Power System Engineering for Oil, Gas & Mining Facilities
Oil, gas, and mining operations often operate in remote locations where electrical reliability is critical for safe and continuous operations. These facilities rely on robust power systems to support drilling equipment, processing plants, pumps, and heavy industrial loads.
About Keentel Engineering
Your Trusted Partner in Electrical Engineering and Power Systems
At Keentel Engineering, we deliver electrical power engineering services built on 30 years of experience and a commitment to excellence. Our clients include utilities, developers, EPCs, and public agencies across the U.S.
Unlike firms that sacrifice technical depth to chase billable hours, we prioritize precision, compliance, and value engineering. From transmission services and relay modeling to winterization and SCADA planning, we never compromise on quality.

Why Choose Keentel Engineering?
Client-Focused Work Approach
At Keentel Engineering, we take pride in being the go-to electrical power engineering firm for power and utility system planning, substation design, protection, control, and power system analysis. The following attributes distinguish our team in utility-grade substation engineering and compliance-driven project delivery.
30 Years of Experience
With three decades of hands-on project delivery, we bring unmatched expertise in substation layout design, substation electrical and civil engineering, relay protection, and grid-tie solutions. Our experience includes projects in complex terrain, urban retrofit environments, and utility-scale renewable integrations.
Quality with Innovation
Our engineering process applies AutoCAD 3D, BIM modeling, and system-level substation design practices to ensure accurate planning, reduced errors, and efficient coordination across all project stakeholders.
Our workflow includes 3D substation design, enabling clash-free coordination between structural, electrical, and civil disciplines.
Attention to Detail
From grounding grid studies to relay protection settings, we engineer every detail to improve system reliability, performance, and operational safety. Our rigorous QA/QC process ensures compliance with IEEE, NFPA, and ISO/TSO interconnection standards.
Among leading electrical substation design companies, Keentel Engineering stands out for 30+ years of proven high-voltage and utility-grade project delivery.
Keentel Engineering video
Accreditations and memberships




Contact details
Tell Us About Your Project
1 business day replyFirst name, email and what you're interested in are all we need to get moving. Everything else, including drawings or an RFP, is optional.
Power System Engineering for Extraction and Processing Facilities
Oil, gas, and mining facilities require reliable power for critical equipment.
Our services include:
- Electrical system design for
industrial plants
- Short circuit and protection studies
- Motor starting analysis
- Power system stability analysis
- Electrical safety assessments
These studies ensure reliable operation of critical industrial equipment.
PSS®E
ETAP
PSCAD
PowerWorld
SKM PTW

Power System Reliability for Remote Operations
Many energy extraction sites operate in isolated or weak grid environments.
Keentel Engineering performs studies to evaluate:
- Microgrid operation
- Generator stability
- Power quality performance
- Backup generation reliability
This ensures reliable operation even in remote environments.

Electrical Safety and Hazardous Location Design
Oil and gas facilities must comply with strict electrical safety requirements.
Our engineers support:
- Hazardous area electrical design
- Grounding system analysis
- Protection system design
- Arc flash hazard evaluation
These services ensure compliance with NEC and international safety standards.
Our Software Capabilities
PSS®E
ETAP
PSCAD
PowerWorld
SKM PTW
AutoCAD Elec.
ASPEN







Contact Keentel Engineering
Planning an oil, gas, or mining project? Keentel Engineering helps industrial facilities improve electrical reliability, safety, and power system performance.
Our engineers support power system studies, grid interconnection, substation engineering, and industrial electrical infrastructure projects.

FAQ – Oil, Gas & Mining
1. Why are electrical reliability studies important for mining operations?
Equipment downtime can result in major production losses.
2. What is microgrid analysis?
It evaluates isolated power systems operating independently from the main grid.
3. Why are motor starting studies important in oil and gas facilities?
Large motors can cause voltage dips during startup.
4. What is hazardous area electrical design?
It ensures electrical equipment operates safely in explosive environments.
5. What standards apply to these facilities?
NEC hazardous location codes, IEEE standards, and industry safety regulations.