A Coordinated Electric System Interconnection Review—the utility’s deep-dive on technical and cost impacts of your project.
Challenge: Frequent false tripping using conventional electromechanical relays
Solution: SEL-487E integration with multi-terminal differential protection and dynamic inrush restraint
Result: 90% reduction in false trips, saving over $250,000 in downtime
The three operating regions you have to design to
| Device | Output vs voltage | Response | Best suited to | Main limitations |
|---|---|---|---|---|
| Mechanically switched capacitor or reactor | Proportional to voltage squared | Seconds; discrete steps; limited switching operations per day | Steady-state reactive supply, voltage profile, loss reduction | No dynamic capability; step voltage change on switching; capability collapses when most needed |
| Static var compensator | Capacitive branches proportional to voltage squared | A few cycles; continuously controllable | Continuous control where cost matters and deep voltage support is not the driver | Square-law capability loss; harmonic filters are part of the plant and interact with the network |
| STATCOM | Approximately proportional to voltage — constant current capability | One to two cycles closed loop; converter response faster still | Voltage stability margin, weak interconnections, fast disturbance recovery, flicker and unbalance compensation | Higher capital cost; converter losses; adds a converter and its control dynamics to the network |
| Synchronous condenser | Governed by machine capability and excitation | Excitation response in the hundreds of milliseconds; inherent inertial response instantaneous | System strength and inertia, short-circuit contribution, black start support | Rotating plant with maintenance and losses; slower controlled response than a converter |
| STATCOM with energy storage | Reactive as a STATCOM, plus real power within the storage rating | As STATCOM for reactive; real power limited by storage | Where a real power deficiency is part of the problem | Cost and complexity of the storage; different failure and maintenance profile |
| Service area | What we do for SST campuses | Typical deliverables |
|---|---|---|
| Grid interconnection | Site screening, large-load applications, independent studies, utility and RTO coordination in ERCOT, NYISO, PJM and other markets | Screening reports, application data packages, load flow, contingency and stability studies, study review memos |
| EMT modeling | Model requirements, vendor model review, campus aggregation, ride-through, weak-grid, control interaction and load-oscillation studies | EMT model specifications, model acceptance reports, PSCAD study reports, SCR screening |
| MV/MVDC system studies | AC and DC short-circuit, DC protection philosophy, AC protection, arc flash, grounding, insulation coordination | Study reports, protection philosophy documents, settings files, arc flash labels, interface control documents |
| Power quality | Emission requirements, frequency scans, IEEE 519-2022 compliance, filter sizing, flicker assessment | Harmonic study reports, filter specifications, monitoring plans |
| Substation and transmission design | HV/EHV substations, MV collectors, transmission lines, utility interface protection | Physical and electrical drawing packages, specifications, bills of material, protection and control design |
| NERC compliance | Registration and applicability, ride-through requirements, model validation, monitoring, compliance programs | Applicability assessments, compliance programs, evidence packages, model validation reports |
| Owner's engineer and QA/QC | SST, storage and substation specifications, design reviews, FAT and SAT plans and witnessing, multi-unit QA | Specifications, review comments, test plans, witness reports, due diligence reports |
| Onsite generation and BESS | Role definition and sizing, DC bus control architecture, fire and code compliance coordination, performance testing | Sizing studies, control architecture documents, specifications, test procedures |
Storage and generation
| Term | Meaning |
|---|---|
| AFE | Active front end. The actively switched AC/DC stage of an SST that connects to the MV grid and sets its grid behavior. |
| Aggregated model | A model in which many converters are represented by a smaller number of equivalent converters to make campus-scale simulation practical. |
| Arc flash | The release of energy from an electric arc fault, assessed as incident energy at a working distance to set PPE and safe work practices. |
| BESS | Battery energy storage system. |
| Blocking | Turning off all converter switches so the converter stops feeding current, used to limit DC faults. |
| Composite load model | A positive-sequence load model that combines several load types, such as motors, electronics and static loads. |
| DAB | Dual active bridge. An isolated DC/DC converter topology with active bridges on both sides of a high-frequency transformer. |
| DC-link | The internal DC capacitor bank between converter stages. |
| EMT | Electromagnetic transient simulation. Time-domain simulation with microsecond time steps, used to study fast converter and network behavior. |
| FAT | Factory acceptance test. |
| Grid-forming | A converter control mode that sets its own voltage and frequency reference rather than following the grid's, providing support to weak grids. |
| HIL | Hardware-in-the-loop testing, in which a real controller is tested against a real-time simulation. |
| IBR | Inverter-based resource. Generation or storage connected to the grid through power electronics. |
| Insulation coordination | Matching the insulation strength of equipment to the voltage stresses the system produces, with surge protection where needed. |
| ISC/IL | The ratio of available short-circuit current to maximum demand load current at the point of common coupling, used to set IEEE 519 limits. |
| ISOP | Input-series, output-parallel. A modular converter arrangement that shares a high input voltage across cells in series and combines their outputs in parallel. |
| Large load | A load large enough to affect transmission system reliability. Definitions vary, for example 75 MW and above under Texas SB 6, or loads above 20 MW in the federal rulemaking proposal. |
| LVDC | Low-voltage DC, such as 800 VDC or ±400 VDC rack distribution. |
| MFT | Medium-frequency transformer. The compact isolation transformer inside an SST, operating at kilohertz frequencies. |
| MMC | Modular multilevel converter. A converter built from many submodules with their own capacitors, producing a stepped multilevel waveform. |
| MVDC | Medium-voltage DC distribution, roughly 1 kV to 35 kV DC in common usage. |
| OE | Owner's engineer. An independent engineer representing the owner's technical interests. |
| PCC / POI | Point of common coupling / point of interconnection, where the campus connects to the utility system and where compliance is usually assessed. |
| PLL | Phase-locked loop. The control element that tracks grid voltage phase and frequency. |
| Positive-sequence model | A fundamental-frequency, balanced dynamic model used in PSS®E, PSLF and similar tools. |
| Ride-through | The ability to stay connected and keep operating during and after a grid disturbance within defined limits. |
| SAT | Site acceptance test. |
| SCR | Short-circuit ratio. Available short-circuit power divided by converter rating, a measure of grid strength. |
| SiC | Silicon carbide, a wide-bandgap semiconductor material that allows higher voltage, higher frequency switching. |
| SST | Solid-state transformer. A power electronic converter with a high-frequency isolation stage that replaces a 60 Hz transformer and rectifier chain. |
| Supraharmonics | Emissions in the 2 kHz to 150 kHz range, above the range covered by most harmonic limits. |
| TDD | Total demand distortion. Harmonic current distortion relative to maximum demand current, used in IEEE 519. |
| WSCR | Weighted short-circuit ratio. An SCR screen that accounts for several inverter-based plants sharing a network area. |
Links were current at publication (November 2026). Large-load rules, NERC actions and standards editions are changing quickly, so confirm current versions before relying on them.
Large-load reliability and NERC
- NERC Publishes Incident Review and Guidance on Voltage-Sensitive Large Load Integration, NERC
- Reliability Insights: Large Computational Load Risks Due to Voltage Sensitivity, NERC, September 2026
- NERC Seeks to Address Reliability Impacts from Large Load Integration, NERC presentation to FERC, April 2025
- NERC issues Level 3 Alert to address immediate risks data center loads pose to the grid, Renewable Energy World, May 2026
- NERC Voltage-Sensitive Loads, Keentel Engineering
Federal and state large-load rules
- FERC Docket RM26-4, Interconnection of Large Loads, FERC
- FERC Establishes Proceeding to Consider DOE Directive on Large Load Transmission Interconnection Rulemaking, McGuireWoods, October 2025
- Texas Senate Bill 6 Ushers in Major Overhaul of Large Load Interconnection and Grid Access Rules, Bracewell, July 2025
- Public Utility Commission of Texas Issues Proposed Rules for Large Load Interconnections, Foley & Lardner, March 2026
Solid-state transformers and DC data center power
- Solid State Transformer project, Open Compute Project
- Novel Solid-State Transformer Supports 800-V DC Power in AI Data Centers, Electronic Design
- How SSTs are Reshaping Data Center Infrastructure, Microchip Technology
Standards referenced (consult the publisher for the current edition)
Step 5 — options. Replacing or retrofitting the drives with active-front-end or 18-pulse units at about 5% THDi gives a TDD of about 1.5%. An active harmonic filter sized for the 5th and 7th could achieve a similar result at the facility level. A passive 5th-harmonic tuned filter would also work but must be checked for resonance with the utility system and with any future capacitors.
What this means for you.
The same drives can be compliant on a strong system and non-compliant on a weak one. Ask your utility for the maximum short-circuit current at the PCC early in design. If the ratio is below 50, plan for low-harmonic drives or filtering from the start; it is much cheaper than retrofitting.
9. Inverter-based resources: solar, storage and wind
Solar PV, battery energy storage and full-converter wind turbines use pulse-width-modulated inverters with output filters. They are generally low-distortion sources. IEEE Std 1547-2018 (distribution-connected resources) and IEEE Std 2800-2022 (transmission-connected resources) limit their current distortion — total rated-current distortion (TRD) of 5% with individual limits by order, measured against rated current rather than present output. In practice, quality inverters measure 1–3% at rated output.
Three cautions apply:
- Percentages rise at low output. At 10% of rated output a 2% distortion (of rated current) looks like 20% THD. Limits referenced to rated current, like TDD, avoid this trap.
- Inverters change the system's impedance. Plant collector cables, inverter output filters and capacitor banks add capacitance. They can create resonances near the 5th to 13th harmonics on the 34.5 kV collector or at a 138 kV, 230 kV or 345 kV point of interconnection, amplifying background distortion that the plant did not create.
- Background distortion matters. Inverters can absorb or amplify existing voltage distortion depending on their control design. Utilities increasingly require harmonic impedance studies for new plants, sometimes using electromagnetic transient (EMT) simulation.
Keentel's articles on harmonic resonance and on
weak-grid inverter stability cover these interactions in depth.
10. Data centers and other electronic facilities
Data centers are a special case because almost all their load is electronic. Points to check:
- UPS rectifiers. Double-conversion UPS units with IGBT rectifiers typically draw less than 5% THDi at rated load, rising at low load. Older six-pulse or 12-pulse thyristor UPS rectifiers may need input filters.
- Server and network power supplies. Modern units with active power factor correction have low 3rd harmonic. Legacy equipment does not. Measure a representative panel rather than assuming.
- 208Y/120 V and 415Y/240 V distribution. Check neutral current and transformer K-factor as in Sections 4 and 7.
- Generator operation. Test UPS and generator compatibility at the actual load level. Generator THDv can be three to four times the utility THDv for the same load.
- Cooling plant. Chiller, pump, fan and cooling distribution unit drives often contribute more low-order harmonics than the IT load. Specify low-harmonic drives where the facility is large relative to the utility source.
- Large-load interconnection. Utilities and grid operators now treat large data centers as high-impact loads. Harmonic studies and power quality monitoring are increasingly part of interconnection requirements, alongside ride-through and dynamic studies.
11. How a harmonic study is done
A harmonic study answers four questions: How much harmonic current will the facility inject? What voltage distortion will it cause? Will any resonance amplify it? What is the cheapest reliable fix? Keentel's typical workflow:
- Gather data. Single-line diagram; utility short-circuit data (maximum and minimum) at the PCC; utility background distortion if known; transformer impedances; cable lengths; capacitor banks and filters; drive, UPS and inverter data sheets with harmonic spectra.
- Measure existing conditions. For existing facilities, install class-compliant power quality meters at the PCC and key buses for at least one week, capturing 10-minute and 3-second data up to the 50th harmonic.
- Build the model. Represent sources as harmonic current injections and the network as frequency-dependent impedances, including transformer phase shifts that can cancel 5th and 7th harmonics between delta-delta and delta-wye units.
- Run a frequency scan. Plot driving-point impedance versus frequency at each important bus to find resonances, for all credible system configurations (tie breakers open/closed, capacitor steps in/out, generator versus utility).
- Run harmonic load flow. Calculate harmonic currents and voltages and compare them with IEEE 519 at the PCC and with equipment limits (IEEE 18 for capacitors, C57.110 for transformers) inside the facility.
- Design mitigation. Compare options for performance, cost, losses, footprint and future flexibility.
- Verify. Measure again after installation and document compliance with the statistical criteria.
12. Fixing harmonics: options compared

