Office Address

400 N Ashley Dr #2600, Tampa, FL 33602

Contact Number

813-389-7871

Email Address

contact@keentelengineering.com

Explore the Blog Posts of Keentel Engineering.

At Keentel Engineering stay updated with the latest industry news and developments through our blog.

Schedule A Call

Why Choose Us

At Keentel Engineering, we take pride in being the go-to engineering firm for power and utility system planning, design, control, and analysis. Some of the many attributes of our company that set us apart are:

Client-Focused Work Approach

Our team works cohesively on every project and with every client. We first develop a solid understanding of your project goals, requirements, and needs. From concept to commissioning, we assist you in every step.

27 Years of Experience

We have over two decades of experience in design and interconnection. Rest assured, we have the knowledge, understanding, and expertise to handle and execute all types of projects with sheer perfection and superior workmanship.

Attention-to-Detail

We work on every project with laser focus and attention to detail. This enables our team to deliver desired results with complete satisfaction.

Quality with Innovation

At Keentel Engineering, we have established our stellar market reputation on quality, work ethics, and innovation.

Our Blog Articles

Stay updated with the latest industry news and developments through our blog.

Revolutionizing Transformer Protection with SEL-487E: A Keentel Engineering Perspective

Revolutionizing Transformer Protection with SEL-487E: A Keentel Engineering Perspective

In today’s modern power systems, transformer protection is more than a safeguard—it's a cornerstone of grid resilience and operational continuity.…
Read More
How PSCAD™ Empowers Advanced Electrical System Modeling at Keentel Engineering

How PSCAD™ Empowers Advanced Electrical System Modeling at Keentel Engineering

Keentel Engineering leverages cutting-edge simulation tools to deliver innovative solutions in power system analysis, high-voltage (HV) substation design, and renewable…
Read More

IEEE Std 2800-2022 Compliance for Inverter-Based Resources: A Practical Guide for GOs

Transforming Grid Compliance with IBRs – A Keentel Engineering Perspective The rise of inverter-based resources (IBRs)—including solar, wind, and battery…
Read More

Keental Engineering Power Pulse Newsletter – April 2025 Edition

Insight, Innovation, and Impact in Electrical Power Systems IN THIS ISSUE Global Trends in Electrical Power Engineering Grid Resilience is…
Read More
Engineering Responsibilities of IBR Generator Owners under IEEE Std 2800™-2022

Engineering Responsibilities of IBR Generator Owners under IEEE Std 2800™-2022

As inverter-based resources (IBRs)—such as solar, wind, and battery energy storage systems (BESS)—play a pivotal role in the modern grid,…
Read More
Optimizing Grid Interconnection Compliance with PJM Dynamic Modeling Standards

Optimizing Grid Interconnection Compliance with PJM Dynamic Modeling Standards

In today’s rapidly evolving energy landscape, achieving PJM dynamic modeling compliance is critical for the successful interconnection of renewable energy…
Read More
Ensuring Grid Reliability with EMT Modeling Compliance – CAISO Requirements

Ensuring Grid Reliability with EMT Modeling Compliance – CAISO Requirements

As the energy landscape continues to evolve with increasing integration of inverter-based resources (IBRs), battery energy storage systems (BESS), and…
Read More
IEEE-Compliant EHV, HV & MV Substation Design Services by Keentel

IEEE-Compliant EHV, HV & MV Substation Design Services by Keentel

At Keentel Engineering, we deliver expert EHV, HV, and MV substation design services that form the foundation of today’s electrical…
Read More
How to Safely Overload Transformers Using IEEE C57.91-2011 Guidelines

How to Safely Overload Transformers Using IEEE C57.91-2011 Guidelines

At Keentel Engineering, our commitment to power system reliability and regulatory compliance is backed by decades of transformer analysis expertise.…
Read More

Let’s Connect

Fill in the form below with the relevant information, and we’ll connect with you ASAP to discuss your project requirements.

Learn More
Engineering staff is taking notes - Image - Keentel Engineering