The Designers
16 Engineers
They turn lines into lifelines. With tools like AutoCAD, Revit, ETAP, PVSyst, and CAD 3D, they translate ambition into design—calculating, modeling, and detailing systems that work the first time.
At Keentel Engineering and its Consultants, our mission is to establish a sustainable business that delivers top-notch technical services to meet the unique needs of our valued clients.

Power Engineering Expertise for an Evolving Grid
Keentel Engineering is a multidisciplinary power engineering company supporting utilities, developers, EPCs, and energy-intensive facilities across complex electrical infrastructure projects.
Our team brings together expertise in power system studies, substation design, POI interconnection engineering, transmission line design, utility-scale renewable energy, Owner’s Engineer services, MEP engineering, NERC compliance, and nuclear power plant services.
From early-stage planning and system studies through detailed engineering and project support, we help clients address technical challenges with practical, constructible, and grid-ready engineering solutions.
At Keentel Engineering, we take pride in being the go-to engineering firm for power and utility system planning, design, control, and analysis. Some of the many attributes of our company that set us apart are:
Our team works cohesively on every project and with every client. We first develop a solid understanding of your project goals, requirements, and needs. From concept to commissioning, we assist you in every step.
We have over two decades of experience in design and interconnection. Rest assured, we have the knowledge, understanding, and expertise to handle and execute all types of projects with sheer perfection and superior workmanship.
At Keentel Engineering, we have established our stellar market reputation on quality, work ethics, and innovation.
We work on every project with laser focus and attention to detail. This enables our team to deliver desired results with complete satisfaction.
Learn more about Keentel Engineering.

We’re not just engineers—we’re problem solvers, system thinkers, and quiet revolutionaries helping power the future.
Across the United States, our 51-member electrical engineering team shows up every day to bring certainty to complexity. We’re licensed. We’re seasoned. And we’re divided into three groups, each doing what they do best:
16 Engineers
They turn lines into lifelines. With tools like AutoCAD, Revit, ETAP, PVSyst, and CAD 3D, they translate ambition into design—calculating, modeling, and detailing systems that work the first time.
17 Engineers
These are your PSCAD, PSS®E, and DIgSILENT experts. They speak the language of large-scale power plants and grid dynamics—ensuring your project plays well with the utility and the future.
18 Engineers
They live and breathe compliance. From OSHA and NFPA 70 (NEC) to NERC and FERC, they make sure your systems are bulletproof—ready for inspection, audit, and everything in between.
6 Engineers
This team excels in detailed electrical design, utilizing software such as AutoCAD, CAD 3D, Revit, ETAP, and PVSyst. They are proficient in conducting all necessary electrical calculations to support high-quality deliverables for utility-scale and industrial projects.
7 Engineers
Focused on advanced modeling and simulation, this group specializes in conducting dynamic and steady-state analyses using tools such as PSCAD, PSS®E, and DIgSILENT PowerFactory. Their expertise supports large power plant interconnections and grid integration studies.
5 Engineers
This team ensures that our projects meet all relevant codes and standards, including OSHA, NFPA 70 (NEC), and NERC/FERC regulations. They oversee electrical safety compliance, perform regulatory studies, and support audit readiness for both new and existing installations.
IEEE Senior Member · Founder & CEO, Keentel Engineering
In 1995, Sandip (Sonny) R. Patel earned his Electrical Engineering degree from the University of Illinois. But degrees don’t build legacies — action does.
For three decades, he’s shaped the power industry from every side of the table: utility engineer, generator lead, NERC Regional Entity Senior Compliance Engineer and Audit Team Lead, and testing and commissioning lead on equipment up to 765 kV. His career spans nuclear, hydroelectric, conventional generation, renewables, oil and gas, mining, and today’s data centers.
Not just an engineer — a Licensed Electrical Contractor in Florida with an Unlimited EC license. Not just an executive — the founder and CEO of Keentel Engineering, where expertise meets execution. Three decades. Multiple states. Endless impact.

At Keentel Engineering, we take pride in being the go-to engineering firm for power and utility system planning, design, control, and analysis. Some of the many attributes of our company that set us apart are:
At Keentel Engineering and its Consultants, our mission is to deliver high-quality technical services tailored to the unique needs of our clients.
We are committed to maintaining a strong technical foundation and providing reliable, cost-effective solutions.
With over 30+ years of hands-on experience in industrial and utility power systems, our expertise includes power system analysis, electrical design, transmission planning, protective relaying, and NERC compliance.
We are dedicated to solving our clients’ challenges and ensuring the reliability and performance of their electrical systems.
To ensure we offer clients value-added solutions that showcase technical prowess. Our work is superior, cost-effective and designed to enhance electrical engineering system safety and reliability with the combination of our experience, knowledge, technology and expertise with ASPEN, PSSE (version 33/34), Digsilent and ETAP and other power system software programs.
To offer a growth rate of over 50% in the next five years by becoming a top choice and preferred partner for specialized and provider of various electrical engineering solution among IPP, large scale renewable sector and conventional T&D assets owners.
We want to continuously deliver projects promptly, thereby exceeding the stakeholders’ expectations in terms of high quality and completion while following industry mandated procedures and programs.
Serving for more than two decades, we are a name you can trust and count on for your power system and engineering support needs. We can provide innovative solutions to take your business to greater heights.
State of Florida — Registry No. 36853, KEENTEL LLC, DBA: KEENTEL ENGINEERING
Copyright 1995-2026 Keentel Engineering All Rights Reserved
add a title
Add a link
Add a link
Add a link
add a title
Add a link
Add a link
Add a link
add a title
Add a link