Solid-State Transformer Design: Architecture, Protection, Standards and EVT Testing
November 25, 2026 | Blog
Part A — Solid-State Transformers and EVT at a Glance
A solid-state transformer (SST) does the job of a conventional 60 Hz distribution transformer with power electronics. Instead of one large iron core working at line frequency, it converts medium-voltage AC into DC, chops that DC at tens of kilohertz, passes the energy through a small medium-frequency transformer for galvanic isolation, and then rebuilds the low-voltage output the load needs: 480 V AC, or increasingly a DC bus such as 800 VDC for AI data center racks and megawatt-scale EV charging.
Job descriptions and project scopes across the industry now use the phrase "SST design through EVT." EVT stands for Engineering Validation Test, the first stage of formal hardware validation, in which the first engineering prototypes are built and tested to prove that the design does what the specification says. "Design through EVT" therefore means owning a product from requirements and architecture to working, characterized prototypes, the point at which the design is mature enough to freeze for Design Validation Test (DVT), certification and pilot production.
This guide is Keentel Engineering's complete technical treatment of that journey. It explains how an SST works, how each stage is sized, what limits efficiency, insulation, protection and reliability, which US standards apply and where gaps remain, and what an EVT program for a medium-voltage power-electronic product must prove before the design moves on. Every calculation is worked on US distribution voltages (4.16, 12.47, 13.8 and 34.5 kV) at 60 Hz. Every figure is original, and every factual claim is referenced at the end.
Keentel's position. Keentel Engineering is an independent power engineering firm. We do not design or sell SST hardware. We help data center owners, EV charging developers, utilities, EPC contractors and SST developers specify, study, interconnect, protect, test and commission medium-voltage power electronics from 4 kV to 765 kV. That independence is why owners use us to witness EVT and DVT testing and to translate laboratory results into grid-ready designs.
Who this guide is for
- Data center owners and developers evaluating 800 VDC architectures and SST-based power trains.
- EV fleet depot and charging-hub developers considering medium-voltage connected chargers.
- Utilities and distribution planners assessing SSTs on 12.47 kV and 13.8 kV feeders.
- Power-electronics engineering teams and startups taking an SST from schematic to EVT and beyond.
- EPC contractors and owner's engineers who must specify, procure, install and commission the first units.
- Investors and lenders who need to understand technical maturity and risk at each development gate.
Key facts at a glance
| Item | Value or practice | Basis |
|---|---|---|
| Early concept | 1968–1970 US patents described converter circuits with a high-frequency transformer link acting as an electronic transformer | US patents 3517300, 3564390, 3582756 |
| Major US research program | NSF FREEDM Engineering Research Center at North Carolina State University, launched 2008, made the SST a central building block | NCSU FREEDM, NSF |
| Common architecture | Three stages: MV rectifier, isolated DC–DC with medium-frequency transformer, LV output stage | Research literature; Keentel Figure 1 |
| Typical modular approach for 13.8 kV | Cascaded cells per phase using 1.7 kV or 3.3 kV SiC devices; 7 + 1 cells per phase at 3.3 kV in Keentel's example | Keentel worked example 2 |
| Isolation stage frequency | Typically about 10–50 kHz in published MV designs; 20 kHz in Keentel's examples | Research literature |
| Core size benefit | Area product about 75 times smaller at 20 kHz than at 60 Hz for the same 104 kW cell in Keentel's example | Keentel worked example 5 |
| Efficiency | Published MV SST prototypes around 97–99%; overall chain advantage depends on what it replaces | Research literature; Keentel worked example 6 |
| Fault current | Typically limited to roughly 1–2 times rated current by controls and device ratings | Keentel worked example 11 |
| Lightning withstand | The SST must coordinate with the system BIL (for example 95 kV for many 15 kV-class distribution applications) through arresters and insulation design | IEEE C57.12.01, IEEE C62.22 practice |
| What EVT proves | The engineering design meets its specification on real hardware | Hardware product-development practice |
| What EVT does not prove | Certification, manufacturability at volume, long-term field reliability | DVT, PVT and field experience |
The core ideas in one table
| Idea | What it means in practice |
|---|---|
| Frequency shrinks magnetics | Transformer core size scales roughly inversely with frequency, so a 20 kHz transformer can be a small fraction of the size of a 60 Hz one for the same power, if losses and insulation are managed. |
| Medium voltage forces modularity | Today's commercial silicon carbide (SiC) devices are rated in the low kilovolts, so a 13.8 kV SST stacks many cells in series on the input and parallels them on the output. |
| Isolation is the hardest part | The medium-frequency transformer must hold full MV insulation while switching at high dv/dt and tens of kilohertz; partial discharge and insulation aging decide life. |
| The SST is a controllable node | It can hold unity power factor, limit fault current, regulate output voltage, supply DC directly and report detailed data; a 60 Hz transformer can do none of these. |
| Protection philosophy changes | Fault current is limited, inrush disappears, and upstream overcurrent relays may never see a downstream fault; selectivity must be engineered, not assumed. |
| Standards lag the technology | No single US standard covers an MV SST the way IEEE C57 covers transformers; listing, approval and specifications must be built from several sources. |
| EVT is a gate, not a milestone date | A design leaves EVT when written exit criteria are met with test evidence, not when the calendar says so. |
| Owners need independent eyes | The first SSTs on a site are prototypes in all but name; owner's engineering, witness testing and interconnection studies reduce risk. |
Fact check: common simplifications about SSTs and EVT
| Common statement | Keentel's engineering check |
|---|---|
| "An SST is just a smaller transformer." | It is a power-electronic converter system with a transformer inside it. It behaves like a controlled source and a controlled load, not like a passive impedance. Grid studies, protection and listing must treat it that way. |
| "SSTs are always more efficient." | A well-designed SST can beat a 60 Hz transformer followed by a low-voltage rectifier when the load needs DC, because it removes a conversion step. Compared with a 60 Hz transformer alone serving AC loads, a high-efficiency liquid-filled transformer (often above 99%) usually wins on efficiency. |
| "SSTs eliminate fault current problems." | They eliminate high fault current, which is helpful for equipment ratings and arc flash, but they create selectivity problems: downstream breakers and fuses may not clear in time if fault current is limited to 1.5 per unit. Protection must be redesigned. |
| "EVT means the product is ready." | EVT proves the engineering design. Certification testing, production-intent parts, environmental and reliability testing belong to DVT; factory yield and process control belong to PVT. |
| "If it passes EVT in the lab, it will work on the grid." | Laboratory sources are often stiffer and cleaner than a real feeder. Grid interaction (harmonics, resonance, weak-grid control stability, surges) must be tested with a grid simulator, a realistic source impedance and EMT models. |
| "The NEC treats an SST like any transformer." | The NEC defines transformers and power conversion equipment separately, and an SST may be listed as power conversion equipment rather than as a transformer. The authority having jurisdiction (AHJ) decides; early alignment avoids late surprises. |
Eight findings for decision makers
1. The business case is strongest where the load wants DC. For 800 VDC AI data centers and MV-connected EV charging, an SST removes a conversion stage and the space of a 60 Hz transformer plus rectifier lineup.
2. Modularity is both the strength and the risk. Dozens of cells give redundancy, but every cell adds capacitors, gate drivers, sensors and firmware that can fail.
3. The medium-frequency transformer is the critical component. Insulation design, partial discharge margin and thermal management set lifetime more than the semiconductors do.
4. Surge and BIL coordination must be designed in. Power electronics do not have the inherent impulse strength of an oil-paper winding; arresters at the terminals and coordinated insulation are mandatory.
5. Protection must be re-engineered. Limited fault current changes upstream relay settings, downstream fuse selection and arc-flash results.
6. Standards are fragmented. Expect to cite IEEE, UL, NEC and some IEC documents together, and to negotiate acceptance with the AHJ and the utility.
7. EVT is where most design risk should be retired. Fixing insulation, thermal or control problems after DVT is far more expensive.
8. Owners should be present at EVT, not only at factory acceptance. The data that matters for interconnection, protection and maintenance is generated at EVT.
Key terms
- SST (solid-state transformer): a power-electronic converter system that provides voltage transformation and galvanic isolation using a medium- or high-frequency transformer. Also called a power electronic transformer or smart transformer.
- MFT (medium-frequency transformer): the isolation transformer inside an SST, operating at roughly 1–100 kHz.
- CHB (cascaded H-bridge): a multilevel converter built from series-connected single-phase full-bridge cells.
- DAB (dual active bridge): an isolated bidirectional DC–DC converter with active bridges on both sides of a transformer, controlled by phase shift.
- MMC (modular multilevel converter): a converter built from series submodules in arms, common in HVDC and some SST concepts.
- ZVS (zero-voltage switching): turning a device on when the voltage across it is near zero, which removes most turn-on loss.
- BIL (basic lightning impulse insulation level): the crest of a standard 1.2/50 µs impulse that insulation must withstand.
- PD (partial discharge): a localized electrical discharge that partially bridges insulation; the main aging mechanism in MV power-electronic insulation.
- PDIV / PDEV: partial discharge inception and extinction voltages.
- EVT / DVT / PVT / MP: Engineering Validation Test, Design Validation Test, Production Validation Test and Mass Production, the standard hardware development gates.
- HIL (hardware-in-the-loop): testing the real controller against a real-time simulation of the power stage and grid.
- DFMEA / PFMEA: design and process failure mode and effects analysis.
- FIT (failures in time): failures per billion device-hours.
Part B — The Engineering Guide: From Architecture to EVT
1. What a solid-state transformer is, and why it is back in the news
The idea is older than most engineers expect. In the late 1960s, US patents described power converter circuits that operated "as an electric potential transformer" by inserting a high-frequency transformer link between two converters, so that the bulky line-frequency core could be replaced with a much smaller one. Those patents (including US 3,517,300, US 3,564,390 and US 3,582,756) laid out the basic insight that still drives every SST: transformer size falls as frequency rises, and power semiconductors can create the high frequency.
What was missing for decades was a switch that could block medium voltage, switch fast and survive. Silicon thyristors and later IGBTs could do one or two of those things, but not all three at acceptable losses. The research picture changed in 2008, when the US National Science Foundation established the FREEDM Systems Center at North Carolina State University as an Engineering Research Center, with the SST as a central building block of a proposed "energy internet" for distribution grids. FREEDM and other groups, including the Power Electronic Systems Laboratory at ETH Zurich, published generations of MV SST prototypes, first with silicon devices and later with high-voltage silicon carbide (SiC) MOSFETs rated 10 kV and 15 kV.
Three developments brought the SST from laboratories into commercial planning between 2024 and 2026:
1. Commercial SiC devices at 1.2, 1.7 and 3.3 kV became widely available, with automotive-driven volumes reducing cost and improving reliability data.
2. AI data centers began moving toward 800 VDC rack power distribution to serve rack loads of hundreds of kilowatts to megawatts. Trade press throughout 2025 and 2026 described SSTs converting medium voltage directly to 800 VDC as a natural partner for that architecture.
3. Transformer supply constraints pushed the US Department of Energy to fund flexible and innovative transformer technologies, and ARPA-E to support modular SST and active-substation research.
Keentel Study Spotlight — technology readiness review. Before an owner commits a site to SSTs, Keentel performs an independent readiness review: architecture, device ratings, insulation design, test evidence to date, applicable standards, listing path, utility interconnection requirements and the developer's EVT/DVT plan. The result is a risk register with owners, mitigations and decision gates, written for engineers and for the investment committee.
How Keentel Engineering helps here. We bring a utility and transmission perspective to a technology that is usually discussed from the device level up. Keentel connects SST capabilities to the questions owners actually face: what the utility will require at the point of interconnection, how protection and arc flash change, and what evidence the AHJ will want.
2. Architectures: single-, two- and three-stage SSTs
Engineers classify SSTs by how many power conversion stages they use and where the DC links sit.
| Architecture | Description | Strengths | Weaknesses |
|---|---|---|---|
| Single-stage (matrix or direct AC–AC) | AC is converted to high-frequency AC and back without a DC link | Fewest components, no large DC capacitors | No DC port, limited ride-through, complex commutation |
| Two-stage | MV AC to DC, then isolated DC–DC to LV DC (or DC–DC to LV AC) | Fewer stages, good for DC outputs such as 800 VDC | MV-side DC link only; LV AC output requires an added inverter |
| Three-stage | MV AC to MV DC, isolated DC–DC, LV DC to LV AC | Full control at both ports, DC links on both sides, reactive power and harmonic control | Most components and losses |
| MMC-based | Modular multilevel converter on the MV side with isolated DC–DC modules | Scales to higher voltages, good harmonic performance | Complex control and capacitor sizing |
| Input-series, output-parallel (ISOP) DAB | Many isolated DC–DC modules with inputs in series across an MV DC bus and outputs in parallel | Clean modular DC–DC, natural fit for MVDC | Voltage sharing control needed between modules |
For an AI data center that wants 800 VDC, a "three-stage" design often becomes a two-stage design in practice: a cascaded H-bridge (CHB) rectifier on the MV side, followed by one DAB per cell, with all DAB outputs paralleled onto the 800 V bus. Figure 1 shows Keentel's illustrative version of that architecture.

Figure 1. Keentel illustrative architecture for a 2.5 MVA, 13.8 kV to 800 VDC solid-state transformer: a cascaded H-bridge front end, isolated dual active bridge stages with medium-frequency transformers, and a paralleled low-voltage DC output.
The resonant DC transformer is an important variant of the isolation stage. Instead of a phase-shifted DAB, an LLC or CLLC resonant converter runs near its resonant frequency at a fixed ratio, acting as an unregulated "DC transformer," with regulation done by the front end. Resonant stages achieve very high efficiency at their design point, but give up some controllability and need care at light load and during faults.
How Keentel Engineering helps here. In owner's-engineer roles we evaluate the architecture against the site: whether the load needs AC, DC or both; whether bidirectional power flow is needed for batteries or vehicle-to-grid; whether reactive power support is expected at the point of interconnection; and how the architecture affects protection and maintenance.
3. Semiconductors and cell count
The MV front end must block the peak line-to-neutral voltage plus margin. For a 13.8 kV system, the line-to-neutral voltage is 7,967 V rms and its peak is 11,268 V. Allowing 10% for continuous overvoltage gives about 12.4 kV that each phase leg must support.

Designers do not run a device at its full rated voltage. Cosmic-ray-induced failure rates rise steeply as DC voltage approaches the rating, and switching overshoot needs headroom. Utilization of roughly 55–65% of the rated blocking voltage is common for continuous DC link voltage on 1.7 and 3.3 kV devices; the exact figure must come from the device manufacturer's failure-in-time data at the site altitude.
Worked example 1 — rating a 2.5 MVA, 13.8 kV to 800 VDC SST
- Input current at rated power: 2.5 MVA / (√3 × 13.8 kV) = 104.6 A.
- Line-to-neutral voltage 7,967 V rms; peak 11,268 V.
- Output current at 800 VDC with 97.5% efficiency: 2.5 MW × 0.975 / 800 V = 3,047 A DC.
The output current is the first surprise for owners used to AC distribution: an 800 VDC bus carrying 3 kA needs busway or cable sized like a large 480 V service, with DC-rated protection and DC arc-flash analysis.
Worked example 2 — cell count for a cascaded H-bridge front end
- Phase voltage to support including 10% overvoltage: 1.10 × 11,268 = 12,394 V.
- Cell DC link with 3.3 kV SiC at 60% utilization: 0.60 × 3,300 = 1,980 V.
- Cells required per phase: 12,394 / 1,980 = 6.3, rounded up to 7.
- With one redundant cell per phase (N + 1): 8 cells per phase, 24 cells in total.
- Power per cell: 2.5 MVA / 24 = 104.2 kW.
- With 1.7 kV devices at the same utilization (1,020 V per cell), the requirement rises to 13 cells per phase before redundancy.
The comparison illustrates the core trade-off. Higher-voltage devices reduce cell count, connections and control channels, but cost more, switch more slowly and have less field history. Lower-voltage devices are mature and inexpensive, but multiply the number of cells, gate drivers, capacitors and fiber links that must work together.

