient (EMT) and dynamic studies. At Keentel…
Read More
Complete Substation Engineering Case Studies: Design, Protection & System Studies

Substation Engineering Case Studies: Design, Protection & System Studies

Below are four flagship projects where Keentel Engineering delivered end-to-end substation design (primary, secondary) and comprehensive power system studies to…
Read More
Case Studies — Point-of-Interconnection (POI) Support by Keentel Engineering

Point-of-Interconnection (POI) Support Case Studies

Connecting large-scale generation and storage projects to regional transmission grids demands deep expertise, seamless ISO coordination, and bullet-proof engineering deliverables.…
Read More
NERC PRC-029-1 & PRC-024-4 Compliance for Inverter-Based & Synchronous Resources

NERC PRC-029-1 & PRC-024-4 Compliance for Inverter-Based & Synchronous Resources

With over three decades of utility-scale engineering expertise, Keentel Engineering helps Generator Owners (GOs) and Transmission Owners (TOs) stay ahead…
Read More
Ensuring Reliable Interconnections — Hydro-Québec-Compliant Facility Connections

Ensuring Reliable Interconnections — Hydro-Québec-Compliant Facility Connections

Linking a customer facility to the Hydro-Québec Transmission System is a high-stakes exercise in precision engineering and regulatory compliance. Keentel…
Read More
Distribution vs Sub-Transmission vs Bulk Electric System: An Interconnection Guide

Distribution vs Sub-Transmission vs Bulk Electric System: An Interconnection Guide

At Keentel Engineering, we track every update to U.S. interconnection policy so clean-energy projects can connect quickly and safely—whether they…
Read More
Unlock Precision Grounding & EMI Solutions with CDEGS SW & Keentel Engineering

Unlock Precision Grounding & EMI Solutions with CDEGS SW & Keentel Engineering

At Keentel Engineering, we know every reliable power system starts at ground level—literally. That’s why our licensed engineers deliver advanced…
Read More
NYISO Transmission Expansion & Interconnection (TEI) Services

NYISO Transmission Expansion & Interconnection (TEI) Services

The NYISO Transmission Expansion & Interconnection (TEI) process is the mandatory gateway for connecting new generation resources, transmission lines, and…
Read More
Simplifying Energy-Storage Interconnection in New York

Simplifying Energy-Storage Interconnection in New York: SIR to NYISO Class-Year

How Keentel Engineering guides developers through utility, SIR and NYISO pathways The boom in clean-energy assets has pushed energy-storage systems…
Read More

Let’s Connect

Fill in the form below with the relevant information, and we’ll connect with you ASAP to discuss your project requirements.

Learn More
Engineering staff is taking notes - Image - Keentel Engineering