• Home
  • About
  • Services
    • Power System Studies Services
    • Substation Design Services
    • POI Interconnection Engineering Support
    • Transmission Line Design Services
    • Utility Scale Renewable Energy
    • Owner’s Engineer Services
    • MEP Engineering Services
    • NERC O&P 693 Compliance Services
    • Nuclear Power Plant Services
  • Clients & Projects
  • Keentel’s Grid IQ
  • Contact
Request A Proposal
Schedule A Consultation
  • Home
  • About
  • Services
    • Power System Studies Services
    • Substation Design Services
    • POI Interconnection Engineering Support
    • Transmission Line Design Services
    • Utility Scale Renewable Energy
    • Owner’s Engineer Services
    • MEP Engineering Services
    • NERC O&P 693 Compliance Services
    • Nuclear Power Plant Services
  • Clients & Projects
  • Contact
  • Keentel’s Grid IQ
Request A Proposal
Schedule A Consultation
call icon Phone Icon

813-389-7871

Email icon

contact@keentelengineering.com

A person wearing protective goggles and an apron works with chemicals in a laboratory, holding a test tube with tongs.

Serving for more than two decades, we are a name you can trust and count on for your power system and engineering support needs. We can provide innovative solutions to take your business to greater heights.

Menu Links

  • Home
  • About
  • Services
  • Industries
  • Keentel’s Grid IQ
  • Contact

Connect with Us

call icon

813-389-7871

email icon

contact@keentelengineering.com

Schedule a Consultation
An aerial view of a white, heart-shaped island surrounded by a calm, turquoise ocean.
Logo for the Florida Engineering Society featuring blue text inside a yellow and blue swooping elliptical frame.

Head Office

400 N Ashley Dr STE #2600,
Tampa, FL 33602

(813) 389-7871

Austin Office

5900 Balcones Drive STE 100,
Austin, TX 78731 USA

(512) 591-0752

Sacramento Office

1401 21st St Ste R,
Sacramento, CA 95811 USA

(916) 913-4524

Baltimore Office

306 W Redwood St, STE 200,
Baltimore, MD 21201 USA

(410) 225-2181
A person in a white lab coat using a pipette to transfer liquid into a clear glass vial in a laboratory setting.
A person in a white lab coat using a pipette to transfer liquid into a clear glass vial in a laboratory setting.
A black and white close-up shows a human eye, focusing intensely on the iris with distinct, radial patterns.
An aerial view of a white, heart-shaped island surrounded by a calm, turquoise ocean.
A golden-brown, crispy fried chicken breast fillet sandwich on a toasted bun with pickles and sauce.

Privacy Policy

Terms & Conditions

Legal Disclaimer

State of Florida — Registry No. 36853, KEENTEL LLC, DBA: KEENTEL ENGINEERING

© 2026 

Copyright 1995-2026 Keentel Engineering All Rights Reserved

add a title

Add a link

Add a link

Add a link

add a title

Add a link

Add a link

Add a link

add a title

Place an image or any other element you want

Add a link