Worked example 3 — DC-link capacitance per cell
A single-phase H-bridge cell carries power pulsating at twice line frequency (120 Hz). Its DC capacitor must absorb that ripple. For a peak-to-peak ripple of 5% of the cell voltage:

With P = 104.2 kW, ω = 2π × 60 = 377 rad/s, V = 1,980 V and ΔV = 99 V, C ≈ 705 µF per cell, storing about 1.4 kJ at rated voltage. Across 24 cells that is roughly 33 kJ of stored energy: enough to matter for discharge time, arc-flash and maintenance safety procedures, and enough that EVT must verify bleed-down times against the safety specification.
Keentel Study Spotlight — device and cell-count trade study. For developers and owners comparing proposals, Keentel prepares a structured comparison of device class, cell count, redundancy, stored energy, expected failure rate and maintenance access, using each vendor's own data under a common set of assumptions.
How Keentel Engineering helps here. We check that the voltage utilization, altitude derating and redundancy assumptions match the site: a design that works at sea level in a laboratory may not meet its failure-rate target at 5,000 ft elevation, and an N + 1 design only helps if the cell bypass actually works under fault.
4. The isolation stage: dual active bridge physics
The dual active bridge (DAB) is the most common isolation stage in published SST designs. Two full bridges, one on each side of the medium-frequency transformer, produce square waves. The power transferred depends on the phase shift between them and on the series inductance, which is often the transformer's own leakage inductance plus an external inductor. The classic single-phase-shift relationship, with all quantities referred to the primary, is:

where V₁ and V₂' are the bridge DC voltages referred to the primary, φ is the phase shift in radians, f is the switching frequency and L is the series inductance. Maximum power occurs at φ = π/2:

Worked example 4 — sizing the DAB inductance and operating phase shift
For one cell of the 2.5 MVA example:
- Primary DC voltage 1,980 V; secondary 800 V; turns ratio n = 1,980/800 = 2.475.
- Switching frequency 20 kHz.
- Design for 50% overload headroom: P_max = 1.5 × 104.2 kW = 156.2 kW.
- Required inductance (primary-referred, unity voltage conversion ratio): L = 1,980² / (8 × 20,000 × 156,200) = 156.8 µH.
- At rated power the phase shift solves to 0.664 rad, or about 38°, well inside the stable region and leaving room for transients.
These numbers drive several EVT tests. The leakage inductance of the built transformer must match the design within tolerance, or the phase shift and soft-switching range will move. ZVS must be confirmed across the load range, especially at light load and when the two DC voltages are mismatched (for example when the 800 V bus sags during a load step).
Keentel Study Spotlight — control and interaction review. Keentel reviews the developer's DAB and front-end control design against the grid conditions the unit will see: source impedance range, voltage unbalance, harmonic background and load steps typical of AI training clusters. We identify the operating points EVT must cover so that soft-switching and stability are proven where it matters.
How Keentel Engineering helps here. We translate converter control behavior into terms utilities and protection engineers recognize: current limits, response times, ride-through behavior and harmonic emission at the point of common coupling.
5. The medium-frequency transformer
The medium-frequency transformer (MFT) is where the SST's size advantage comes from and where its hardest engineering problems live.
Why frequency shrinks the core
The area-product method relates core window area and cross-section to power, frequency, flux density and current density:

where P_t is the total apparent power handled by the windings (about twice the throughput for a two-winding transformer), K_f is the waveform factor (4.0 for square waves, 4.44 for sine waves), K_u is the window utilization, B_m the peak flux density, J the current density and f the frequency.
Worked example 5 — area product at 20 kHz versus 60 Hz
For one 104.2 kW cell:
| Parameter | 20 kHz MFT | 60 Hz transformer |
|---|---|---|
| Core material (typical) | Nanocrystalline tape | Grain-oriented silicon steel |
| Peak flux density B_m | 0.5 T (loss-limited) | 1.5 T |
| Waveform factor K_f | 4.0 (square wave) | 4.44 (sine) |
| Window utilization K_u | 0.30 (heavy MV insulation) | 0.40 |
| Current density J | 3 A/mm² | 3 A/mm² |
| Area product A_p | ≈ 579 cm⁴ | ≈ 43,400 cm⁴ |
The area product is about 75 times smaller at 20 kHz. Because area product scales with the fourth power of linear dimensions, that corresponds to linear dimensions roughly 2.9 times smaller and core volume roughly 25 times smaller. Note the limits on this benefit: flux density must be reduced at high frequency to control core loss, and the MV insulation consumes much of the window, so the real-world reduction is less dramatic than the frequency ratio alone suggests.
Core materials and conductors
| Material | Typical use | Notes |
|---|---|---|
| Nanocrystalline tape | 10–50 kHz MFTs | High saturation flux and low loss; tape-wound cores need careful cutting and gapping |
| Ferrite | Higher frequencies, smaller ratings | Low loss at high frequency but low saturation flux and brittle; large cores are assembled from blocks |
| Amorphous metal | Lower medium frequencies | Good loss performance, higher magnetostriction and acoustic noise |
| Litz wire / foil | Windings | Litz wire reduces skin and proximity loss at tens of kHz; foil suits low-voltage high-current windings |
Insulation, partial discharge and thermal design
The MFT must isolate the MV side from the LV side for the full system voltage plus transients, while carrying high-frequency, high-dv/dt square waves. That combination stresses insulation differently from 60 Hz sine waves: repetitive fast edges can cause partial discharge (PD) at lower voltages than sine waves, and PD under high-frequency PWM ages insulation faster. Published research on MFT insulation under PWM stress, including work from Denmark, the Netherlands and US national laboratories, reports this accelerated aging and the importance of PD-free design.
Thermal design is equally demanding. Insulation that is good for voltage is usually poor for heat, and winding losses rise with frequency. Many MV MFT designs therefore use dry-type insulation with cast resin or silicone and forced-air or liquid cooling of windings and cores.
Worked example 6 — partial discharge inception margin
- Peak line-to-neutral voltage at 13.8 kV: 11,268 V.
- Add half the cell switching voltage as a common-mode component on the isolation barrier: + 990 V, total ≈ 12.26 kV peak.
- A commonly specified design target is a partial discharge inception voltage at least 1.5 times the highest recurring peak: 1.5 × 12.26 kV = 18.4 kV peak.
- If an EVT prototype measures PDIV at 21.0 kV peak, the margin over the target is 14%: acceptable, but tight enough that EVT must repeat the measurement after thermal cycling and on several units.
The 1.5 factor is a design target commonly applied in power-electronic insulation practice; the governing value must come from the product's insulation coordination basis and the standard used for certification.
Keentel Study Spotlight — MFT and insulation design review. Keentel reviews the MFT insulation coordination basis: working voltages, recurring peaks, impulse withstand, creepage and clearance, PD test levels and test sequence. We compare the design basis with the system grounding and overvoltage conditions at the owner's site, which the laboratory design team often does not know.
How Keentel Engineering helps here. We connect the insulation design to the system it will see: grounding method (effectively grounded, resistance grounded or ungrounded), temporary overvoltages during ground faults, switching surges from capacitor banks and lightning exposure. A design that is PD-free on an effectively grounded 13.8 kV system may not be on a resistance-grounded one, where healthy-phase voltage rises toward line-to-line values during a ground fault.
6. Insulation coordination, dv/dt and common-mode currents
Silicon carbide's speed is a gift for efficiency and a burden for insulation. A 3.3 kV SiC device can switch about 2 kV in tens of nanoseconds. Every fast edge drives displacement current through every parasitic capacitance in its path, including the interwinding capacitance of the MFT, heat-sink-to-chip capacitance and cable capacitance.
Worked example 7 — dv/dt and common-mode current
- Cell voltage 1,980 V switched in 50 ns: dv/dt = 39.6 kV/µs.
- MFT interwinding capacitance 200 pF (illustrative).
- Displacement current per edge: i = C × dv/dt = 200 pF × 39.6 kV/µs = 7.9 A peak.

Eight amperes of high-frequency current crossing the isolation barrier on every switching edge causes EMI, corrupts low-voltage sensor signals, stresses bearings and grounding paths, and can produce PD at weak points. Mitigations include electrostatic shields between windings, lower interwinding capacitance through winding geometry, controlled gate resistance (trading some switching loss for lower dv/dt), common-mode chokes and careful grounding of shields and heat sinks.
Creepage, clearance and pollution
Unlike a sealed oil-filled transformer, an SST has printed circuit boards, bus bars, connectors and fiber-optic interfaces operating at medium voltage inside an enclosure. Creepage and clearance distances depend on working voltage, pollution degree, altitude and material group. For MV power-electronic equipment, the international product safety standard IEC 62477-2 (covering converters from 1,000 V AC or 1,500 V DC up to 36 kV AC or 54 kV DC) gives a structured method; US projects frequently use it alongside UL and IEEE documents because no single US standard yet covers MV power conversion equipment of this kind comprehensively.
How Keentel Engineering helps here. Keentel checks the insulation basis against site altitude, environment (coastal, desert dust, industrial pollution), enclosure ventilation and maintenance practices. We also verify that the grounding and shielding design of the SST is compatible with the facility grounding system and with IEEE 142 and IEEE 1100 practice for sensitive electronic loads.
7. Efficiency, losses and cooling
Efficiency claims for SSTs vary widely because the comparison baseline varies. Three comparisons are common and give different answers:
1. SST versus a 60 Hz transformer alone, for an AC load. A large liquid-filled distribution transformer is often 99% or better at its best operating point. An SST that must produce 480 V AC has three conversion stages and is unlikely to beat it.
2. SST versus a 60 Hz transformer plus a rectifier, for a DC load. This is the data center and EV charging case. The conventional chain has a high-efficiency transformer followed by an LV rectifier of roughly 97–98%. An SST that converts MV directly to 800 VDC can match or beat that chain.
3. SST versus a transformer plus UPS plus power supplies. In data centers the SST may also absorb functions of other equipment, which changes the comparison again.
Worked example 8 — efficiency chain and losses
| Chain | Stage efficiencies (illustrative) | Overall | Loss at 2.5 MW output |
|---|---|---|---|
| SST, 13.8 kV to 800 VDC | 99.0% front end × 98.9% DAB + MFT × 99.5% filters and auxiliaries | 97.42% | 66.2 kW |
| 60 Hz transformer + LV rectifier | 99.3% transformer × 97.5% rectifier | 96.82% | 82.2 kW |
The SST in this example saves about 16 kW at full load. At an average 80% loading that is about 112 MWh per year, or roughly $9,000 per year at $80/MWh. If the real SST achieves only 97.0%, its loss rises to 77.3 kW and the saving nearly disappears. Two lessons follow. First, efficiency must be measured at EVT across the full load range, not quoted at a single best point. Second, the economic case for SSTs in data centers rests more on space, speed of deployment, controllability and the DC architecture than on efficiency alone.


Figure 2. Illustrative efficiency-versus-load curves for an SST and a 60 Hz transformer with an LV rectifier, from simple Keentel loss models (no-load, proportional and resistive losses). These are not vendor data; EVT must replace them with measured efficiency maps.
Worked example 9 — switching losses and why soft switching matters
Using illustrative 3.3 kV SiC half-bridge module data (turn-on 40 mJ and turn-off 15 mJ at 1,800 V and 400 A):
- Front end, hard-switched at 5 kHz with about 105 A rms cell current: about 36 W per switch.
- DAB, hard-switched at 20 kHz: about 191 W per switch.
- DAB with zero-voltage switching, where only turn-off loss remains: about 52 W per switch.
Soft switching cuts DAB switching loss by roughly three quarters in this example, which is why EVT must map the ZVS boundary carefully. A design that loses ZVS at light load or with an unbalanced DC bus will run hotter than its thermal design assumed.
Worked example 10 — cooling requirement
- Total loss at rated output: 66.2 kW.
- Water-glycol coolant (cp ≈ 3.6 kJ/kg·K, density ≈ 1,040 kg/m³) with a 10 K temperature rise.
- Mass flow = 66,200 / (3,600 × 10) = 1.84 kg/s, about 106 L/min (28 gpm).
- For a single 600 W module with junction limit 150 °C minus a 25 K reliability margin and 50 °C coolant, the junction-to-coolant thermal resistance must be no more than (125 − 50) / 600 = 0.125 K/W.

Cooling is a facility interface. For data centers the SST may share a liquid cooling loop with IT equipment or require its own dry cooler; either way, its cooling availability becomes part of the power train's availability.
Keentel Study Spotlight — efficiency and loss verification. Keentel defines an efficiency test protocol for EVT and factory testing: measurement points, instrument accuracy, power analyzer bandwidth for high-frequency content, auxiliary power accounting and the load points that matter for the owner's expected load profile. We then convert measured efficiency maps into annual energy and cooling loads.
How Keentel Engineering helps here. We make sure efficiency numbers in proposals are comparable: same boundary (MV terminals to DC bus), same auxiliary loads included, same ambient and coolant temperatures, and same load points.
8. Grid-side behavior: harmonics, power factor, ride-through and stability
To the utility, an SST is a power-electronic load (or a bidirectional resource when batteries or vehicle-to-grid are involved). Its grid-side behavior must be specified and tested like any large inverter-based facility.
| Topic | What to specify and test | Reference documents |
|---|---|---|
| Harmonic current emission | Current distortion at the point of common coupling (PCC), interharmonics and high-frequency emission from PWM | IEEE 519-2022 |
| Power factor and reactive power | Unity power factor at rated load, reactive capability if requested, behavior at light load | Utility interconnection requirements |
| Voltage and frequency ride-through | Behavior during sags, swells and frequency excursions; whether the unit stays connected and how fast it recovers | Utility large-load requirements; IEEE 1547-2018 where the SST interfaces distributed energy resources; IEEE 2800-2022 for transmission-connected IBR plants |
| Control interaction | Stability across the range of source impedance, interaction with nearby inverters and capacitor banks | EMT studies |
| Load steps | Response to AI training load swings and EV charging sessions | Site-specific study |
Large data center loads have become a reliability topic in their own right. NERC has reviewed events in which large voltage-sensitive loads disconnected during transmission faults, and grid operators are adding ride-through requirements for large electronic loads. An SST front end can either help (by riding through and limiting current) or hurt (by tripping on a brief sag and dropping hundreds of megawatts at once). That behavior is set in firmware and must be tested at EVT with a programmable grid simulator.
Keentel Study Spotlight — EMT interconnection study for SST-fed loads. Keentel builds PSCAD models of the SST front end at the level of detail the utility requires, validates them against EVT test records, and studies harmonic resonance, weak-grid control stability, fault ride-through and load-step behavior at the point of interconnection.
How Keentel Engineering helps here. We prepare the technical package the utility needs to approve a large SST-fed load: load characteristics, harmonic study, ride-through settings and models suitable for the utility's planning tools. See also Keentel's guides on joint large-load and generation studies and on 800 VDC data center architectures.
9. Protection: when fault current is limited
A 60 Hz transformer is a dumb but generous source: for a secondary fault it delivers current limited only by its impedance. An SST is a smart but stingy source: its semiconductors cannot survive more than about 1.5 to 2 times rated current for more than microseconds to milliseconds, so the controls limit current or block the converter.
Worked example 11 — fault current comparison and upstream coordination
| TPL-001 event | Example relevant to a load–generation pair | What to check |
|---|---|---|
| P1 single contingency | Loss of the co-located generator, the load's supply transformer or one 345 kV line | Thermal and voltage limits with the load still connected |
| P2 single event (bus section, breaker internal fault) | Loss of a substation bus section carrying both projects | Whether one event removes the generator but not the load |
| P3 generator out, followed by a P1 event | Paired generator on outage, then a line trips | The "generator out" design case for the load |
| P4 stuck breaker | Breaker failure at the shared POI | Whether the scheme separates load and generation unevenly |
| P5 protection system failure | Delayed clearing near a large power-electronic load | Load ride-through and stability |
| P6 two overlapping single contingencies | Line out for maintenance, then the generator trips | Whether curtailment schemes are needed |
| P7 common structure | Double-circuit tower carrying both projects' supply lines | Whether both supplies can be lost at once |
The consequences are significant:
- Upstream relays see almost nothing. With fault current only 1.2 times the 51 pickup, a feeder relay would take a long time to operate, if at all. The SST's own protection must clear its internal and downstream faults, and the upstream relay becomes backup for failures of that protection, such as a shorted input cell.
- Downstream DC protection must work with limited current. DC breakers, fuses or solid-state protection devices on the 800 V bus must operate reliably with the current the SST and any local storage can deliver. Keentel's guide on 800 VDC rack fault protection treats this in detail.
- Arc flash changes. Lower available fault current usually lowers incident energy at downstream equipment, but longer clearing times can offset that. DC arc-flash analysis under NFPA 70E methods is required for the 800 V bus.
- Internal MV faults still need fast clearing. A failed cell or an insulation breakdown inside the SST is a fault on the MV system and must be cleared by the upstream breaker or fuse at full system fault current.
Keentel Study Spotlight — protection philosophy and coordination study. Keentel writes the protection philosophy for SST installations: which device clears which fault, what the SST's internal protection must do and how fast, how upstream relays are set to remain secure and still back up the SST, and how DC-side protection coordinates. We then perform short-circuit, coordination and arc-flash studies (IEEE 1584 for AC and DC methods recognized in NFPA 70E for the DC bus).
How Keentel Engineering helps here. We test the protection philosophy against EVT results: measured current limits, blocking times, internal fault behavior and pre-charge sequences become the inputs to the coordination study, not vendor brochure values.
10. Surges, BIL and arrester coordination
Distribution equipment must survive lightning and switching surges. IEEE C57.12.01 assigns basic lightning impulse insulation levels (BIL) to dry-type transformers by voltage class; for many 15 kV-class distribution applications, 95 kV BIL is a common value, with higher values (110 kV and above) specified for exposed locations. A power-electronic SST has no inherent impulse strength in its semiconductors; it relies on the insulation of its MFT, bus work and enclosures, plus surge protection at its terminals.
Worked example 12 — arrester protective margin and separation distance
- Equipment BIL: 95 kV.
- Arrester discharge voltage at 10 kA, illustrative for a 13.8 kV system: 36 kV.
- Protective margin with the arrester directly at the terminals: 95/36 − 1 = 164%.
- Arrester 3 m from the terminals, incoming front 1,000 kV/µs, wave velocity 300 m/µs: voltage at the equipment ≈ 36 + 2 × 3 × 1,000 / 300 = 56 kV, margin 70%.
- Arrester 10 m away: ≈ 102.7 kV, which exceeds the 95 kV BIL (margin −7%). Raising the BIL to 110 kV restores only a 7% margin.
IEEE C62.22 practice calls for protective margins of at least about 20% for lightning. The example shows why SST installations should mount arresters at the SST terminals and why EVT and DVT should include impulse testing of the MV insulation system, not only the semiconductors.
Keentel Study Spotlight — insulation coordination study. Keentel performs insulation coordination for SST installations: arrester selection and placement, temporary overvoltage capability under the site grounding method, switching surges from upstream capacitor banks and the coordination of SST internal surge protection with facility arresters.
How Keentel Engineering helps here. Keentel's guide to temporary and transient overvoltages explains the underlying methods; for SSTs we add the converter-specific checks such as surge transfer through the MFT capacitance to the 800 V bus.
11. Reliability, redundancy and maintainability
An SST trades one very reliable passive component for many active ones. Reliability engineering must show that the system meets its availability target despite that.
Worked example 13 — cell failure rate and N + 1 redundancy
- Assumed cell failure rate including capacitors, gate drivers, sensors and auxiliary supply: 500 FIT (500 failures per 10⁹ hours; illustrative).
- Probability that a given cell fails within one year: 1 − e^(−500×10⁻⁹×8,760) = 0.437%.
- Without redundancy (7 cells per phase, all required): one-year system reliability 0.912, so an 8.8% chance per year of a forced outage; mean time between failures of about 10.9 years.
- With N + 1 (8 cells per phase, 7 required), no repair: one-year reliability 0.99842, an outage probability of about 0.16% per year.
- With N + 1 and 72-hour repair of the first failed cell, the system outage rate falls to about 2.7 × 10⁻⁵ per year, effectively governed by common-mode failures (control, cooling, auxiliary power) rather than cells.

