Office Address

400 N Ashley Dr #2600, Tampa, FL 33602

Contact Number

813-389-7871

Email Address

contact@keentelengineering.com

Explore the Blog Posts of Keentel Engineering.

At Keentel Engineering stay updated with the latest industry news and developments through our blog.

Schedule A Call

Why Choose Us

At Keentel Engineering, we take pride in being the go-to engineering firm for power and utility system planning, design, control, and analysis. Some of the many attributes of our company that set us apart are:

Client-Focused Work Approach

Our team works cohesively on every project and with every client. We first develop a solid understanding of your project goals, requirements, and needs. From concept to commissioning, we assist you in every step.

27 Years of Experience

We have over two decades of experience in design and interconnection. Rest assured, we have the knowledge, understanding, and expertise to handle and execute all types of projects with sheer perfection and superior workmanship.

Attention-to-Detail

We work on every project with laser focus and attention to detail. This enables our team to deliver desired results with complete satisfaction.

Quality with Innovation

At Keentel Engineering, we have established our stellar market reputation on quality, work ethics, and innovation.

Our Blog Articles

Stay updated with the latest industry news and developments through our blog.

Navigating OSHA 269 Transient Overvoltage (TOV) Requirements: Engineering Analysis and Mitigation Strategies

Navigating OSHA 269 Transient Overvoltage (TOV) Requirements: Engineering Analysis and Mitigation Strategies

The Occupational Safety and Health Administration’s (OSHA) updated 29 CFR §1910.269 regulations on transient overvoltage (TOV) have brought significant changes…
Read More
Comprehensive Power System Study Solutions by Keentel Engineering

Comprehensive Power System Study Solutions by Keentel Engineering

Overview Keentel Engineering offers a full suite of power system studies using advanced simulation tools like ETAP, serving utilities, renewable…
Read More
White Paper: Implementing 2023 NEC Part 2 Code Changes

White Paper: Implementing 2023 NEC Part 2 Code Changes

Executive Summary The 2023 NEC introduced transformative updates in Part 2, focusing primarily on wiring methods (Chapter 3) and equipment…
Read More
White Paper: Enhancing Power System Design & Analysis with PSCAD & Keentel Engineering

White Paper: Enhancing Power System Design & Analysis with PSCAD & Keentel Engineering

Executive Summary Power system design has evolved significantly with the advent of high-resolution PSCAD simulation tools like PSCAD™. As a…
Read More
SPP 2025 ITP Assessment: Enhancing Transmission Planning for a Resilient Energy Future

SPP 2025 ITP Assessment: Enhancing Transmission Planning for a Resilient Energy Future

Keentel Engineering continues its commitment to energy reliability and innovation by aligning with the latest industry developments. The 2025 Integrated…
Read More
Keentel Engineering Insights: NERC Identifies New Grid Vulnerabilities – May 2025 Newsletter

Keentel Engineering Insights: NERC Identifies New Grid Vulnerabilities – May 2025 Newsletter

By: Keentel Communications TeamNewsletter: May 2025 NERC Issues Critical Grid Vulnerability Alert in Latest Canadian Transmission Assessment Keentel Engineering is…
Read More
NERC Compliance Service – Empowering Grid Reliability with FERC Order 901 & Latest NERC Standards

NERC Compliance Service – Empowering Grid Reliability with FERC Order 901 & Latest NERC Standards

Overview: Why NERC Compliance Matters In the ever-evolving landscape of power system management, maintaining compliance with NERC (North American Electric…
Read More
Transmission Line Design Engineering: Precision, Reliability, and Innovation at Keentel Engineering

Transmission Line Design Engineering: Precision, Reliability, and Innovation at Keentel Engineering

At Keentel Engineering, we specialize in comprehensive transmission line design engineering solutions that ensure safe, cost-effective, and environmentally compliant high-voltage…
Read More
HV & MV Load Flow Studies FAQs

HV & MV Load Flow Studies FAQs

Welcome to Keentel Engineering. Here, we answer your most pressing questions about power flow analysis—what it is, why it matters,…
Read More

Let’s Connect

Fill in the form below with the relevant information, and we’ll connect with you ASAP to discuss your project requirements.

Learn More
Engineering staff is taking notes - Image - Keentel Engineering