We’re Ready to Take Charge of Your EHV, HV & MV Electrical Power Engineering Needs

At Keentel Engineering and its Consultants, our mission is to deliver sustainable, innovative, and high-quality electrical power engineering solutions tailored to your unique project requirements.

From substation design and POI interconnection engineering support to utility-scale solar, wind, and BESS engineering, we’re your trusted partner in delivering NERC-compliant, future-ready infrastructure across the U.S.

As a leader in electrical power engineering, we help utilities, developers, and EPCs across the U.S. overcome modern grid challenges. Our expert electrical engineering team specializes in grid reliability, interconnection, and compliance.

A white background with a few lines on it

About Keentel Engineering
Your Reliable Electrical Engineering Support

At Keentel Engineering, we deliver electrical power engineering services built on 30 years of experience and a commitment to excellence. Our clients include utilities, developers, EPCs, and public agencies across the U.S.


Unlike firms that sacrifice technical depth to chase billable hours, we prioritize precision, compliance, and value engineering. From transmission services and relay modeling to winterization and SCADA planning, we never compromise on quality.

Let's Discuss How to Optimize Your Next Project

Submit

NERC Level 3 Alert Engineering Support

We specialize in NERC Level 3 Alert compliance services, helping U.S.-based generator owners meet evolving reliability standards. Our team stays ahead of regulatory developments, offering you peace of mind and technical accuracy in every submission.

Our Services

Our Electrical engineering team offers a wide range of services. We are an electrical power engineering company with a focus on engineering, procurement, construction and associated regulatory compliance. We provide full-spectrum electrical engineering services focused on grid modernization, power system reliability, and renewable energy integration. Our electrical power engineering team supports projects from design through commissioning, helping clients meet NERC, IEEE, and state-level standards efficiently.

POI Interconnection Engineering Support

A bunch of power lines are silhouetted against a sunset sky.

Our skilled and knowledgeable engineering team has a rich history in designing, developing and commissioning various substation and interconnection engineering support projects.

LEARN MORE
POI Interconnection Engineering Support

POI Interconnection Engineering Support

Our skilled and knowledgeable engineering team has a rich history in designing, developing and commissioning various substation and interconnection engineering support projects.

Electricla substation design

Substation Design
Services

At Keentel Engineering, we are experts in substation and interconnection engineering support services. Our experienced and knowledgeable team has a solid history in engineering, developing,…

Power System Studies

EHV, HV. MV Power System Studies

Ensure electrical safety, minimize downtime, and meet compliance standards with our expert power system studies across Extra High Voltage (EHV), High Voltage (HV), and Medium…

POI Interconnection Engineering Support

A bunch of power lines are silhouetted against a sunset sky.

Our skilled and knowledgeable engineering team has a rich history in designing, developing and commissioning various substation and interconnection engineering support projects.

LEARN MORE
Owner’s Engineer Services

Owner’s Engineer
Services

At Keentel Engineering, we specialize in providing comprehensive owner's engineer services tailored to meet your project's unique needs. With a commitment to
excellence and a…

NERC Compliance Services

NERC O&P 693 Compliance Services

At Keentel Engineering, our NERC compliance consultants specialize in helping power sector clients meet NERC 693 standards, including all aspects of O&P and RSAW
requirements.…

Utility-Scale Solar Farms

Utility Scale Solar Farm Engineering

Welcome to our comprehensive suite of electrical engineering services designed specifically for utility-scale solar farms. Our dedicated team of experienced professionals is committed to delivering…

Nationwide Electrical Engineering Solutions Built for Today’s Grid

At Keentel Engineering, we specialize in advanced electrical engineering and electrical power system services that support grid reliability, renewable energy, and system modernization across the United States. From HVDC and transmission engineering to PSCADD-based simulations and IEC 61850 automation, we help developers, utilities, and EPCs achieve full compliance, safe operations, and seamless project execution.

Whether you're searching for a reliable partner for relay coordination, winterization support, NERC Level 3 compliance services, or SCADA integration, our team delivers field-proven solutions tailored to your project's voltage level including EHV, HV, and MV systems.

Our core strength lies in blending electrical engineering fundamentals with cutting-edge simulation and regulatory compliance. From ETAP load flow to PSCAD modeling and IEC 61850 automation, we offer tailored electrical power engineering solutions that meet today’s evolving grid standards.

We offer end-to-end engineering for:

  • Substation interconnection and POI studies
  • Utility-scale solar, wind, and battery storage systems
  • Power system studies with modeling, fault analysis, and system impact reviews
  • GIS and generation engineering services
  • Relay protection, automation, and transmission line design

As a trusted electrical power engineering company, Keentel works nationwide with clients in regulated and deregulated markets. Our consultants support Keentel Engineering transmission services, wind engineering services, generation integration, and full engineering for compliance with NERC and IEEE standards.

Need a licensed team that understands the demands of large-scale infrastructure and mission-critical timelines? Keentel Engineering is your partner for precision, compliance, and results across every voltage class and generation source.

Why Choose Keentel Engineering?