The calculation shows why redundancy is essential and why it is not enough by itself. When cell redundancy is good, the controller, cooling pumps and fans, auxiliary power supplies, fiber links and firmware dominate unavailability. A credible reliability case must model those common-mode elements too, and EVT must prove that a failed cell actually bypasses safely under load.
| Failure mode | Typical mitigation | What EVT should prove |
|---|---|---|
| Semiconductor short | Gate-driver desaturation protection, cell bypass switch | Bypass operates within the specified time under full load and fault |
| DC capacitor wear | Film capacitors, thermal margin, monitoring | Capacitor temperature and ripple current at worst-case operating points |
| Gate driver or auxiliary supply failure | Redundant supplies, isolated power with adequate insulation | Behavior on loss of a supply; safe blocking |
| Fiber or communication loss | Watchdogs, redundant links | Safe state and recovery |
| Cooling failure | Redundant pumps and fans, derating logic | Derate and alarm before thermal trip |
| Firmware fault | Version control, independent protection layer | Protection functions independent of the main control processor |
Keentel Study Spotlight — reliability and availability model. Keentel builds reliability block diagrams and availability models for SST installations, including cells, controls, cooling, auxiliary power and the upstream and downstream electrical system, and compares SST-based designs with conventional transformer-plus-rectifier designs on the owner's availability target.
How Keentel Engineering helps here. For data centers, we tie the SST availability model to the facility's tier and redundancy design (see Keentel's guide to data center tiers), so the SST does not become the single point of failure in an otherwise concurrently maintainable design.
12. Standards, codes, listing and the approval path
The standards landscape for SSTs is the single most common source of late project surprises. A 60 Hz distribution transformer has a mature family of IEEE C57 standards, decades of UL listing practice and well-understood NEC treatment. An MV SST touches several families at once and fits none of them perfectly.
| Area | Relevant documents (US first) | How they apply to an SST |
|---|---|---|
| Transformer ratings and tests | IEEE C57.12.00 (liquid-immersed), IEEE C57.12.01 (dry-type), IEEE C57.12.91 (dry-type test code) | Useful for the MFT and for BIL and dielectric test philosophy, but written for 60 Hz transformers; they do not address high-frequency, PWM-stressed insulation |
| Harmonics | IEEE 519-2022 | Applies at the PCC for current emission limits |
| Surge protection | IEEE C62.11 (arresters), IEEE C62.22 (arrester application), IEEE C62.41 and C62.45 (LV surge environment and testing) | Arrester selection on the MV side; surge environment for LV and DC ports |
| Interconnection of resources | IEEE 1547-2018 with 1547a-2020 (distribution), IEEE 2800-2022 (transmission-connected IBR plants) | Apply when the SST interfaces generation or storage; for pure loads, utility large-load requirements govern |
| Grid-tied converter safety | UL 1741 | Common listing path for grid-interactive inverters and converters at low voltage; MV coverage is limited |
| MV power-electronic safety | IEC 62477-2 (international, 1 kV to 36 kV AC) and IEC 61800-5-1 for drives | Often used as the engineering basis for MV converter insulation and safety where US standards are silent |
| Partial discharge measurement | IEC 60270 (international) | Measurement method for PD tests at EVT and DVT |
| Installation | NFPA 70 (NEC): Article 450 (transformers), power conversion equipment provisions, Articles 480, 705 and 706 where storage and interconnected sources are involved, Article 110 (approval and listing) | The AHJ decides how the SST is classified and what listing or field evaluation is required |
| Utility installations | NESC (ANSI C2) | Governs utility-owned installations outside the NEC's scope |
| Worker safety | NFPA 70E, IEEE 1584 | Arc-flash and shock protection, including DC arc-flash methods for the 800 V bus |
| Seismic (substation use) | IEEE 693 | Qualification for substation-installed equipment in seismic regions |
| Emerging SST guidance | IEEE standards activity on solid-state transformers | An active IEEE project related to SST practice appears in IEEE's listings; confirm its title and scope before citing it in a specification |
Three practical points follow.
Classification under the NEC is an AHJ decision. An SST may be presented as power conversion equipment rather than as a transformer. That affects listing requirements, working clearances, overcurrent protection rules and labeling. Early meetings with the AHJ, and a written classification memo, prevent late redesign.
Listing at medium voltage is limited. Many first installations rely on field evaluation by a nationally recognized testing laboratory, or on utility ownership under the NESC, rather than on a full product listing. The EVT and DVT test plans should be designed to generate evidence that a field evaluator can use.
International documents fill gaps but do not replace US approval. Citing IEC 62477-2 or IEC 60270 for the engineering basis is sound practice, but the US AHJ and the utility still decide acceptance. Keentel recommends stating the basis explicitly: "insulation coordination per IEC 62477-2 methodology, impulse withstand per IEEE C57.12.01 BIL tables, PD measurement per IEC 60270."
Keentel Study Spotlight — standards and approval roadmap. Keentel prepares a standards matrix and approval roadmap for each SST project: which documents apply to which component, what the AHJ and the utility will require, which tests generate the evidence, and when in the EVT/DVT sequence each test must happen.
How Keentel Engineering helps here. As a licensed engineering firm and general contractor, Keentel understands the permitting side as well as the technical side, and we have worked with AHJs and utilities on interconnection and approval of new power-electronic equipment.
13. Applications: where SSTs make sense first
AI data centers and 800 VDC
AI racks now consume hundreds of kilowatts each, and the industry has been moving toward 800 VDC distribution to reduce copper, conversion steps and current. In a conventional design, a 13.8 kV or 34.5 kV service feeds 60 Hz transformers, then low-voltage switchgear, then rectifiers or power shelves that create the DC bus. An SST that converts medium voltage directly to 800 VDC removes the low-voltage AC stage, saves floor space and allows the facility to add capacity in modular blocks. Keentel's guides on 800 VDC data center UPS, 800 VDC versus 1,500 VDC, LVDC frameworks, 800 VDC rack fault protection and gigawatt-scale campuses cover the facility side of this architecture.
EV charging hubs
Truck depots and highway charging hubs now plan for multi-megawatt loads. MV-connected chargers built on SST principles can reduce the footprint of the service transformer and rectifier lineup and give the operator fine control over power. Research by US national laboratories has examined EV charging stations operated with MV SSTs.
Solar, storage and DC collection
PV and battery systems already produce DC. SST-based converters can, in principle, connect DC collection systems to medium voltage with fewer stages, and enable MVDC collection grids. This application is earlier in maturity than data centers and charging.
Utility distribution nodes
The original FREEDM vision placed SSTs on distribution feeders as controllable nodes that regulate voltage, manage DER and provide DC ports. Utility pilots continue, but the cost and reliability bar for replacing pole-top and pad-mounted transformers at scale is high.
Traction and marine
Rail traction and ships, where weight and volume matter most, were among the first commercial adopters of medium-frequency isolation in power electronic traction transformers.
| Application | Main driver | Maturity (Keentel assessment, 2026) | Key risk to manage |
|---|---|---|---|
| AI data centers, 800 VDC | Space, DC architecture, speed of deployment | Pilots and first commercial deployments | Reliability evidence, DC protection, listing |
| EV charging hubs | Footprint, power control | Pilots and early products | Utility interconnection, harmonics, cost |
| PV and BESS DC collection | Fewer conversion stages | Research and demonstration | Standards, bankability |
| Utility distribution nodes | Voltage control, DER integration | Pilots | Cost, surge exposure, maintenance model |
| Traction and marine | Weight and volume | Established in niches | Application-specific |
How Keentel Engineering helps here. Keentel's role differs by application: owner's engineer and interconnection lead for data centers and charging hubs, protection and planning engineer for utility pilots, and system integrator and studies provider for PV and storage projects.
14. Economics and supply chain
SST costs per kVA in 2026 remain higher than conventional transformer-plus-rectifier solutions in most published comparisons, though they are falling as SiC volumes rise. The economic case therefore usually depends on value beyond first cost.
Worked example 14 — first cost versus loss savings (illustrative)
| Item | 60 Hz transformer + LV rectifier | SST |
|---|---|---|
| First cost (illustrative) | $55/kVA transformer + $90/kW rectifier = $362,500 for 2.5 MW | $220/kVA = $550,000 |
| First-cost gap | $187,500 | |
| Annual loss saving from worked example 8 | about $9,000 | |
| Present value of 20 years of loss savings at 7% | about $95,000 |
On losses alone, the illustrative SST does not pay back its first-cost premium. The investment case must come from:
- Space and speed: removing low-voltage switchgear and rectifier rows can free white space or allow more IT capacity per building, and modular SSTs may be easier to procure than large transformers during supply shortages.
- Controllability: power factor control, current limiting, load flexibility and detailed metering can support interconnection approval and grid services.
- Architecture: a native 800 VDC bus integrates batteries, supercapacitors and on-site generation more simply.
- Avoided equipment: in some designs, the SST takes over functions of other power-train equipment.
All cost values above are illustrative; owners should use project-specific quotations.
Supply-chain pressure on conventional transformers has also driven public research funding. The US Department of Energy announced funding for flexible and innovative transformer technologies, and ARPA-E has funded wide-bandgap converter and modular SST research, including a 2026 award for a 13 kV-class silicon carbide grid SST reported in trade press.
Keentel Study Spotlight — technology and lifecycle cost comparison. Keentel compares SST and conventional power trains on first cost, losses, space, schedule, availability, maintenance and end-of-life, using the owner's financial assumptions and vendor quotations under a common scope boundary.
How Keentel Engineering helps here. We give investment committees a balanced answer: where SSTs win, where they do not yet, and which risks the EVT and DVT evidence has retired.
15. What EVT means: the hardware development gates
Hardware companies describe product development as a series of builds, each followed by a validation stage with a formal gate review. The terms are used widely in consumer electronics, automotive and industrial hardware, and they map well to power-electronic products such as SSTs.
| Stage | Purpose | Typical hardware | Entry criteria | Exit criteria |
|---|---|---|---|---|
| Concept and design | Define requirements, select architecture, simulate | Breadboards, single-cell prototypes, simulation models | Approved product requirements | Design review passed; schematics, layouts and magnetics designs released for EVT build |
| EVT – Engineering Validation Test | Prove the engineering design meets its specification | First complete prototypes, often hand-built, with engineering-grade parts | Released EVT design; EVT test plan approved | All critical requirements demonstrated with test evidence, or open issues with agreed fixes; design changes identified for DVT |
| DVT – Design Validation Test | Prove the final design is robust and certifiable | Production-intent design and parts, built with production-like processes | EVT exit met; design changes implemented | Certification and type tests passed, environmental and reliability tests complete, design frozen |
| PVT – Production Validation Test | Prove the factory can build it consistently | Units from the production line | DVT exit met; production processes and tooling ready | Yield, end-of-line test coverage and process capability demonstrated |
| MP – Mass production | Ship product | Production units | PVT exit met | Ongoing quality monitoring, field data and reliability growth |
"SST design through EVT" therefore means the engineering team owns the product from requirements, architecture and detailed design through the first complete prototype builds and their validation. The output of that phase is not a shippable product; it is evidence that the design works, plus a list of design changes for DVT.

