Office Address

400 N Ashley Dr #2600, Tampa, FL 33602

Contact Number

813-389-7871

Email Address

contact@keentelengineering.com

Explore the Blog Posts of Keentel Engineering.

At Keentel Engineering stay updated with the latest industry news and developments through our blog.

Schedule A Call

Why Choose Us

At Keentel Engineering, we take pride in being the go-to engineering firm for power and utility system planning, design, control, and analysis. Some of the many attributes of our company that set us apart are:

Client-Focused Work Approach

Our team works cohesively on every project and with every client. We first develop a solid understanding of your project goals, requirements, and needs. From concept to commissioning, we assist you in every step.

27 Years of Experience

We have over two decades of experience in design and interconnection. Rest assured, we have the knowledge, understanding, and expertise to handle and execute all types of projects with sheer perfection and superior workmanship.

Attention-to-Detail

We work on every project with laser focus and attention to detail. This enables our team to deliver desired results with complete satisfaction.

Quality with Innovation

At Keentel Engineering, we have established our stellar market reputation on quality, work ethics, and innovation.

Our Blog Articles

Stay updated with the latest industry news and developments through our blog.

Power-System Modeling Services at Keentel Engineering

Power-System Modeling Services at Keentel Engineering

At Keentel Engineering, we deliver precision-driven, high-fidelity power system modeling services using the industry’s leading software tools—PSCAD, PSSE v35, and…
Read More
Empowering Electrical Safety and Performance with SES CDEGS Software

Empowering Electrical Safety and Performance with SES CDEGS Software

At Keentel Engineering, we specialize in advanced grounding system design, electromagnetic interference (EMI) mitigation, and transient response analysis powered by…
Read More
PJM Manual 14G Interconnection Services By Keental Engineering

PJM Manual 14G Interconnection Services By Keental Engineering

Power seamless PJM Manual 14G interconnections with Keentel Engineering PJM’s Eastern Interconnection sets the gold-standard for grid reliability and market…
Read More
Transmission Engineering Solutions in the ComEd and PJM Territories: Powering The Future

Transmission Engineering Solutions in the ComEd and PJM Territories: Powering The Future

As the Midwest's power grid evolves to meet growing demand, aging infrastructure, and renewable energy integration, ComEd’s Supplemental Projects provide…
Read More
GIC Mitigation and Transformer Thermal Assessment Expertise at Keentel Engineering

GIC Mitigation and Transformer Thermal Assessment Expertise at Keentel Engineering

As the energy landscape evolves, grid resilience against geomagnetic disturbances (GMDs) is more critical than ever. GMDs can induce geomagnetically-induced…
Read More
Grid Code Compliance for Wind Farms: A Technical Overview for Electrical Engineers

Grid Code Compliance for Wind Farms: A Technical Overview for Electrical Engineers

As renewable energy continues to reshape the global power landscape, grid code compliance for wind farms has become a cornerstone…
Read More
Revolutionizing Transformer Protection with SEL-487E: A Keentel Engineering Perspective

Revolutionizing Transformer Protection with SEL-487E: A Keentel Engineering Perspective

In today’s modern power systems, transformer protection is more than a safeguard—it's a cornerstone of grid resilience and operational continuity.…
Read More
How PSCAD™ Empowers Advanced Electrical System Modeling at Keentel Engineering

How PSCAD™ Empowers Advanced Electrical System Modeling at Keentel Engineering

Keentel Engineering leverages cutting-edge simulation tools to deliver innovative solutions in power system analysis, high-voltage (HV) substation design, and renewable…
Read More

IEEE Std 2800-2022 Compliance for Inverter-Based Resources: A Practical Guide for GOs

Transforming Grid Compliance with IBRs – A Keentel Engineering Perspective The rise of inverter-based resources (IBRs)—including solar, wind, and battery…
Read More

Let’s Connect

Fill in the form below with the relevant information, and we’ll connect with you ASAP to discuss your project requirements.

Learn More
Engineering staff is taking notes - Image - Keentel Engineering