At Keentel Engineering, we take pride in being the go-to engineering firm for power and utility system planning, design, control, and analysis. Some of the many attributes of our company that set us apart are:

Client-Focused Work Approach

Client-Focused Work Approach

We work collaboratively from design and modeling to commissioning, ensuring we understand your goals and deliver tailored power system engineering services.

Experience icon

30 Years of Experience

Our team brings decades of success in power system interconnection, transmission line design, and renewable energy engineering — including BESS, solar PV, and wind.

Attention-to-Detail

Attention-to-Detail

We approach each project with detailed modeling, relay coordination, and fault analysis, delivering results that meet or exceed regulatory and performance benchmarks.

Quality with Innovation

Quality with Innovation + Compliance

Whether you need ETAP, PSCAD, or SKM load studies, DIgSILENT simulations, or IEC 61850 automation solutions, we provide cutting-edge support with a compliance-first mindset.

Autocad Logo

AutoCAD

27+ Years

DigSilentInterna Logo

DIgSILENT

8+ Years

Etap Logo

Estap

6+ Years

PSSE Logo

Bentley

4+ Years

MicroStation Logo

Siemens

14+ Years

SEL Logo

Sel

27+ Years

EasyPower logo

EasyPower

10+ Years

PSCad Logo

PS Card

5+ Years

SKM Power Tools Logo

SKM PowerTools

15+ Years

Cyme Logo

Cyme

27+ Years

Blog and Updates

Explore essential NERC Alert 3 actions for IBRs. Learn how TOs, TPs, PCs & GOs must respond with upd
By SANDIP R PATEL July 4, 2025
Explore essential NERC Alert 3 actions for IBRs. Learn how TOs, TPs, PCs & GOs must respond with updated models, criteria, and compliance strategies.
Advanced Power System Modeling for Resource Planning
By SANDIP R PATEL July 4, 2025
Explore advanced power system modeling for long-term planning. Learn about IRPs, demand forecasting, resource adequacy, resilience, and equity in energy.
Best Practices in Energy-Efficient Data Center Design in 2025
By SANDIP R PATEL July 2, 2025
Learn how to reduce energy use, optimize cooling, and improve efficiency in data centers with the 2024 FEMP & NREL best practices guide.
Explore July 2025 grid reliability trends, IBR registration mandates, and NERC compliance updates. S
By SANDIP R PATEL July 1, 2025
Explore July 2025 grid reliability trends, IBR registration mandates, and NERC compliance updates. Stay ahead with Keentel’s future-ready engineering insights.
Enable seamless Modbus to IEC 61850 integration with the PLX82-MNET-61850 gateway. Achieve NERC comp
By SANDIP R PATEL June 26, 2025
Enable seamless Modbus to IEC 61850 integration with the PLX82-MNET-61850 gateway. Achieve NERC compliance with audit-ready substation communication.
SEL Synchrophasor Technology for Grid Monitoring | Keentel
By SANDIP R PATEL June 20, 2025
Discover how SEL synchrophasor systems, including the SEL-487E PMU, support real-time power grid monitoring and NERC PRC-002-2 compliance. Learn more with Keentel.
Explore NERC PRC-029-1 ride-through requirements for inverter-based resources (IBRs). Learn how it e
By SANDIP R PATEL June 20, 2025
Explore NERC PRC-029-1 ride-through requirements for inverter-based resources (IBRs). Learn how it enhances grid reliability with FERC Order No. 901 support.
Ensure NERC PRC-028 compliance with TESLA 4000 and Keentel Engineering’s expert integration, monitor
By SANDIP R PATEL June 19, 2025
Ensure NERC PRC-028 compliance with TESLA 4000 and Keentel Engineering’s expert integration, monitoring, and audit support services for utilities and GOs.
Ensure your relays don’t trip during stable power swings. Learn how PRC-026 compliance works, what r
By SANDIP R PATEL June 13, 2025
Ensure your relays don’t trip during stable power swings. Learn how PRC-026 compliance works, what relays it applies to, and how to automate your evaluations.
Build winning transmission proposals for PJM with Keentel. Integrated engineering + financial modeli
By SANDIP R PATEL June 9, 2025
Build winning transmission proposals for PJM with Keentel. Integrated engineering + financial modeling to support CapEx, ARR, NPV, and risk analysis.
Explore New York’s 2025 electric grid outlook — aging generation, large loads, renewables, and winte
By SANDIP R PATEL June 9, 2025
Explore NYISO’s ( New York’s) 2025 grid forecast: aging plants, AI-driven demand, winter risks, and interconnection delays plus engineering solutions from Keentel.
Dynamic Equivalents for Large Power Systems Using PSS/E | Keentel Engineering
By SANDIP R PATEL June 8, 2025
Enhance utility-scale power system modeling with PSS/E dynamic equivalents. Reduce complexity, protect data, and improve simulation accuracy using proven techniques.

Keentel Engineering is your trusted partner for reliable and compliant power system solutions across the U.S. Whether you're searching for electrical engineers, power system engineering services, or transmission and relay support, our experienced team delivers expert consulting in wind, solar, BESS, and substation design. We specialize in NERC compliance, winterization, and modeling support to meet your project’s most critical technical and regulatory needs.