"SST design through EVT" Figure 3. Keentel illustrative hardware development gates for a solid-state transformer. "Design through EVT" covers the concept-and-design and EVT blocks; each gate closes with a formal review against written exit criteria.
For MV power electronics, EVT carries more weight than in many consumer products, because the most dangerous and expensive failure modes (insulation breakdown, thermal runaway, protection failure, grid interaction) can only be found on real hardware at real voltage.
How Keentel Engineering helps here. Owners and investors often hear that a product is "in EVT" without knowing what that implies. Keentel translates development status into risk: what has been proven, what has not, and what that means for a project schedule that depends on the product.
16. The EVT test program for an SST
A credible EVT program for an MV SST covers the following test groups. The list is Keentel's recommended baseline; each developer will tailor it.
| Test group | Purpose | Examples of acceptance criteria |
|---|---|---|
| Device characterization (double-pulse tests) | Measure switching energies, overshoot and ringing in the actual layout | Overshoot within device rating with margin; switching energies within the loss budget |
| Functional and control tests | Start-up, pre-charge, shutdown, mode transitions, cell balancing | All sequences complete without trips; cell voltages balanced within specification |
| Controller hardware-in-the-loop (HIL) | Test the real controller against a real-time simulated plant and grid, including faults that are dangerous to stage on hardware | Stable response across source impedance range; correct protective actions |
| Efficiency map | Measure losses across load, voltage and temperature | Efficiency at specified load points meets the guarantee basis |
| Thermal tests | Heat runs at rated and overload conditions; hot-spot mapping of MFT, devices and capacitors | Temperatures within limits with margin; derating logic works |
| Insulation tests | Applied voltage (hipot), impulse where applicable, PD inception and extinction | No breakdown; PD below threshold at specified test voltage; margin to recurring peak voltage |
| Protection and fault tests | Output short circuits, input faults, cell failure and bypass, loss of cooling, loss of auxiliary power | Faults cleared within specified times; safe states reached; no collateral damage |
| Grid interaction | Harmonics, ride-through, unbalance, frequency excursions using a grid simulator | Emission within IEEE 519 targets at the specified PCC; ride-through per project requirements |
| EMI pre-compliance | Conducted and radiated emissions pre-scan against the intended certification limits (for example FCC Part 15 Class A or CISPR 11) | Margin to limits identified; mitigation plan for DVT |
| Mechanical and acoustic | Vibration of the MFT, acoustic noise, enclosure integrity | Within specification; no resonances near operating frequencies |
| Safety and discharge | Stored-energy discharge times, interlocks, grounding | Discharge to safe voltage within the specified time |
Worked example 15 — sizing the EVT test campaign
Keentel's baseline matrix for a 2.5 MVA SST contains 75 test cases across the groups above (12 functional and control, 6 efficiency, 5 thermal, 8 insulation, 4 EMI, 10 fault and protection, 15 HIL, 4 double-pulse, 8 grid interaction and 3 mechanical and acoustic). At an average of 0.75 test-days per case on one test stream, that is about 56 test-days. With two parallel test streams (for example HIL and power testing running at the same time), the campaign takes about 5.6 weeks of test execution, before allowing for fixes, retests and holidays. In practice, EVT for an MV SST typically spans several months once build, debug, fixes and retests are included.
The arithmetic matters for owners because a site schedule that assumes "EVT complete next month" for a product that has not yet started high-voltage testing is almost certainly optimistic.
Keentel Study Spotlight — EVT test plan review and witness testing. Keentel reviews the developer's EVT test plan against the owner's specification, the utility's requirements and the expected approval path, adds missing tests (typically grid interaction, surge and protection cases), and witnesses key tests on the owner's behalf. Witness reports record test conditions, instrument calibration, results and deviations, so they can support interconnection filings and AHJ acceptance later.
How Keentel Engineering helps here. Our witness engineers know which data the protection engineer, the planning engineer and the AHJ will later need. We make sure it is captured at EVT, when it is cheapest to collect.
17. Design reviews, FMEA and requirements traceability
Testing finds problems; design discipline prevents them. Mature hardware teams wrap EVT in a set of engineering controls.
- Requirements traceability. Every requirement (from the owner's specification, the utility, the code and internal design rules) is linked to a design element and to a verification method and test case. At EVT exit, the traceability matrix shows which requirements are verified, which are partially verified and which are open.
- The V-model. Requirements flow down to system, subsystem and component design on the left side of the "V"; verification flows back up from component tests through subsystem and system tests on the right. EVT sits mostly on the system-verification side.
- Design FMEA (DFMEA). Each failure mode is rated for severity, occurrence and detection, and actions are assigned. For SSTs, high-severity items typically include insulation failure in the MFT, loss of cell bypass, loss of cooling, protection firmware faults and control instability.
- Process FMEA (PFMEA). Started during EVT and closed in PVT; covers manufacturing steps such as MFT winding, potting or impregnation, torque on bus connections and fiber routing.
- Formal gate reviews. A cross-functional review at the end of each stage, chaired by someone outside the immediate design team, compares evidence to exit criteria.
Keentel Study Spotlight — independent design review. For owners, lenders and developers, Keentel performs independent design reviews at the EVT gate: requirement coverage, DFMEA quality, test evidence and open issues. Our report states plainly whether the evidence supports moving to DVT and what conditions should attach.
How Keentel Engineering helps here. We bring field and utility experience into the DFMEA: failure modes that occur on real distribution systems (ferroresonance, capacitor switching transients, single-phasing, voltage unbalance) are often missing from laboratory-driven analyses.
18. What EVT must set up for DVT and PVT
EVT does not end with a pass or fail. It ends with a design package and a plan.
| EVT output | Why it matters for DVT and PVT |
|---|---|
| Design change list with root causes | Prevents repeating failures in production-intent hardware |
| Updated simulation and EMT models validated against EVT data | Needed for utility studies and for DVT test prediction |
| Updated DFMEA and initial PFMEA | Drives DVT test emphasis and factory process controls |
| Certification and listing plan | Ensures DVT tests generate the evidence a certifier or field evaluator needs |
| Reliability test plan (HALT, accelerated life) | Defines what DVT must prove about lifetime |
| Factory test specification draft | Becomes the end-of-line test in PVT and the factory acceptance test for owners |
| Field installation and commissioning requirements | Inputs to owners' site design and to the site acceptance test |
DVT for SSTs typically includes certification type tests, environmental testing (temperature, humidity, altitude, salt fog where relevant), highly accelerated life testing (HALT), seismic qualification for substation applications and full EMC compliance. PVT proves yield and end-of-line test coverage. Many owners will deploy their first SSTs as pilots during or soon after DVT; that is where an owner's engineer is most valuable.
How Keentel Engineering helps here. Keentel converts EVT outputs into project documents: site specifications, factory acceptance test and site acceptance test procedures, commissioning plans and interconnection models.
19. The owner's view: specifying, buying and commissioning an SST
Owners rarely need to know how to design an SST. They do need to specify one clearly, judge the evidence and install it safely.
What a good SST specification contains
- Ratings and boundaries: input voltage and grounding, BIL, output voltage (AC or DC) and tolerance, continuous and short-time overload, efficiency at defined load points with auxiliaries included, cooling interface and ambient conditions, altitude.
- Grid behavior: harmonic emission targets at the PCC, power factor and reactive capability, ride-through requirements, ramp rates, behavior during utility faults and reclosing.
- Protection and safety: current limits and timing, internal fault clearing, coordination interfaces with upstream and downstream devices, stored-energy discharge, arc-flash ratings.
- Reliability and maintainability: redundancy, availability target, mean time to repair, spares strategy, firmware update process and cybersecurity.
- Evidence: EVT and DVT test reports required at bid or before delivery, witness rights, model deliverables (RMS and EMT) and factory acceptance test scope.
- Approvals: the listing or field evaluation path and the documentation the AHJ and utility will receive.
Commissioning differences from a 60 Hz transformer
- Pre-charge and energization sequences replace inrush concerns.
- Firmware versions and settings become controlled documents, like relay settings.
- Protection testing includes the SST's internal protection, not only upstream relays.
- Power quality measurements at the PCC become part of acceptance.
- Cooling system commissioning is critical-path.
Keentel Study Spotlight — SST specification and procurement support. Keentel writes technical specifications for SST procurements, evaluates bids on a normalized basis, negotiates evidence and witness rights, and prepares factory and site acceptance test procedures.
How Keentel Engineering helps here. Keentel serves as owner's engineer from feasibility through commissioning, with interconnection, protection, arc-flash and power quality studies in the same team, so nothing falls between the specification and the site.
20. The ten most common mistakes in SST projects
1. Comparing efficiencies with different boundaries, such as excluding auxiliary power or cooling.
2. Assuming upstream relays will clear downstream faults when fault current is limited to 1.5 per unit.
3. Mounting arresters far from the SST terminals, leaving negative impulse margin.
4. Ignoring the site grounding method when designing MFT insulation and PD margins.
5. Testing grid behavior only on a stiff laboratory source.
6. Treating firmware as part of the product rather than as controlled settings, so field versions drift from tested versions.
7. Leaving the listing and AHJ path until installation, which can delay energization by months.
8. Assuming N + 1 cells guarantee availability while ignoring single points of failure in controls and cooling.
9. Not validating EMT models against EVT data before using them in interconnection studies.
10. Planning site schedules on optimistic EVT and DVT completion dates.
21. Keentel's SST readiness checklist
| Area | Question to answer before committing a site | Evidence |
|---|---|---|
| Architecture | Does the topology suit the load (AC, DC, bidirectional)? | Architecture description, single-line diagram |
| Ratings | Are voltage, BIL, overload and ambient ratings adequate for the site? | Rating plate data, design basis |
| Insulation | Is PD margin demonstrated after thermal cycling on more than one unit? | EVT insulation test reports |
| Efficiency | Is efficiency measured across load with auxiliaries included? | Efficiency map |
| Thermal | Are hot spots within limits at overload and maximum ambient? | Heat-run reports |
| Protection | Are current limits, blocking times and internal fault behavior measured? | Fault test reports |
| Grid behavior | Are harmonics and ride-through tested with realistic source impedance? | Grid simulator reports |
| Surge | Is impulse withstand demonstrated and arrester coordination designed? | Impulse tests, insulation coordination study |
| Reliability | Is there an availability model including common-mode failures? | Reliability analysis |
| Models | Are RMS and EMT models validated against test data? | Model validation report |
| Approvals | Is the listing or field-evaluation path agreed with the AHJ? | AHJ correspondence |
| Interconnection | Has the utility accepted the load characteristics and studies? | Interconnection study and agreement |
| Operations | Are firmware control, spares and maintenance procedures in place? | O&M manual, spares list |
How Keentel Engineering helps here. Keentel uses this checklist in owner's-engineer engagements and adapts it to each project; it becomes a living document from feasibility through commissioning.
22. Scaling to 34.5 kV and cybersecurity
Two further topics come up in almost every SST project review.
Higher input voltages. Many data center campuses and charging hubs take service at 34.5 kV rather than 13.8 kV. At 34.5 kV the peak line-to-neutral voltage is about 28.2 kV, and with the same 1,980 V cells and 10% overvoltage allowance the front end needs 16 cells per phase before redundancy. Higher-voltage SiC devices (10 kV and 15 kV parts demonstrated in research) would reduce that count, but they are not yet available with the field history most owners require. Until they are, 34.5 kV SSTs either use many series cells or take power from a 34.5 kV to 13.8 kV step-down transformer, which removes part of the space advantage. Insulation coordination also becomes harder: 34.5 kV-class equipment commonly carries BILs of 150 kV or more, and the MFT insulation must be sized accordingly.
Cybersecurity and firmware. An SST is a networked, software-defined power device. Its firmware sets current limits, ride-through behavior and protection. Owners should require secure boot, signed firmware, role-based access, logging and a controlled update process, and should treat firmware versions and settings files with the same configuration control as protective relay settings. Where the SST is part of a bulk electric system facility, NERC CIP requirements may apply to the systems that control it.
How Keentel Engineering helps here. Keentel includes firmware and settings control in commissioning and operations documents, and coordinates with the owner's NERC compliance program where applicable (see Keentel's NERC compliance services guide).
23. EMT models: what EVT data must validate
Utilities and large-load interconnection processes increasingly ask for electromagnetic transient (EMT) models of power-electronic equipment, not only positive-sequence RMS models. For an SST, the EMT model must represent the front-end control (current loops, phase-locked loop or other synchronization, DC-link voltage control), current limits and protection actions, and enough of the switching behavior to reproduce harmonic emission and control interaction.
A model is only as good as its validation. EVT is the first chance to compare model and hardware. Keentel recommends a validation set that includes:
| Test | Model quantity compared | Typical acceptance approach |
|---|---|---|
| Load step up and down | Input current, DC-link voltage, recovery time | Waveform overlay with defined error bands |
| Voltage sag (several depths and durations) | Current response, ride-through or trip decision | Correct decision and response time within tolerance |
| Phase jump | PLL response, current transient | Peak current and settling within tolerance |
| Source impedance sweep | Damping of control modes | Same stability boundary in model and hardware |
| Harmonic background | Current distortion | Spectrum agreement at key orders |
| Output short circuit | Current limit, blocking time | Peak and duration within tolerance |
When model and hardware disagree, the cause is usually a control parameter, a filter value or a protection threshold that differs between the simulation and the firmware actually loaded. Firmware version control therefore applies to models as well: every EMT model should state the firmware version and settings file it represents.
Keentel Study Spotlight — EMT model validation. Keentel validates supplier EMT models against EVT and DVT records, documents the comparison, and delivers a model package (model, parameters, firmware reference, validation report) acceptable to transmission and distribution providers. We use the validated model in interconnection, harmonic resonance and ride-through studies for the site.
How Keentel Engineering helps here. Keentel's guides on PSCAD parameter fields, model validation and joint large-load studies describe the broader modeling practice that SST models must fit into.
24. The DC-side interface: grounding and protection of the 800 V bus
An SST that delivers 800 VDC creates a new DC distribution system with its own grounding and protection questions.
Grounding. The 800 V bus may be ungrounded with insulation monitoring, grounded at a midpoint (±400 V), or grounded at one pole. Each choice changes touch voltages, ground-fault detection and the behavior of DC arcs. The SST's isolation stage gives the designer freedom to choose, but the choice must be consistent across SSTs, batteries, rack power shelves and DC protective devices.
Protection devices. DC breakers, fuses and solid-state protection devices must interrupt DC without the natural current zero of AC. The current available from the SST is limited, but batteries or capacitors on the bus can supply very high current for short times. Coordination must consider both sources.
Arc flash. DC arc-flash methods recognized in NFPA 70E give incident energy estimates for the 800 V bus. Results depend strongly on the current the SST and any storage can supply and on how fast the protection clears.
Interaction with SST controls. The SST's current limit and its response to bus undervoltage determine whether downstream protection sees enough current to operate. EVT must test the SST with representative downstream protective devices, not only with a resistive short.
How Keentel Engineering helps here. Keentel's guide on 800 VDC rack fault protection covers DC-side protection in depth. For SST projects, we perform the combined AC and DC protection and arc-flash study, so the MV and DC sides are coordinated in one document.
25. One cell, start to finish: a design-through-EVT walk-through
To pull the guide together, here is how a single 104 kW cell of the 2.5 MVA example moves from requirement to EVT exit. The sequence is typical of what an SST engineering team owns when it is responsible for "design through EVT."
Step 1: requirements. The system specification (2.5 MVA, 13.8 kV, 800 VDC, 95 kV BIL, harmonic targets, ride-through, 50% short-time overload, availability target) is allocated to the cell: 1,980 V DC link, 104 kW rated and 156 kW peak through the DAB, insulation to the full MV potential, a failure-rate budget of 500 FIT and a bypass time requirement.
Step 2: architecture and simulation. The team selects a full-bridge front end and a DAB with a 20 kHz MFT, then simulates switching, losses and control. The DAB inductance of about 157 µH and a rated phase shift near 38° come out of this step (worked example 4). EMT simulations of the full SST check stability against the expected range of grid impedance.
Step 3: detailed design. Electrical schematics, gate drivers with desaturation protection, sensing, auxiliary power isolated to MV, the DC-link capacitor bank (about 705 µF), the MFT (area product near 579 cm⁴ before insulation allowances), the cold plate (0.125 K/W junction-to-coolant budget per module) and mechanical layout with creepage and clearance distances checked against the insulation basis.
Step 4: design reviews and DFMEA. A preliminary design review checks requirement coverage; the DFMEA ranks insulation breakdown, bypass failure and loss of cooling as the top risks; the EVT test plan is written to retire those risks first.
Step 5: single-cell bring-up. Before the full SST is assembled, one cell is tested on a DC source and load bank: double-pulse tests, ZVS mapping, efficiency, heat run and PD on the MFT. Problems found here are cheap to fix.
Step 6: full-system EVT build. Two or three complete SSTs are built. HIL testing of the controller runs in parallel with power testing. The test campaign of roughly 75 cases (worked example 15) proceeds from low-voltage functional tests to full-voltage, full-power and fault tests, then to grid-interaction tests on a grid simulator.
Step 7: EVT exit review. The team presents results against the requirement traceability matrix, the updated DFMEA, the design change list for DVT, validated models and the certification plan. An independent reviewer, sometimes the owner's engineer, confirms that the evidence supports moving to DVT, or sets conditions.
| Walk-through step | Main artifacts | Who should review |
|---|---|---|
| Requirements allocation | Cell specification, budgets | System architect, owner's engineer |
| Simulation | Loss model, control design, EMT model | Controls lead, Keentel for grid conditions |
| Detailed design | Schematics, MFT design, thermal design, layout | Design review board |
| DFMEA and test plan | Risk rankings, EVT plan | Cross-functional team, owner's engineer |
| Single-cell tests | Double-pulse, ZVS, PD, heat-run reports | Design team |
| Full-system EVT | Test reports, HIL logs, fault records | Test lead, witness engineer |
| EVT exit | Traceability matrix, change list, validated models | Gate review chair, independent reviewer |
How Keentel Engineering helps here. Keentel can join this sequence at any step. Owners most often bring us in at Step 4 (test plan review) and Step 7 (EVT exit review); developers often engage us at Step 2 to define the grid conditions their simulations and EVT must cover.
26. Questions owners and investors should ask at each gate
The development gates are also decision points for the people funding or buying the product. The questions below help non-specialists judge whether the evidence matches the claim.
| Gate | Questions to ask | Red flags |
|---|---|---|
| Concept and design | Which requirements are customer-driven and which are assumed? Which grid conditions were simulated? Is there a written insulation coordination basis? | No written requirements; simulations only on an ideal source; insulation basis "to be decided" |
| EVT entry | Is the EVT test plan approved and traced to requirements? Are witness points defined? How many complete units will be built? | Test plan written after testing starts; only one unit |
| EVT exit | Which critical requirements are verified with test evidence? What failed, and what is the root cause and fix? Are models validated? | Open high-severity DFMEA items without plans; "will verify in DVT" for insulation or protection |
| DVT entry | Are EVT changes implemented in production-intent hardware? Is the certification or field-evaluation plan agreed? | Major design changes planned during DVT |
| DVT exit | Are type tests passed? Are environmental and accelerated life results available? Is the design frozen? | Waivers on safety tests; reliability claims without test data |
| PVT exit | What is the yield and end-of-line test coverage? Are PFMEA actions closed? | Low yield explained as "learning curve" without data |
| First field deployment | Are site studies complete? Are firmware versions controlled? Is a spares and repair plan in place? | Firmware updated in the field without change control |
A useful rule of thumb: when a supplier says a requirement "will be verified in the next phase," ask what it would cost to fix if that verification fails. Insulation, protection and thermal requirements are expensive to fix late and should be verified at EVT.
How Keentel Engineering helps here. Keentel's independent gate reviews give owners, lenders and investment committees a written, evidence-based view of where a product stands, in language a non-specialist can act on.
Part C — Three Anonymous US Case Studies
The following case studies are composites drawn from typical project situations. Names, locations and some numbers have been changed or combined, and they are presented for illustration.
Case study 1 — An AI data center pilot: 13.8 kV to 800 VDC through EVT
The situation
A data center developer in the Southeast planned a 20 MW AI training hall designed around 800 VDC rack distribution. The developer's design team proposed a pilot using eight SSTs of about 2.5 MVA each, converting the site's 13.8 kV distribution directly to 800 VDC, in place of a conventional lineup of 60 Hz transformers, low-voltage switchgear and rectifier shelves. The SST supplier was a young company whose product was in EVT: two complete prototypes had been built, functional testing was underway, and high-voltage insulation and grid-interaction tests were scheduled.
The developer retained Keentel Engineering as owner's engineer for the pilot. The brief was simple: tell us whether this product can be in service in 14 months, and what we need to do to make that safe.
What Keentel did
Readiness review. Keentel started with a technology readiness review of the supplier's documentation: architecture, device ratings, insulation design basis, the EVT test plan and results to date. The architecture was a cascaded H-bridge front end with 3.3 kV SiC cells (seven plus one redundant per phase) and a dual active bridge per cell feeding a common 800 V bus. Keentel's own sizing check matched the supplier's cell count and DC-link design.
Gap analysis of the EVT plan. The supplier's EVT plan was strong on functional, efficiency and thermal testing, but thin in four areas that mattered for the site:
1. Grid interaction. All planned grid tests used the laboratory's stiff source. The site's 13.8 kV bus had a short-circuit ratio that varied widely with the utility's switching configuration, and the hall would run AI training loads that step by several megawatts in under a second.
2. Surge and impulse. The plan included applied-voltage and partial discharge tests but no impulse test of the MV insulation system.
3. Protection behavior. Output short-circuit tests were planned, but not tests of internal cell failure with bypass under load, and not tests of behavior during upstream utility reclosing.
4. Model validation. The supplier offered an average-value simulation model but no validated EMT model.
Keentel wrote a supplementary test specification covering grid-simulator tests across a range of source impedances, load-step tests matching the facility's expected AI training profile, impulse testing of the MV insulation system on a dedicated test sample, cell-failure and bypass tests at rated load, and a reclosing test sequence. The supplier accepted most of the additions in exchange for a schedule extension.
What EVT found
Three findings from the expanded EVT changed the project.
- Control interaction at low short-circuit ratio. At the weakest source impedance, the front-end current controller developed a lightly damped oscillation near 900 Hz during large load steps. The supplier retuned the controller and added active damping; Keentel verified the fix in a repeated test and in an EMT study of the site.
- PD margin after thermal cycling. Initial PD inception measurements met the design target with about 14% margin, as in worked example 6. After thermal cycling, one MFT sample showed inception about 9% lower, eroding most of the margin. Root cause was a void in an impregnation layer. The supplier changed its impregnation process before DVT, and Keentel added a PD test after heat run to the factory acceptance test.
- Bypass timing. Cell bypass under load worked, but the bypass time was longer than the protection philosophy assumed, causing a brief 800 V bus sag. The supplier modified the bypass sequence; Keentel updated the DC-side protection settings to ride through the residual sag.
Site engineering
In parallel, Keentel completed the site studies: a protection philosophy recognizing that upstream 13.8 kV relays would act only as backup for internal SST faults, a short-circuit and arc-flash study including DC arc-flash on the 800 V bus, an insulation coordination study with arresters mounted at each SST's MV terminals, and an IEEE 519 harmonic study at the point of common coupling using measured EVT emission data. The AHJ meeting produced a written agreement on field evaluation of the SSTs by a nationally recognized testing laboratory, with Keentel's witness reports and the DVT test results as supporting evidence.
Outcome
The pilot was energized 16 months after the readiness review, two months later than the developer's original target but without a single protection or insulation event in its first year. The developer later stated that the expanded EVT program was the reason the pilot succeeded, and used the same test specification as a bid requirement for the next phase.
Key numbers
| Item | Value |
|---|---|
| Hall load | 20 MW at 800 VDC |
| SSTs | 8 units of about 2.5 MVA, 13.8 kV input |
| Cells per SST | 24 (7 + 1 per phase, 3.3 kV SiC) |
| Supplementary EVT tests added by Keentel | 19 test cases |
| Control oscillation found | About 900 Hz at weakest source impedance |
| PD inception loss after thermal cycling (one sample) | About 9% |
| Schedule effect | Energized 16 months after readiness review (2 months later than target) |
Timeline
| Month | Activity |
|---|---|
| 0–1 | Readiness review and EVT gap analysis |
| 2–6 | Supplementary EVT tests, fixes and retests; site protection, arc-flash and harmonic studies |
| 7–9 | AHJ classification meeting; field-evaluation plan agreed |
| 9–13 | DVT on production-intent units; Keentel witness testing |
| 14–16 | Delivery, installation, factory and site acceptance testing, energization |
What owners can take away
The pilot shows that an SST in EVT can be deployed safely on a firm schedule if the owner shapes the EVT program rather than waiting for its results. The three findings that mattered most (control interaction on a weak source, PD margin after thermal cycling and bypass timing) were all outside the supplier's original plan. Each would have surfaced in the field as an outage, an insulation failure or a protection misoperation. The cost of the expanded EVT was a two-month delay and a modest share of test costs; the cost of a field failure in an AI training hall would have been far higher.
Lessons
- Laboratory EVT on a stiff source can hide control problems that appear on real feeders.
- PD margin must be measured after thermal cycling, not only on new units.
- Protection behavior during internal faults must be tested, not inferred.
- An owner's engineer adds most value when involved during EVT, not after delivery.
Case study 2 — A medium-voltage EV truck charging hub
The situation
A logistics company in the Midwest planned a depot for heavy electric trucks with four 1 MW chargers, expandable to eight. The local utility offered service at 12.47 kV. The conventional design required a 5 MVA pad-mounted transformer, 480 V switchgear and four charger power cabinets. An SST-based charger supplier proposed MV-connected units with integrated isolation, saving substantial space on a constrained urban lot.
The SST charger was past EVT and in early DVT. The utility had never connected MV power electronics of this kind on that feeder and was cautious. Keentel was engaged by the developer to lead the interconnection and protection engineering.
What Keentel did
Utility engagement. Keentel prepared a load characterization package for the utility: rated and overload demand, ramp rates, power factor behavior, harmonic emission measured during the supplier's EVT, ride-through behavior and fault current contribution. The utility's main concerns were harmonics, flicker from charging-session starts and stops, and protection coordination with its feeder recloser.
Harmonic and flicker study. Using measured EVT harmonic spectra and the utility's feeder model, Keentel performed an IEEE 519 study at the PCC. Total demand distortion was comfortably within limits, but one high-frequency band near the converter switching frequency interacted with a capacitor bank on the feeder. Keentel recommended a small filter adjustment, which the supplier implemented in DVT. Charging-session ramp rates were set to keep voltage fluctuation within the utility's flicker limits.
Protection coordination. The utility's feeder recloser was set for conventional transformers. Because the SST chargers limited fault current to about 1.3 per unit, the recloser could not see faults inside the depot. Keentel developed a coordination scheme in which the SST chargers' internal protection cleared depot-side faults, a set of MV fuses with suitable minimum-melt characteristics protected against internal MV faults in the chargers, and the recloser remained as backup. Keentel also documented the chargers' behavior during recloser operations so that the chargers would not attempt to restart into an open feeder.
Grounding and surge protection. The 12.47 kV feeder was a four-wire multigrounded system. Keentel checked that the chargers' MV insulation and arresters were coordinated for temporary overvoltages during feeder ground faults and specified arresters at each charger's MV terminals.
What testing found
During DVT, the supplier's grid-simulator test of a recloser sequence revealed that the chargers' restart logic attempted to resynchronize during the recloser's dead time, briefly drawing current from the DC link of a neighboring charger through the shared site bus. The supplier changed the restart logic to wait for a stable voltage for a defined period. Keentel added the recloser sequence to the site acceptance test.
Outcome
The depot was energized on a 12.47 kV service with a footprint about 40% smaller than the conventional design. The utility accepted the interconnection after reviewing Keentel's studies and the supplier's test reports, and has since used the package as a template for similar requests.
Key numbers
| Item | Value |
|---|---|
| Charging capacity | 4 × 1 MW, expandable to 8 × 1 MW |
| Service voltage | 12.47 kV, four-wire multigrounded |
| SST fault current limit | About 1.3 per unit |
| Footprint versus conventional design | About 40% smaller |
| Utility review time after complete package | About 10 weeks |
Timeline
| Month | Activity |
|---|---|
| 0–2 | Load characterization package and utility pre-application meetings |
| 2–4 | Harmonic, flicker and protection studies using measured EVT data |
| 4–6 | Filter adjustment and restart-logic change during DVT; Keentel witness of recloser test |
| 6–9 | Utility approval, construction, site acceptance testing |
What owners can take away
Medium-voltage charging hubs succeed when the developer treats the utility as a technical partner from the first meeting. Measured harmonic spectra, a written protection scheme and a clear description of restart behavior answered the utility's concerns before they became objections. The restart-logic finding also shows why recloser sequences belong in every SST test plan where the service is from an overhead feeder.
Lessons
- Utilities respond well to measured data; EVT and DVT test reports are interconnection assets.
- Limited fault current requires an explicit coordination scheme with the feeder recloser.
- Restart logic after utility reclosing is a commonly overlooked test case.
Case study 3 — A utility pilot on a 12.47 kV feeder
The situation
A utility in the South Central US planned a pilot of three SSTs on a 12.47 kV distribution feeder serving a mix of residential and small commercial customers with high rooftop solar penetration. The goal was to test voltage regulation, DER integration and DC ports for future storage. The units came from a research-to-commercial program and were in EVT when the utility committed to the pilot.
The utility engaged Keentel to review the units' readiness for field exposure and to perform the planning and protection studies.
What Keentel found in the EVT review
Keentel's review focused on the conditions a distribution feeder imposes that a laboratory does not:
- Lightning exposure. The feeder was overhead in an area with high lightning activity. The units' MV insulation had been tested with applied voltage and PD, but impulse testing had not been planned. Keentel's insulation coordination study (similar to worked example 12) showed that with arresters mounted at the pole-top and the SST pad-mounted 10 m away, the margin was negative for steep-front surges. Keentel recommended terminal-mounted arresters and an impulse test campaign.
- Harmonic background. The feeder's existing voltage distortion included elevated fifth and seventh harmonics from customer loads. The SST's control had been tuned on a clean source. Keentel requested EVT tests with a distorted background voltage; these revealed increased current distortion and a control-loop interaction, which the developer fixed.
- Single-phasing and unbalance. Feeder fuses could open one phase. Keentel added single-phasing tests to the EVT plan; the units initially tripped on DC-link imbalance and were modified to ride through for a defined time and then shut down safely.
Planning and protection studies
Keentel modeled the SSTs in the utility's distribution planning tool using parameters validated against EVT data, and studied voltage regulation, hosting capacity and protection. Because the SSTs limited fault current, existing fuse coordination downstream of each unit had to be replaced with electronically coordinated protection in the SSTs' low-voltage outputs, and the upstream fuses were sized for internal MV faults only.
Outcome
Impulse testing at EVT found a weak point in the bus support insulation that would likely have failed in the field. The developer redesigned it before DVT. The pilot entered service with terminal arresters and updated controls. In its first lightning season it experienced several nearby strikes without damage. The utility's evaluation highlighted the importance of field-condition testing at EVT and adopted Keentel's checklist for future pilots.
Key numbers
| Item | Value |
|---|---|
| Feeder | 12.47 kV overhead, high lightning activity, high rooftop PV penetration |
| Units | 3 pad-mounted SSTs |
| Arrester separation in original design | About 10 m (pole-top) |
| Margin with original arrangement | Negative for steep-front surges |
| Tests added to EVT | Impulse, distorted-background, single-phasing |
| Weak point found | Bus support insulation, redesigned before DVT |
Timeline
| Month | Activity |
|---|---|
| 0–2 | Readiness review; insulation coordination, harmonic and protection screening |
| 2–7 | Added EVT tests; redesign of bus supports and controls |
| 7–10 | DVT, planning model update, protection redesign for SST-fed customers |
| 10–12 | Installation with terminal arresters; commissioning |
What owners can take away
Utility pilots carry reputational risk out of proportion to their size: a pilot that fails in its first storm can set back a technology program for years. Here, three inexpensive EVT additions (impulse, distorted background and single-phasing tests) found a real weakness before field exposure. Utilities planning SST pilots should require field-condition testing as a condition of the pilot agreement, and should plan protection for SST-fed customers from the start.
Lessons
- Distribution feeders impose surge, harmonic and unbalance conditions that must be reproduced in EVT.
- Arrester placement is decisive for SST insulation coordination.
- Protection of SST-fed customers must be designed around limited fault current.
Part D — 30-Question Technical FAQ
1. What is a solid-state transformer in one sentence?
A solid-state transformer is a power-electronic converter system that takes power at one voltage and delivers it at another while providing galvanic isolation through a small medium-frequency transformer, instead of using a large 60 Hz iron-core transformer. Because the power flows through controlled switches, an SST can also regulate voltage, correct power factor, limit fault current and supply DC directly, functions a conventional transformer cannot provide.
2. What does "SST design through EVT" mean?
It means owning the SST product from requirements and architecture, through detailed electrical, magnetic, thermal and control design, to the build and testing of the first complete engineering prototypes in the Engineering Validation Test stage. The deliverable is not a production product; it is a working prototype with test evidence that the design meets its specification, plus a list of changes for the Design Validation Test stage.
3. What are EVT, DVT and PVT?
They are the standard hardware development gates. EVT (Engineering Validation Test) proves the engineering design works on first prototypes. DVT (Design Validation Test) proves that the final, production-intent design is robust and can pass certification, environmental and reliability tests. PVT (Production Validation Test) proves the factory can build the product consistently at volume. Mass production (MP) follows. Each gate closes with a formal review of evidence against written exit criteria.
4. Why do SSTs use a medium-frequency transformer?
Transformer core size scales roughly inversely with frequency. In Keentel's worked example, a 20 kHz transformer for a 104 kW cell needs about 1/75 of the area product of a 60 Hz design, or roughly 1/25 of the core volume. The trade-off is that high-frequency operation increases core and winding losses and stresses insulation with fast voltage edges, so the size benefit has to be earned through careful materials, winding and insulation design.
5. Why are SSTs built from many modules instead of one big converter?
Commercial silicon carbide devices are rated in the low kilovolts (for example 1.7 kV and 3.3 kV), while a 13.8 kV system has an 11.3 kV peak line-to-neutral voltage. Designers therefore connect many converter cells in series on the MV side and in parallel on the LV side. Modularity also enables redundancy (N + 1 cells) and simplifies manufacturing, but adds components and control complexity.
6. How many cells does a 13.8 kV SST need?
It depends on the device rating and voltage utilization. In Keentel's example, 3.3 kV SiC devices run at 60% utilization (1,980 V per cell) need 7 cells per phase to support the peak phase voltage with 10% overvoltage, or 8 with one redundant cell, for 24 cells in a three-phase unit. With 1.7 kV devices the requirement rises to 13 cells per phase before redundancy. At 34.5 kV, the same 3.3 kV cells would need 16 per phase.
7. What is a dual active bridge and why is it popular?
A dual active bridge is an isolated DC–DC converter with an active switching bridge on each side of a transformer. Power flow is controlled by the phase shift between the two bridges' square waves, and the series inductance (often the transformer's leakage) sets how much power flows per degree of phase shift. It is popular because it is bidirectional, uses the transformer leakage productively and can achieve zero-voltage switching over a useful operating range.
8. Are SSTs more efficient than conventional transformers?
Not in every comparison. A high-efficiency 60 Hz liquid-filled transformer serving an AC load is often more efficient than an SST that must produce AC. When the load needs DC, an SST that converts medium voltage directly to DC can match or beat a transformer followed by a rectifier, because it removes a conversion stage. In Keentel's illustrative example, the SST chain reached 97.4% versus 96.8% for the conventional chain, a saving of about 16 kW at 2.5 MW. Efficiency must be compared with identical boundaries and auxiliary loads.
9. What limits SST lifetime?
Insulation aging in the medium-frequency transformer and MV bus work, capacitor wear-out, semiconductor and gate-driver reliability, cooling system components (pumps and fans) and firmware quality. Partial discharge under high-frequency PWM stress is a key aging mechanism, which is why PD-free design and PD testing after thermal cycling are central to EVT and DVT.
10. How does an SST behave during a short circuit?
Its semiconductors cannot carry large overcurrents, so the controls limit output current to roughly 1 to 2 times rated, or block the converter. A 60 Hz transformer with 5.75% impedance can supply about 17 times rated current to a secondary fault. The SST's limited current reduces equipment duty and often arc-flash energy, but requires a new protection philosophy so that downstream faults are still cleared selectively and quickly.
11. Will my upstream utility relay or recloser still protect the SST?
It will protect against internal MV faults such as a shorted input cell or insulation failure, which draw full system fault current. It will generally not see downstream faults on the SST's output, because the SST limits the current it draws from the grid. In Keentel's example the SST's fault current was only 1.2 times the upstream relay pickup. The SST's internal protection must handle those faults, with upstream devices as backup.
12. What BIL should an SST have?
The BIL should be coordinated with the system voltage class and lightning exposure. IEEE C57.12.01 lists BIL values for dry-type transformers by class; many 15 kV-class distribution applications use 95 kV, with higher values specified for exposed sites. More important than the number is coordination: arresters must be mounted at the SST terminals. In Keentel's example, a 10 m arrester separation left the equipment exposed to surges above its BIL.
13. Which standards apply to SSTs in the US?
No single US standard covers MV SSTs comprehensively. Projects typically combine IEEE C57.12.00 and C57.12.01 for transformer-related ratings and dielectric philosophy, IEEE 519 for harmonics, IEEE C62 documents for surge protection, IEEE 1547 or IEEE 2800 where resources are interconnected, UL 1741 where applicable, NFPA 70 (NEC) and the NESC for installation, NFPA 70E and IEEE 1584 for worker safety, and international documents such as IEC 62477-2 and IEC 60270 for MV converter safety and partial discharge measurement. IEEE standards activity specific to SSTs is under way.
14. How will the AHJ classify an SST under the NEC?
It depends on the product and the AHJ. An SST may be treated as power conversion equipment rather than as a transformer under Article 450, which changes listing, clearance, overcurrent protection and labeling requirements. Because MV listing options are limited, many early installations rely on field evaluation by a nationally recognized testing laboratory. Owners should hold an early meeting with the AHJ and document the agreed classification.
15. What does a utility need from an SST-fed load?
Typically: rated and overload demand, ramp rates, power factor behavior, harmonic emission measured on real hardware, ride-through behavior during sags and frequency excursions, fault current contribution, behavior during reclosing, and simulation models suitable for the utility's planning tools, sometimes including EMT models. Measured EVT and DVT data make the utility's review much faster.
16. Do SSTs cause harmonics?
Well-designed SST front ends draw nearly sinusoidal current at unity power factor, so low-order harmonics are usually low. They do produce high-frequency emissions near their switching frequency and its multiples, which can interact with feeder capacitor banks or filters. IEEE 519-2022 limits apply at the point of common coupling, and EVT should measure emissions with a realistic source impedance and background distortion.
17. Can an SST provide grid support?
Yes, within its current rating. An SST front end can supply or absorb reactive power, regulate its input power factor, ride through disturbances and in some designs support voltage. When paired with storage on its DC bus, it can also provide active power services. Any such functions must be specified, tested at EVT and DVT, and coordinated with the utility.
18. How do SSTs fit 800 VDC AI data centers?
AI racks increasingly use 800 VDC distribution to reduce copper and conversion stages. An SST converting medium voltage directly to 800 VDC removes the low-voltage AC switchgear and rectifier stage, saves space and allows modular capacity growth. The DC bus then needs DC protection, DC arc-flash analysis and careful fault-current coordination, topics covered in Keentel's 800 VDC guides.
19. What is the 800 VDC current for a 2.5 MW SST?
About 3,047 A at 97.5% efficiency (2.5 MW × 0.975 / 800 V). At 1.5 per unit current limit the SST can supply roughly 4,570 A for a short time. These values drive busway sizing, DC protective device ratings and arc-flash calculations.
20. How much stored energy is in an SST, and why does it matter?
Each cell's DC-link capacitor stores energy. In Keentel's example, about 705 µF per cell at 1,980 V stores about 1.4 kJ, or roughly 33 kJ across 24 cells. Stored energy affects maintenance safety (discharge time and lockout procedures), fault energy into internal faults and pre-charge design. EVT must verify discharge times against the safety specification.
21. What is partial discharge, and how is it tested at EVT?
Partial discharge is a small electrical discharge in a void or at a surface that does not fully bridge the insulation but gradually erodes it. At EVT, engineers measure inception and extinction voltages using methods such as IEC 60270, typically requiring inception above a margin (for example 1.5 times) over the highest recurring peak voltage. Measurements should be repeated after thermal cycling and on several units, because manufacturing variation and aging can reduce margin.
22. What is hardware-in-the-loop testing and why is it essential for SSTs?
HIL testing runs the real SST controller against a real-time digital simulation of the power stage and grid. It lets engineers test thousands of scenarios, including faults and grid events that would be dangerous or destructive on real hardware, before and alongside power testing. For SSTs with dozens of cells, HIL is the most practical way to verify control and protection logic across the operating envelope.
23. What are double-pulse tests?
A double-pulse test switches a semiconductor twice in quick succession under controlled voltage and current to measure turn-on and turn-off energy, voltage overshoot and ringing in the actual power stage layout. Results feed the loss model, thermal design and gate-driver tuning. At EVT, double-pulse tests confirm that the real layout behaves as the design assumed.
24. How long does EVT take for an MV SST?
It varies with product complexity and the number of design iterations. In Keentel's illustrative campaign, 75 test cases at about 0.75 test-days each give roughly 56 test-days, or about 5.6 weeks with two parallel test streams, for execution alone. Build, debug, fixes and retests typically extend EVT to several months. Project schedules should not assume EVT completion until high-voltage, thermal and grid-interaction tests are done.
25. What should owners ask a supplier whose SST is "in EVT"?
Ask which tests are complete and which remain; whether insulation, PD and impulse tests have been done and on how many units; whether grid-interaction tests used realistic source impedance; how protection behaves for internal faults; what the DFMEA's top risks are; whether EMT models are validated against test data; what the listing path is; and what witness rights the owner will have in EVT and DVT.
26. How is SST reliability estimated?
By combining component failure rates (often in FIT) into a system model that reflects redundancy, repair time and common-mode elements such as controls, cooling and auxiliary power. In Keentel's illustrative example, N + 1 cell redundancy reduced the annual forced-outage probability from about 8.8% to about 0.16% without repair, and much further with repair, leaving common-mode failures dominant. Field data will ultimately replace these estimates.
27. Do SSTs need special cooling?
Most MV SSTs use forced air or liquid cooling. In Keentel's example, 66 kW of losses requires about 106 L/min of water-glycol at a 10 K rise. Cooling availability directly affects SST availability, so redundant pumps and fans, derating logic and integration with the facility's cooling system must be designed and tested.
28. Are SSTs cheaper than conventional transformers?
Not yet on first cost in most comparisons. In Keentel's illustrative example the SST cost about $187,500 more than a transformer plus rectifier for 2.5 MW, while its loss savings were worth only about $95,000 over 20 years. The investment case usually rests on space, speed of deployment, controllability, DC architecture and avoided equipment, and costs are falling as SiC volumes grow. Owners should use project-specific quotations.
29. Can SSTs be used at 34.5 kV?
Yes, but with more cells or higher-voltage devices, and with higher insulation requirements. At 34.5 kV, the same 3.3 kV cells used in Keentel's 13.8 kV example would need 16 per phase before redundancy, and 34.5 kV-class insulation commonly requires BIL of 150 kV or more. Some designs instead step 34.5 kV down to 13.8 kV with a conventional transformer before the SST.
30. How can Keentel Engineering help with an SST project?
Keentel acts as owner's engineer and studies provider for SST projects: technology readiness reviews, specifications and bid evaluation, EVT and DVT test plan reviews and witness testing, interconnection and EMT studies, harmonic, protection, arc-flash and insulation coordination studies, AHJ and utility approval support, factory and site acceptance testing, and commissioning. We work from 4 kV to 765 kV for data centers, EV charging, utilities, renewables and storage.
How Keentel Engineering Helps
Keentel Engineering supports SST projects from the first feasibility question to energization, as an independent owner's engineer and studies provider. We do not sell SST hardware.
| Service | What Keentel delivers | Typical client |
|---|---|---|
| Technology readiness review | Architecture, ratings, insulation basis, test evidence and risk register | Data center owners, investors, utilities |
| Specification and procurement support | Technical specification, bid evaluation on a normalized basis, evidence and witness rights | Owners, EPC contractors |
| EVT and DVT test plan review | Gap analysis against site, utility and code requirements; supplementary test specifications | Owners, SST developers |
| Witness testing | Independent witness reports for EVT, DVT and factory acceptance tests | Owners, lenders |
| Independent design review | DFMEA, requirement traceability and gate-review evidence | Developers, investors |
| Interconnection studies | Load characterization, IEEE 519 harmonic studies, ride-through and EMT (PSCAD) studies | Data centers, EV hubs, utilities |
| Protection and arc flash | Protection philosophy, AC and DC short-circuit, coordination and arc-flash studies (IEEE 1584, NFPA 70E) | All SST sites |
| Insulation coordination | Arrester selection and placement, temporary overvoltage and surge studies | Utilities, owners |
| Reliability and availability | Reliability block diagrams and availability models including common-mode elements | Data centers, utilities |
| Model validation | EMT and RMS model validation against test data; model packages for utilities | Developers, owners |
| Approvals | Standards matrix, AHJ classification memo, field-evaluation support, utility submittals | Owners, developers |
| Commissioning | Factory and site acceptance test procedures, energization plans, firmware and settings control | Owners, EPC contractors |
| Facility design | MV substations, 800 VDC distribution, MEP coordination | Data centers, EV hubs |
| NERC compliance | Where SST-fed facilities connect to the bulk electric system, compliance program support | Generator and large-load owners |
Why Clients Choose Keentel
- Independent advice. We do not manufacture or sell power electronics, so our recommendations serve the owner.
- Grid and device perspective together. Our engineers work on transmission and distribution studies, protection and power electronics, so we connect SST behavior to what utilities and AHJs require.
- Calculations you can check. Every recommendation comes with its basis and arithmetic, as in the worked examples in this guide.
- Full voltage range. From 4 kV distribution and 800 VDC data center buses to 765 kV transmission.
- Studies and design under one roof. Interconnection, protection, arc flash, insulation coordination, EMT and facility design without hand-offs between firms.
- Credentials. Florida registered engineering firm (Firm Registration No. 36853), NSPE, D-U-N-S registered, IEEE Senior Member leadership and BBB Accredited Business with an A+ rating, with offices in Tampa, Austin, Sacramento and Baltimore.
Talk to Keentel Engineering
Evaluating solid-state transformers for an AI data center, an EV charging hub or a utility pilot? Bringing an SST product through EVT and need an independent test plan review or witness testing? Talk to our engineers.
- Phone: (813) 389-7871
- Email: contact@keentelengineering.com
- Book a 15-minute call: calendly.com/keentel-engineering/15min
- Web: keentelengineering.com
References
Standards status and online sources were checked in November 2026. Online sources were confirmed through search listings; readers should consult the source documents directly. Confirm the edition adopted by your utility, AHJ or specification.
History and research programs
- US Patent 3,517,300, Power converter circuits having a high frequency link (1970). https://patents.google.com/patent/US3517300
- US Patent 3,564,390, Power converter circuit operating as an electric potential transformer (1971). https://patents.google.com/patent/US3564390A/en
- US Patent 3,582,756, Polyphase power converter circuits having a high frequency transformer link (1971). https://patents.google.com/patent/US3582756A
- North Carolina State University, FREEDM Systems Center, About and Solid State Transformer pages. https://www.freedm.ncsu.edu/about and https://freedm.wordpress.ncsu.edu/sst
- US National Science Foundation, Creating an energy internet (NSF story on FREEDM). https://www.nsf.gov/news/creating-energy-internet
- ETH Zurich Research Collection, Fundamentals and Application Oriented Evaluation of Solid State Transformer Concepts. https://research-collection.ethz.ch/handle/20.500.11850/523658
- ETH Zurich Research Collection, Modeling and Design of Medium-Frequency Transformers for Future Medium-Voltage Power Electronics Interfaces. https://research-collection.ethz.ch/handle/20.500.11850/353785
- ETH Zurich Research Collection, 99% Efficient 10 kV SiC-Based 7 kV/400 V DC Transformer for Future Data Centers (accepted manuscript). https://research-collection.ethz.ch/bitstream/handle/20.500.11850/342562/3/21_99_Efficient_10kV_SiC-Based_7kV-400V_Rothmund_Accepted-Version_a.pdf
- NCSU FREEDM, MUSE SST for MV Grid Interconnection with Gen3 10 kV SiC MOSFETs, ECCE 2018. https://www.freedm.ncsu.edu/wp-content/uploads/2018/10/ECCE-2018-MUSE-SST-for-MV-Grid-Interconnection-with-Gen3-10-kV-SiC-MOSFETs-Anurag-Acharya-Probayow-Bhattacharya.pdf
- NIST, MV grid and SiC device presentation (2016). https://www.nist.gov/system/files/documents/pml/high_megawatt/Bhattacharya_NIST-DOE-MV-Grid-presentation-April152016_sbver5.pdf
Medium-frequency transformers and insulation
- Sandia National Laboratories, High Power Medium Frequency Transformers in Medium Voltage Power Electronics (2025). https://www.sandia.gov/app/uploads/sites/273/2025/08/High-Power-Medium-Frequency-Transformers-in-Medium-Voltage-Power-Electronics_-Zhicheng-Guo_ASU-1.pdf
- TU Delft repository, Partial Discharge Behavior of High Frequency Transformer Insulation under High Voltage PWM Stress. https://repository.tudelft.nl/record/uuid:33ffecb3-def7-4b28-bfd2-9c96203a66de
- OSTI, report on medium-frequency transformer insulation (2025). https://www.osti.gov/biblio/2561317
Dual active bridge
- An Insight into the Dynamics of a Dual Active Bridge (arXiv, 2022). https://arxiv.org/pdf/2207.11672
- R. W. De Doncker, D. M. Divan and M. H. Kheraluwala, A three-phase soft-switched high-power-density DC/DC converter for high-power applications, IEEE Transactions on Industry Applications, 1991.
Applications and industry developments
- Data Center Knowledge, Solid-State Transformers Power Next-Gen AI Data Centers. https://www.datacenterknowledge.com/energy-power-supply/solid-state-transformers-power-next-gen-ai-data-centers
- eeNews Europe, Solid state transformers at the heart of 800V AI datacentre power. https://www.eenewseurope.com/en/solid-state-transformers-at-the-heart-of-800v-ai-datacentre-power
- National Renewable Energy Laboratory, Evaluating EV charging stations operation with medium voltage solid-state transformers. https://research-hub.nrel.gov/en/publications/evaluating-ev-charging-stations-operation-with-medium-voltage-sol/
- OSTI, SST and EV charging research reports. https://www.osti.gov/servlets/purl/2371492
- US Department of Energy, $18 Million for Flexible, Innovative Transformers (FITT). https://www.energy.gov/node/4837821
- T&D World, DOE selects nine projects to receive about $20 million through flexible innovative transformer technologies funding. https://tdworld.com/electric-utility-operations/tools-and-technologies/news/55247901/doe-selects-nine-projects-to-receive-about-20-million-through-flexible-innovative-transformer-technologies-funding
- ARPA-E, CIRCUITS project descriptions. https://arpa-e.energy.gov/sites/default/files/2025-01/Project%20Descriptions_CIRCUITS.pdf
- US Department of Energy, ARPA-E past grid hardware projects and vision for the future (2024). https://www.energy.gov/sites/default/files/2024-06/ARPA-E%20Past%20Grid%20Hardware%20Projects%20and%20Vision%20for%20the%20Future%20by%20Dr.%20Isik%20Kizilyalli%20and%20Dr.%20Johan%20Enslin_v6.pdf
- FREEDM, Active Substations presentation (2026). https://www.freedm.ncsu.edu/wp-content/uploads/2026/02/02-Enslin-Active-Substations.pdf
Standards and codes
- IEEE Std C57.12.00, General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers.
- IEEE Std C57.12.01-2020, General Requirements for Dry-Type Distribution and Power Transformers. https://standards.ieee.org/standard/C57_12_01_2020.html
- IEEE Std C57.12.91, Test Code for Dry-Type Distribution and Power Transformers.
- IEEE Std 519-2022, Standard for Harmonic Control in Electric Power Systems.
- IEEE Std C62.11 (metal-oxide surge arresters), IEEE Std C62.22 (arrester application guide), IEEE C62.41 and C62.45 (low-voltage surge environment and testing).
- IEEE Std 1547-2018 and IEEE 1547a-2020; IEEE Std 2800-2022.
- IEEE Std 1584 (arc-flash hazard calculations); IEEE Std 142 (grounding); IEEE Std 1100 (powering and grounding electronic equipment); IEEE Std 693 (seismic design of substations).
- IEEE standards project listing related to solid-state transformer practice. https://standards.ieee.org/ieee/3105/10707/
- IEC 62477-2:2018, Safety requirements for power electronic converter systems and equipment, Part 2: Power electronic converters from 1,000 V AC or 1,500 V DC up to 36 kV AC or 54 kV DC. https://webstore.iec.ch/en/publication/31546
- IEC 61800-5-1 (adjustable speed drive safety); IEC 60270 (partial discharge measurement); IEC 60664-1 (insulation coordination for low-voltage equipment).
- UL 1741, Inverters, Converters, Controllers and Interconnection System Equipment for Use With Distributed Energy Resources.
- NFPA 70, National Electrical Code; NFPA 70E, Standard for Electrical Safety in the Workplace; ANSI C2, National Electrical Safety Code.
- FCC 47 CFR Part 15 (unintentional radiators); CISPR 11 (industrial, scientific and medical equipment emissions).
Product development practice
- Wikipedia, Engineering validation test. https://en.wikipedia.org/wiki/Engineering_validation_test
- Formlabs, Validation Testing in Product Development: From POC to EVT, DVT, PVT, and Mass Production. https://formlabs.com/blog/validation-testing-product-development-poc-evt-dvt-pvt-mp/
- Instrumental, Hardware engineers speak in code: EVT, DVT, PVT decoded. https://instrumental.com/?p=505
Textbooks
- N. Mohan, T. M. Undeland and W. P. Robbins, Power Electronics: Converters, Applications, and Design, Wiley.
- C. W. T. McLyman, Transformer and Inductor Design Handbook, CRC Press (area-product method).
- J. C. Das, Transients in Electrical Systems, McGraw-Hill.
Related Keentel guides
- 800 VDC for AI Data Centers and UPS
- 800 VDC vs 1,500 VDC
- LVDC Data Center Framework
- 800 VDC Rack Fault Protection
- 1 GW Data Center Explained
- Data Center Tiers for MEP Engineers
- Temporary vs Transient Overvoltages
- Harmonics in Plain English (IEEE 519)
- Joint Large-Load and Generation Studies
- PSCAD Parameter Fields
- NERC Compliance Services Guide
Disclaimer
This article is provided by Keentel Engineering for general technical education. It is not engineering, legal or procurement advice for any specific project. Worked examples use illustrative values chosen to show methods; device data, cost figures, failure rates, efficiency curves and test durations are not vendor data and must be replaced with project-specific information. Case studies are composites of typical project situations, with names, locations and numbers changed. Standards and online sources were checked in November 2026 through publicly available listings; consult the current editions and the authority having jurisdiction. Keentel Engineering accepts no liability for decisions made on the basis of this article without a project-specific
| Office | Address | Phone |
|---|---|---|
| Head Office — Tampa | 400 N Ashley Dr STE #2600, Tampa FL 33602 | (813) 389-7871 |
| Austin | 5900 Balcones Drive STE 100, Austin TX 78731 | (512) 591-0752 |
| Sacramento | 1401 21st St Ste R, Sacramento CA 95811 | (916) 913-4524 |
| Baltimore | 306 W Redwood St STE 200, Baltimore MD 21201 | (410) 225-2181 |

About the Author:
Sandip "Sonny" R. Patel, P.E.
IEEE Senior Member · Founder & CEO, Keentel Engineering
In 1995, Sonny Patel earned his Electrical Engineering degree from the University of Illinois. But degrees don't build legacies — action does.
For three decades, he has worked the power industry from every side of the table: 16 years as a utility engineer at Exelon/Commonwealth Edison; generation leadership across hydroelectric, industrial steam turbine, and a 9 GW renewable fleet; NERC Regional Entity Senior Compliance Engineer and Audit Team Lead, auditing some of the nation's largest utilities; and testing and commissioning lead on equipment up to 765 kV — the very top of the North American grid.Utility. Generator. Regulator. Consultant. Few engineers have seen all four seats. Fewer still have sat in them.
His experience spans nuclear, hydro, conventional generation, renewables, oil and gas, mining — and today's data centers, where he is authoring a three-book series on data center design. He is a Licensed Professional Engineer in six states and a Licensed Electrical Contractor in Florida (Unlimited EC) — he doesn't just design the work; he's qualified to stand behind its execution.Today, as Founder and CEO of Keentel Engineering, Sonny leads a nationwide team of engineers delivering substation design, power system studies, NERC compliance, and commissioning — done right, coast to coast.Three decades. Every side of the table. One standard: accountable engineering.
Services

Let's Discuss Your Project
Let's book a call to discuss your electrical engineering project that we can help you with.

About the Author:
Sandip "Sonny" R. Patel, P.E.
IEEE Senior Member · Founder & CEO, Keentel Engineering
In 1995, Sonny Patel earned his Electrical Engineering degree from the University of Illinois. But degrees don't build legacies — action does.
For three decades, he has worked the power industry from every side of the table: 16 years as a utility engineer at Exelon/Commonwealth Edison; generation leadership across hydroelectric, industrial steam turbine, and a 9 GW renewable fleet; NERC Regional Entity Senior Compliance Engineer and Audit Team Lead, auditing some of the nation's largest utilities; and testing and commissioning lead on equipment up to 765 kV — the very top of the North American grid.
Utility. Generator. Regulator. Consultant. Few engineers have seen all four seats. Fewer still have sat in them.
His experience spans nuclear, hydro, conventional generation, renewables, oil and gas, mining — and today's data centers, where he is authoring a three-book series on data center design. He is a Licensed Professional Engineer in six states and a Licensed Electrical Contractor in Florida (Unlimited EC) — he doesn't just design the work; he's qualified to stand behind its execution.
Today, as Founder and CEO of Keentel Engineering, Sonny leads a nationwide team of engineers delivering substation design, power system studies, NERC compliance, and commissioning — done right, coast to coast.Three decades. Every side of the table. One standard: accountable engineering.
Leave a Comment
We will get back to you as soon as possible.
Please try again later.

















